X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806120306000

Well Details

Well ID: 0806120306000
Loading map...
Location: 00/06-03-080-12W6/0
Location Alias: 00/06-03-80-12 W6M
Location Alias 2: 00/06-03-080-12 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 12
Section: 03
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF PCOUPE 6-3-80-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0134027
License Date: 1988-05-25
License Status: Suspension
Spud Date: 1988-05-27
Final Drill Date: 1988-06-17
Well Total Depth: 2455.00 m
Surface Hole Latitude: 55.902236
Surface Hole Longitude: -119.793885

For data sources see[1][2]

Well History

Date Event
1988-05-25 Obtained License
1988-05-29 Surface Casing Operation Performed
1988-06-17 Finished Drilling
1988-06-18 Well Log Performed
1988-06-20 Drill Stem Test Performed
1988-06-22 Production Casing Operation Performed
1988-06-22 Rig Released
1988-09-01 Well Log Performed
1988-09-02 Well Log Performed
1988-09-03 Perforation Treatment Performed - Jet Perforation
1988-09-10 Well Mode changed to Drilled and Cased
1988-12-12 Well Began Production
1988-12-12 Well Fluid changed to Gas
1988-12-12 Well Mode changed to Flowing
1991-11-29 Perforation Treatment Performed - Jet Perforation
1991-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-14 Perforation Treatment Performed - Fractured
1992-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-13 Perforation Treatment Performed - Cement Squeeze
2008-01-01 Well Fluid changed to Gas
2008-01-01 Well Mode changed to Pumping
2018-04-07 Well Fluid changed to Gas
2018-04-07 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-03 Perforation 2335.00 2364.00 13
1991-11-29 Perforation 2303.50 2309.00 14
1991-12-01 Acid Treatment 2303.50 2309.00 0
1991-12-14 Fracture 2303.50 2309.00 0
1992-08-13 Acid Treatment 2303.50 2309.00 0
1992-08-13 Cement Squeeze 2303.50 2309.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 281 0.0 0.0 0.0
1989 8242 0.0 0.0 0.0
1990 8154 0.0 0.0 0.0
1991 6984 0.0 0.0 0.0
1992 7678 0.0 0.0 0.0
1993 8314 0.0 0.0 0.0
1994 8327 0.0 0.0 0.0
1995 8452 0.0 0.0 0.0
1996 8680 0.0 0.0 0.0
1997 8652 0.0 0.0 0.0
1998 8564 0.0 0.0 0.0
1999 8478 0.0 0.0 0.0
2000 8692 0.0 0.0 0.0
2001 8574 0.0 0.0 0.0
2002 8651 0.0 0.0 0.0
2003 8721 0.0 0.0 0.0
2004 8666 0.0 0.0 0.0
2005 8626 0.0 0.0 0.0
2006 8195 0.0 0.0 0.0
2007 8446 0.0 0.0 0.0
2008 6522 0.0 0.0 0.0
2009 8095 0.0 0.0 0.0
2010 8513 0.0 0.0 0.0
2011 6876 0.0 0.0 0.0
2012 8581 0.0 0.0 0.0
2013 7666 0.0 0.0 0.0
2014 6941 0.0 0.0 0.0
2015 4963 0.0 0.0 0.0
2016 1272 0.0 0.0 0.0
2017 652 0.0 0.0 0.0

For data sources see[5]

References