X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806122506000

Well Details

Well ID: 0806122506000
Loading map...
Location: 00/06-25-080-12W6/0
Location Alias: 00/06-25-80-12 W6M
Location Alias 2: 00/06-25-080-12 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 12
Section: 25
County/Municipality: Saddle Hills County
Well Name: PENN WEST POUCE COUPE 6-25-80-12
Operator Name: Obsidian Energy Ltd.
License Number: 0107247
License Date: 1984-05-23
License Status: Abandoned
Spud Date: 1984-06-01
Final Drill Date: 1984-06-15
Well Total Depth: 1667.00 m
Surface Hole Latitude: 55.962933
Surface Hole Longitude: -119.736994

For data sources see[1][2]

Well History

Date Event
1984-05-23 Obtained License
1984-06-03 Surface Casing Operation Performed
1984-06-15 Finished Drilling
1984-06-17 Drill Stem Test Performed
1984-06-17 Well Log Performed
1984-06-18 Drill Stem Test Performed
1984-06-19 Drill Stem Test Performed
1984-06-20 Production Casing Operation Performed
1984-06-20 Rig Released
1984-07-26 Perforation Treatment Performed - Jet Perforation
1984-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-29 Perforation Treatment Performed - Fractured
1984-08-04 Well Mode changed to Drilled and Cased
1984-10-05 Well Began Production
1984-10-05 Well Fluid changed to Crude Oil
1984-10-05 Well Mode changed to Pumping
1985-09-22 Well Fluid changed to Crude Oil
1985-09-22 Well Mode changed to Suspended
1993-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-04 Plug Back Performed
1993-10-04 Well Fluid changed to Crude Oil
1993-10-04 Well Log Performed
1993-10-04 Well Mode changed to Abandoned Zone
1993-10-05 Perforation Treatment Performed - Jet Perforation
2001-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-07 Perforation Treatment Performed - Jet Perforation
2001-06-07 Plug Back Performed
2001-06-07 Well Log Performed
2001-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-08 Perforation Treatment Performed - Remedial Casing
2001-06-10 Well Abandoned
2001-07-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-26 Perforation 1594.50 1596.50 13
1984-07-27 Acid Treatment 1594.50 1596.50 0
1984-07-29 Fracture 1594.50 1596.50 0
1993-10-04 Packing Device Capped w/Cement 1583.00 1591.00 0
1993-10-05 Perforation 1312.50 1314.50 13
2001-06-07 Packing Device Capped w/Cement 1297.00 1305.00 0
2001-06-07 Perforation 410.00 411.00 14
2001-06-08 Remedial Casing Cementing 410.00 411.00 0
2001-06-08 Packing Device Capped w/Cement 387.20 402.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1393 0.0 0.0 0.0
1985 3781 0.0 0.0 0.0

For data sources see[5]

References