If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806120710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.921546,"lon":-119.86327,"icon":""}]} |
Location: 00/10-07-080-12W6/0 | |
Location Alias: 00/10-07-80-12 W6M | |
Location Alias 2: 00/10-07-080-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 6 | |
Range: 12 | |
Section: 07 | |
County/Municipality: Saddle Hills County | |
Well Name: CHAMBERLAIN POUCE COUPE 10-7-80-12 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0014180 | |
License Date: 1957-10-25 | |
License Status: RecExempt | |
Spud Date: 1957-11-19 | |
Final Drill Date: 1958-01-27 | |
Well Total Depth: 2260.70 m | |
Surface Hole Latitude: 55.921546 | |
Surface Hole Longitude: -119.863270 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-10-25 | Obtained License |
1957-11-23 | Drill Stem Test Performed |
1957-11-24 | Drill Stem Test Performed |
1957-11-25 | Drill Stem Test Performed |
1957-11-26 | Drill Stem Test Performed |
1957-11-27 | Drill Stem Test Performed |
1957-11-29 | Drill Stem Test Performed |
1957-11-30 | Drill Stem Test Performed |
1957-12-02 | Drill Stem Test Performed |
1957-12-03 | Drill Stem Test Performed |
1957-12-04 | Drill Stem Test Performed |
1957-12-05 | Drill Stem Test Performed |
1957-12-08 | Drill Stem Test Performed |
1957-12-11 | Drill Stem Test Performed |
1957-12-13 | Drill Stem Test Performed |
1957-12-14 | Drill Stem Test Performed |
1957-12-17 | Drill Stem Test Performed |
1957-12-18 | Drill Stem Test Performed |
1958-01-13 | Drill Stem Test Performed |
1958-01-14 | Drill Stem Test Performed |
1958-01-27 | Finished Drilling |
1958-01-31 | Production Casing Operation Performed |
1958-02-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
1958-02-02 | Perforation Treatment Performed - Bullet Perforation |
1958-07-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1958-07-04 | Well Abandoned |
1958-07-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-02-02 | Bullet Perforation | 703.50 | 709.60 | 13 |
1958-02-02 | Bullet Perforation | 703.50 | 706.50 | 13 |
1958-02-02 | Acid Wash | 703.50 | 709.60 | 0 |
1958-07-04 | Packing Device Capped w/Cement | 667.50 | 667.50 | 0 |
For data sources see[4]