If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806130914002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.923954,"lon":-119.976536,"icon":""}]} |
Location: 00/14-09-080-13W6/2 | |
Location Alias: 00/14-09-80-13 W6M | |
Location Alias 2: 00/14-09-080-13 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 6 | |
Range: 13 | |
Section: 09 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF PCOUPE 14-9-80-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0348691 | |
License Date: 2006-01-12 | |
License Status: Suspension | |
Spud Date: 2006-01-24 | |
Final Drill Date: 2006-02-05 | |
Well Total Depth: 1870.00 m | |
Surface Hole Latitude: 55.923954 | |
Surface Hole Longitude: -119.976536 |
Date | Event |
---|---|
2006-01-12 | Obtained License |
2006-01-26 | Surface Casing Operation Performed |
2006-02-05 | Finished Drilling |
2006-02-05 | Well Log Performed |
2006-02-05 | Well Mode changed to Drilled and Cased |
2006-02-06 | Well Log Performed |
2006-02-07 | Drill Stem Test Performed |
2006-02-08 | Production Casing Operation Performed |
2006-02-09 | Rig Released |
2006-02-13 | Plug Back Performed |
2006-02-15 | Perforation Treatment Performed - Jet Perforation |
2006-02-15 | Well Log Performed |
2006-02-16 | Well Log Performed |
2006-02-17 | Perforation Treatment Performed - Fractured |
2006-02-24 | Perforation Treatment Performed - Jet Perforation |
2006-02-25 | Well Log Performed |
2006-06-14 | Well Began Production |
2006-06-14 | Well Fluid changed to Gas |
2006-06-14 | Well Mode changed to Flowing |
2016-01-01 | Well Fluid changed to Gas |
2016-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-15 | Perforation | 1783.00 | 1788.00 | 17 |
2006-02-17 | Fracture | 1783.00 | 1788.00 | 0 |
2006-02-24 | Perforation | 1255.00 | 1257.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1031 | 0.0 | 0.0 | 0.0 |
For data sources see[5]