X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806120510000

Well Details

Well ID: 0806120510000
Loading map...
Location: 00/10-05-080-12W6/0
Location Alias: 00/10-05-80-12 W6M
Location Alias 2: 00/10-05-080-12 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 12
Section: 05
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPE 10-5-80-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0074746
License Date: 1979-03-05
License Status: Suspension
Spud Date: 1979-06-07
Final Drill Date: 1979-07-06
Well Total Depth: 2420.00 m
Surface Hole Latitude: 55.908500
Surface Hole Longitude: -119.836232

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-05 Obtained License
1979-07-06 Finished Drilling
1979-07-07 Well Log Performed
1979-07-08 Drill Stem Test Performed
1979-07-09 Drill Stem Test Performed
1979-07-11 Production Casing Operation Performed
1979-08-06 Perforation Treatment Performed - Jet Perforation
1979-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-16 Perforation Treatment Performed - Fractured
1980-01-24 Well Mode changed to Drilled and Cased
1986-11-03 Well Log Performed
1986-11-06 Well Log Performed
1986-11-07 Perforation Treatment Performed - Jet Perforation
1986-11-09 Perforation Treatment Performed - Cement Squeeze
1986-11-12 Well Log Performed
1986-11-13 Perforation Treatment Performed - Fractured
1986-11-13 Perforation Treatment Performed - Jet Perforation
1986-11-19 Perforation Treatment Performed - Fractured
1986-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-05 Well Began Production
1986-12-05 Well Fluid changed to Gas
1986-12-05 Well Mode changed to Flowing
1989-01-29 Perforation Treatment Performed - Fractured
1989-01-29 Perforation Treatment Performed - Jet Perforation
1989-01-29 Well Log Performed
1989-02-07 Perforation Treatment Performed - Fractured
1989-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-20 Well Log Performed
1995-11-17 Well Fluid changed to Gas
1995-11-17 Well Mode changed to Suspended
2001-02-16 Well Fluid changed to Gas
2001-02-16 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-06 Perforation 2334.50 2340.50 7
1989-01-29 Perforation 2236.00 2239.00 19
1989-01-29 Perforation 2241.00 2244.00 19
1989-01-29 Fracture 2236.00 2244.00 0
1989-02-07 Fracture 2236.00 2244.00 0
1989-02-08 Acid Treatment 2236.00 2244.00 0
1979-08-08 Acid Treatment 2334.50 2340.50 0
1979-10-16 Fracture 2334.50 2340.50 0
1986-11-07 Perforation 2353.00 2354.00 14
1986-11-09 Cement Squeeze 2334.50 2354.00 0
1986-11-13 Perforation 2328.00 2335.00 14
1986-11-13 Fracture 2328.00 2335.00 0
1986-11-19 Fracture 2328.00 2335.00 0
1986-11-28 Acid Treatment 2328.00 2335.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 542 0.0 0.0 0.0
1987 8132 0.0 0.0 0.0
1988 7100 0.0 0.0 0.0
1989 3174 0.0 0.0 0.0
1990 104 0.0 0.0 0.0
1991 1067 0.0 0.0 0.0
1992 3484 0.0 0.0 0.0
1993 3746 0.0 0.0 0.0

For data sources see[5]

References