X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806091114000

Well Details

Well ID: 0806091114000
Loading map...
Location: 00/14-11-080-09W6/0
Location Alias: 00/14-11-80-09 W6M
Location Alias 2: 00/14-11-080-09 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 09
Section: 11
County/Municipality: Saddle Hills County
Well Name: BP ET AL KSITUAN 14-11-80-9
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0086375
License Date: 1980-10-16
License Status: RecCertified
Spud Date: 1980-10-21
Final Drill Date: 1980-11-27
Well Total Depth: 2455.00 m
Surface Hole Latitude: 55.926412
Surface Hole Longitude: -119.294390

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-16 Obtained License
1980-11-27 Finished Drilling
1980-12-01 Drill Stem Test Performed
1980-12-02 Drill Stem Test Performed
1980-12-04 Drill Stem Test Performed
1980-12-05 Drill Stem Test Performed
1980-12-06 Drill Stem Test Performed
1980-12-08 Drill Stem Test Performed
1980-12-12 Production Casing Operation Performed
1981-01-30 Perforation Treatment Performed - Jet Perforation
1981-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-04 Perforation Treatment Performed - Jet Perforation
1981-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-13 Perforation Treatment Performed - Jet Perforation
1981-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-18 Well Abandoned
1981-02-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-30 Perforation 2300.00 2305.00 7
1981-02-02 Acid Treatment 2300.00 2305.00 0
1981-02-03 Packing Device Capped w/Cement 2290.00 2290.00 0
1981-02-04 Perforation 1843.50 1845.00 6
1981-02-10 Packing Device Capped w/Cement 1815.00 1815.00 0
1981-02-13 Perforation 1526.00 1530.50 6
1981-02-16 Acid Treatment 1526.00 1530.50 0
1981-02-18 Packing Device Capped w/Cement 1485.00 1515.00 0

For data sources see[4]



References