X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0814240710002

Well Details

Well ID: 0814240710002
Loading map...
Location: 00/10-07-081-24W4/2
Location Alias: 00/10-07-81-24 W4M
Location Alias 2: 00/10-07-081-24 W4/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 4
Range: 24
Section: 07
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PEOC HOOLE 10-7-81-24
Operator Name: Sequoia Resources Corp.
License Number: 0048825
License Date: 1974-01-30
License Status: Suspension
Spud Date: 1975-01-25
Final Drill Date: 1975-02-05
Well Total Depth: 502.90 m
Surface Hole Latitude: 56.008844
Surface Hole Longitude: -113.746304

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-01-30 Obtained License
1975-02-01 Drill Stem Test Performed
1975-02-03 Perforation Treatment Performed - Open-Hole Completion
1975-02-03 Production Casing Operation Performed
1975-02-05 Drill Stem Test Performed
1975-02-05 Finished Drilling
1975-02-05 Well Mode changed to Drilled and Cased
1983-02-10 Perforation Treatment Performed - Jet Perforation
1983-09-24 Well Began Production
1983-09-24 Well Fluid changed to Gas
1983-09-24 Well Mode changed to Flowing
1991-07-10 Perforation Treatment Performed - Jet Perforation
1991-07-10 Well Log Performed
1994-01-20 Well Log Performed
1994-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-27 Well Log Performed
2010-01-31 Well Log Performed
2010-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-09 Plug Back Performed
2010-02-10 Perforation Treatment Performed - Jet Perforation
2010-02-10 Well Log Performed
2012-10-31 Well Fluid changed to Gas
2012-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-03 Open Hole/Barefoot Completion 457.20 502.90 0
1983-02-10 Perforation 431.90 434.30 10
1991-07-10 Perforation 431.00 434.00 13
1994-01-26 Acid Treatment 457.20 502.90 0
1994-01-27 Acid Treatment 431.00 434.30 0
2010-02-09 Packing Device Capped w/Cement 360.50 469.50 0
2010-02-10 Perforation 348.70 349.90 20
2010-02-10 Perforation 338.30 340.20 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4394 0.0 0.0 0.0
1984 7706 0.0 0.0 0.0
1985 3565 0.0 0.0 0.0
1986 3912 0.0 0.0 0.0
1987 6083 0.0 0.0 0.0
1988 8229 0.0 0.0 0.0
1989 8098 0.0 0.0 0.0
1990 5865 0.0 0.0 0.0
1991 6696 0.0 0.0 0.0
1992 7135 0.0 0.0 0.0
1993 7374 0.0 0.0 0.0
1994 7436 0.0 0.0 0.0
1995 6799 0.0 0.0 0.0
1996 3951 0.0 0.0 0.0
1997 7626 0.0 0.0 0.0
1998 1209 0.0 0.0 0.0

For data sources see[5]

References