X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815091504002

Well Details

Well ID: 0815091504002
Loading map...
Location: 00/04-15-081-09W5/2
Location Alias: 00/04-15-81-09 W5M
Location Alias 2: 00/04-15-081-09 W5/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 09
Section: 15
County/Municipality: Northern Sunrise County
Well Name: CELTIC UTIKUMA 4-15-81-9
Operator Name: XTO Energy Canada ULC
License Number: 0062850
License Date: 1977-02-18
License Status: Suspension
Spud Date: 1977-08-18
Final Drill Date: 1977-09-04
Well Total Depth: 1809.00 m
Surface Hole Latitude: 56.018067
Surface Hole Longitude: -115.327210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-18 Obtained License
1977-09-04 Finished Drilling
1977-09-04 Well Mode changed to Drilled and Cased
1977-09-07 Drill Stem Test Performed
1977-09-09 Production Casing Operation Performed
1977-10-03 Perforation Treatment Performed - Jet Perforation
1977-11-16 Perforation Treatment Performed - Fractured
1978-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-11 Perforation Treatment Performed - Jet Perforation
1986-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-13 Perforation Treatment Performed - Casing Patch (Over Perfs)
1986-12-29 Well Began Injection
1986-12-29 Well Fluid changed to Water
1986-12-29 Well Type changed to Disposal
1987-06-01 Well Log Performed
1992-08-15 Perforation Treatment Performed - Jet Perforation
1995-11-13 Well Fluid changed to Water
1995-11-13 Well Type changed to Injection
2004-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-02-01 Well Fluid changed to Water
2017-02-01 Well Mode changed to Suspended
2017-02-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-03 Perforation 1686.80 1687.40 7
2004-09-30 Acid Treatment 1756.90 1762.40 0
1977-10-03 Perforation 1688.00 1689.80 7
1977-11-16 Fracture 1686.80 1689.80 0
1978-08-25 Acid Treatment 1686.80 1689.80 0
1986-07-11 Perforation 1756.90 1762.40 7
1986-07-12 Acid Treatment 1756.90 1762.40 0
1986-07-13 Casing Patch 1686.80 1689.90 0
1992-08-15 Perforation 1748.30 1756.90 13
2004-09-30 Acid Treatment 1748.30 1756.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[5]

References