X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0814242006002

Well Details

Well ID: 0814242006002
Loading map...
Location: 00/06-20-081-24W4/2
Location Alias: 00/06-20-81-24 W4M
Location Alias 2: 00/06-20-081-24 W4/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 4
Range: 24
Section: 20
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PEOC HOOLE 6-20-81-24
Operator Name: Sequoia Resources Corp.
License Number: 0132019
License Date: 1988-02-08
License Status: Suspension
Spud Date: 1988-02-09
Final Drill Date: 1988-02-13
Well Total Depth: 487.00 m
Surface Hole Latitude: 56.032617
Surface Hole Longitude: -113.728201

For data sources see[1][2]

Well History

Date Event
1988-02-08 Obtained License
1988-02-09 Surface Casing Operation Performed
1988-02-13 Finished Drilling
1988-02-13 Well Log Performed
1988-02-13 Well Mode changed to Drilled and Cased
1988-02-14 Production Casing Operation Performed
1988-02-15 Rig Released
1988-02-15 Well Log Performed
1988-02-19 Well Log Performed
1988-02-20 Perforation Treatment Performed - Jet Perforation
1988-02-20 Well Log Performed
1988-02-21 Perforation Treatment Performed - Remedial Casing
1988-02-26 Well Log Performed
1988-02-28 Perforation Treatment Performed - Jet Perforation
1988-02-29 Perforation Treatment Performed - Jet Perforation
1988-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-01 Well Log Performed
1988-03-02 Perforation Treatment Performed - Jet Perforation
1988-11-26 Well Began Production
1988-11-26 Well Fluid changed to Gas
1988-11-26 Well Mode changed to Flowing
1989-08-17 Well Log Performed
1995-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-01-19 Perforation Treatment Performed - Jet Perforation
2009-01-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-20 Perforation 318.00 318.50 13
1988-02-21 Remedial Casing Cementing 318.00 318.50 0
1988-02-28 Perforation 475.00 477.30 13
1988-02-29 Perforation 464.50 468.00 13
1988-03-01 Acid Treatment 464.50 468.00 0
1988-03-02 Perforation 430.00 432.50 13
1995-07-17 Acid Treatment 464.50 468.00 0
2009-01-19 Perforation 430.00 432.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 908 0.0 0.0 0.0
1989 8236 0.0 0.0 0.0
1990 7622 0.0 0.0 0.0
1991 7921 0.0 0.0 0.0
1992 7097 0.0 0.0 0.0
1993 8430 0.0 0.0 0.0
1994 8632 0.0 0.0 0.0
1995 8099 0.0 0.0 0.0
1996 8575 0.0 0.0 0.0
1997 8587 0.0 0.0 0.0
1998 8682 0.0 0.0 0.0
1999 8692 0.0 0.0 0.0
2000 8708 0.0 0.0 0.0
2001 8031 0.0 0.0 0.0
2002 7266 0.0 0.0 0.0
2003 8324 0.0 0.0 0.0
2004 7680 0.0 0.0 0.0
2005 8540 0.0 0.0 0.0
2006 8618 0.0 0.0 0.0
2007 8409 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8451 0.0 0.0 0.0
2010 8712 0.0 0.0 0.0
2011 8714 0.0 0.0 0.0
2012 7265 0.0 0.0 0.0
2013 8027 0.0 0.0 0.0
2014 8223 0.0 0.0 0.0
2015 8532 0.0 0.0 0.0
2016 8709 0.0 0.0 0.0
2017 8636 0.0 0.0 0.0
2018 1800 0.0 0.0 0.0

For data sources see[5]

References