X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815091007000

Well Details

Well ID: 0815091007000
Loading map...
Location: 00/07-10-081-09W5/0
Location Alias: 00/07-10-81-09 W5M
Location Alias 2: 00/07-10-081-09 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 09
Section: 10
County/Municipality: Northern Sunrise County
Well Name: CELTIC NIPISI 7-10-81-9
Operator Name: XTO Energy Canada ULC
License Number: 0081495
License Date: 1980-03-04
License Status: Suspension
Spud Date: 1980-03-13
Final Drill Date: 1980-03-26
Well Total Depth: 1781.00 m
Surface Hole Latitude: 56.004410
Surface Hole Longitude: -115.314136

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-04 Obtained License
1980-03-26 Finished Drilling
1980-03-26 Well Mode changed to Drilled and Cased
1980-03-27 Drill Stem Test Performed
1980-03-29 Production Casing Operation Performed
1980-12-08 Perforation Treatment Performed - Jet Perforation
1980-12-08 Well Began Production
1980-12-08 Well Fluid changed to Crude Oil
1980-12-08 Well Mode changed to Pumping
1983-01-30 Perforation Treatment Performed - Jet Perforation
1983-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-03 Perforation Treatment Performed - Jet Perforation
1983-02-14 Well Fluid changed to Crude Oil
1983-02-14 Well Mode changed to Pumping
1984-11-10 Perforation Treatment Performed - Jet Perforation
1992-08-02 Perforation Treatment Performed - Cement Squeeze
1992-08-02 Plug Back Performed
2014-05-01 Well Fluid changed to Crude Oil
2014-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-08 Perforation 1736.00 1737.00 10
1980-12-08 Perforation 1738.00 1740.00 10
1983-01-30 Perforation 1676.70 1678.70 7
1983-02-01 Acid Treatment 1676.70 1678.70 0
1983-02-03 Perforation 1676.70 1678.70 7
1984-11-10 Perforation 1735.00 1736.00 7
1992-08-02 Cement Squeeze 1676.70 1678.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 323 0.0 0.0 0.0
1981 4125 0.0 0.0 0.0
1982 4951 0.0 0.0 0.0
1983 5393 0.0 0.0 0.0
1984 6671 0.0 0.0 0.0
1985 7801 0.0 0.0 0.0
1986 7236 0.0 0.0 0.0
1987 7757 0.0 0.0 0.0
1988 8106 0.0 0.0 0.0
1989 7659 0.0 0.0 0.0
1990 8043 0.0 0.0 0.0
1991 8580 0.0 0.0 0.0
1992 7898 0.0 0.0 0.0
1993 8325 0.0 0.0 0.0
1994 8126 0.0 0.0 0.0
1995 7129 0.0 0.0 0.0
1996 8288 0.0 0.0 0.0
1997 8131 0.0 0.0 0.0
1998 7871 0.0 0.0 0.0
1999 8502 0.0 0.0 0.0
2000 8489 0.0 0.0 0.0
2001 8482 0.0 0.0 0.0
2002 8609 0.0 0.0 0.0
2003 8697 0.0 0.0 0.0
2004 8599 0.0 0.0 0.0
2005 8352 0.0 0.0 0.0
2006 8485 0.0 0.0 0.0
2007 8374 0.0 0.0 0.0
2008 8364 0.0 0.0 0.0
2009 8400 0.0 0.0 0.0
2010 8691 0.0 0.0 0.0
2011 7749 0.0 0.0 0.0
2012 8586 0.0 0.0 0.0
2013 3301 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-08-08 No Incident Encountered 0.00 0.00
1994-05-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References