If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0816012602002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.045736,"lon":-118.037453,"icon":""}]} |
| Location: 00/02-26-081-01W6/2 | |
| Location Alias: 00/02-26-81-01 W6M | |
| Location Alias 2: 00/02-26-081-01 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 081 | |
| Meridian: 6 | |
| Range: 01 | |
| Section: 26 | |
| County/Municipality: Municipal District of Fairview No. 136 | |
| Well Name: ADAMANT WHITELAW 2-26-81-1 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0360812 | |
| License Date: 2006-07-27 | |
| License Status: Suspension | |
| Spud Date: 2006-08-07 | |
| Final Drill Date: 2006-08-11 | |
| Well Total Depth: 1016.00 m | |
| Surface Hole Latitude: 56.045736 | |
| Surface Hole Longitude: -118.037453 |
| Date | Event |
|---|---|
| 2006-07-27 | Obtained License |
| 2006-08-09 | Surface Casing Operation Performed |
| 2006-08-11 | Finished Drilling |
| 2006-08-11 | Well Log Performed |
| 2006-08-11 | Well Mode changed to Drilled and Cased |
| 2006-08-12 | Drill Stem Test Performed |
| 2006-08-13 | Production Casing Operation Performed |
| 2006-08-13 | Rig Released |
| 2006-09-13 | Perforation Treatment Performed - Jet Perforation |
| 2006-10-17 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-05 | Well Began Production |
| 2006-11-05 | Well Fluid changed to Gas |
| 2006-11-05 | Well Mode changed to Flowing |
| 2008-03-24 | Perforation Treatment Performed - Cement Plug |
| 2008-03-24 | Perforation Treatment Performed - Jet Perforation |
| 2008-03-24 | Plug Back Performed |
| 2008-12-31 | Well Fluid changed to Gas |
| 2008-12-31 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-09-13 | Perforation | 853.50 | 856.50 | 17 |
| 2006-09-13 | Perforation | 835.50 | 836.50 | 17 |
| 2006-10-17 | Perforation | 434.00 | 435.50 | 17 |
| 2008-03-24 | Cement Plug | 822.00 | 830.00 | 0 |
| 2008-03-24 | Perforation | 421.50 | 422.50 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 1241 | 0.0 | 0.0 | 0.0 |
| 2007 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]