X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816012904000

Well Details

Well ID: 0816012904000
Loading map...
Location: 00/04-29-081-01W6/0
Location Alias: 00/04-29-81-01 W6M
Location Alias 2: 00/04-29-081-01 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 29
County/Municipality: Municipal District of Fairview No. 136
Well Name: SHELL 1 B.A. BLUESKY 4-29-81-1
Operator Name: Shell Canada Limited
License Number: 0001893
License Date: 1950-08-16
License Status: RecExempt
Spud Date: 1950-09-08
Final Drill Date: 1950-12-08
Well Total Depth: 2211.30 m
Surface Hole Latitude: 56.045427
Surface Hole Longitude: -118.127496

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-16 Obtained License
1950-09-19 Drill Stem Test Performed
1950-09-20 Drill Stem Test Performed
1950-09-21 Drill Stem Test Performed
1950-09-23 Drill Stem Test Performed
1950-09-25 Drill Stem Test Performed
1950-09-26 Drill Stem Test Performed
1950-09-27 Drill Stem Test Performed
1950-09-28 Drill Stem Test Performed
1950-09-29 Drill Stem Test Performed
1950-09-30 Drill Stem Test Performed
1950-10-02 Drill Stem Test Performed
1950-10-05 Drill Stem Test Performed
1950-11-28 Drill Stem Test Performed
1950-12-04 Drill Stem Test Performed
1950-12-08 Drill Stem Test Performed
1950-12-08 Finished Drilling
1950-12-09 Drill Stem Test Performed
1950-12-13 Production Casing Operation Performed
1950-12-17 Perforation Treatment Performed - Selective Bullet Perforations
1950-12-18 Drill Stem Test Performed
1950-12-18 Perforation Treatment Performed - Bullet Perforation
1950-12-19 Drill Stem Test Performed
1950-12-22 Perforation Treatment Performed - Bullet Perforation
1950-12-24 Perforation Treatment Performed - Acid Wash - No Pressure
1950-12-25 Perforation Treatment Performed - Acid Wash - No Pressure
1950-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-30 Drill Stem Test Performed
1951-01-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1951-01-01 Perforation Treatment Performed - Bullet Perforation
1951-01-02 Drill Stem Test Performed
1951-01-02 Perforation Treatment Performed - Selective Bullet Perforations
1951-01-03 Drill Stem Test Performed
1951-01-03 Perforation Treatment Performed - Bullet Perforation
1951-01-11 Well Mode changed to Drilled and Cased
1953-01-05 Well Began Production
1953-01-05 Well Fluid changed to Gas
1953-01-05 Well Mode changed to Flowing
1957-01-17 Perforation Treatment Performed - Cement Squeeze
1957-07-21 Perforation Treatment Performed - Bullet Perforation
1957-07-22 Perforation Treatment Performed - Cement Plug
1957-07-22 Well Abandoned
1957-07-22 Well Fluid changed to Gas
1957-07-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-17 Selective Bullet Perforations 983.00 983.00 0
1951-01-02 Selective Bullet Perforations 830.30 830.30 7
1951-01-03 Bullet Perforation 833.60 838.20 13
1957-01-17 Cement Squeeze 830.30 838.20 0
1957-07-21 Bullet Perforation 833.60 836.10 0
1957-07-22 Cement Plug 795.50 813.80 0
1950-12-18 Bullet Perforation 974.80 982.70 13
1950-12-22 Bullet Perforation 951.00 956.50 13
1950-12-22 Bullet Perforation 963.20 969.30 13
1950-12-24 Acid Wash 951.00 956.50 0
1950-12-25 Acid Wash 963.20 982.70 0
1950-12-29 Acid Treatment 951.00 982.70 0
1951-01-01 Bullet Perforation 983.30 986.90 16
1951-01-01 Packing Device Capped w/Cement 917.40 917.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References