If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806082109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.941033,"lon":-119.15078,"icon":""}]} |
Location: 00/09-21-080-08W6/0 | |
Location Alias: 00/09-21-80-08 W6M | |
Location Alias 2: 00/09-21-080-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 6 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ MIRAGE 9-21-80-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0470527 | |
License Date: 2014-10-08 | |
License Status: Suspension | |
Spud Date: 2014-11-01 | |
Final Drill Date: 2014-11-12 | |
Well Total Depth: 3250.00 m | |
Surface Hole Latitude: 55.941033 | |
Surface Hole Longitude: -119.150780 |
Date | Event |
---|---|
2014-10-08 | Obtained License |
2014-11-02 | Surface Casing Operation Performed |
2014-11-02 | Well Log Performed |
2014-11-04 | Direction Drilling Operation Performed - Deviate |
2014-11-05 | Direction Drilling Operation Performed - Horizontal |
2014-11-06 | Well Log Performed |
2014-11-07 | Intermediate Casing Operation Performed |
2014-11-12 | Finished Drilling |
2014-11-12 | Well Log Performed |
2014-11-12 | Well Mode changed to Drilled and Cased |
2014-11-13 | Liner Casing Operation Performed |
2014-11-14 | Rig Released |
2014-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2014-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-11-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-04-10 | Well Began Production |
2015-04-10 | Well Fluid changed to Crude Oil |
2015-04-10 | Well Mode changed to Pumping |
2019-05-31 | Well Fluid changed to Crude Oil |
2019-05-31 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-11-01 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-11-04 | 1001.90 | Deviate (5 - 79 degrees) |
2014-11-05 | 1515.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-11-21 | Multi-Stage Fracture | 3153.90 | 3154.00 | 0 |
2014-11-27 | Multi-Stage Fracture | 2717.80 | 2717.90 | 0 |
2014-11-27 | Multi-Stage Fracture | 2662.10 | 2662.20 | 0 |
2014-11-27 | Multi-Stage Fracture | 2606.50 | 2606.60 | 0 |
2014-11-27 | Multi-Stage Fracture | 2550.80 | 2550.90 | 0 |
2014-11-27 | Multi-Stage Fracture | 2495.20 | 2495.30 | 0 |
2014-11-27 | Multi-Stage Fracture | 2439.60 | 2439.70 | 0 |
2014-11-27 | Multi-Stage Fracture | 2384.00 | 2384.10 | 0 |
2014-11-27 | Multi-Stage Fracture | 2328.30 | 2328.40 | 0 |
2014-11-27 | Multi-Stage Fracture | 2272.70 | 2272.80 | 0 |
2014-11-27 | Multi-Stage Fracture | 2217.20 | 2217.30 | 0 |
2014-11-21 | Acid Treatment | 3153.90 | 3154.00 | 0 |
2014-11-27 | Multi-Stage Fracture | 2161.60 | 2161.70 | 0 |
2014-11-27 | Multi-Stage Fracture | 2106.00 | 2106.10 | 0 |
2014-11-27 | Multi-Stage Fracture | 2023.70 | 2023.80 | 0 |
2014-11-27 | Multi-Stage Fracture | 1941.30 | 1941.40 | 0 |
2014-11-27 | Multi-Stage Fracture | 1859.00 | 1859.10 | 0 |
2014-11-27 | Multi-Stage Fracture | 1776.80 | 1776.90 | 0 |
2014-11-27 | Multi-Stage Fracture | 1721.20 | 1721.30 | 0 |
2014-11-27 | Multi-Stage Fracture | 1665.60 | 1665.70 | 0 |
2014-11-26 | Multi-Stage Fracture | 3107.10 | 3107.20 | 0 |
2014-11-26 | Multi-Stage Fracture | 3051.40 | 3051.50 | 0 |
2014-11-26 | Multi-Stage Fracture | 2995.80 | 2995.90 | 0 |
2014-11-26 | Multi-Stage Fracture | 2940.20 | 2940.30 | 0 |
2014-11-26 | Multi-Stage Fracture | 2884.50 | 2884.60 | 0 |
2014-11-26 | Multi-Stage Fracture | 2829.10 | 2829.20 | 0 |
2014-11-27 | Multi-Stage Fracture | 2773.40 | 2773.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-21 | 2014-11-27 | 1,307 | 4,189 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.4083 | N/A | |||
Atlas CRC-LT (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 1.6781 | N/A | ||
Phenolic Resin | 9003-35-4 | 100 | 1.6781 | N/A | ||||
Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 7.7916 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 7.7916 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 7.7917 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 7.7916 | N/A | ||||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 0.8505 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.8505 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.8505 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.8503 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0271 | N/A | |
Water | 7732-18-5 | 100 | 0.0271 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1012 | N/A | |
Water | 7732-18-5 | 100 | 0.1012 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.052 | N/A | |
CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0908 | N/A | |
Methanol | 67-56-1 | 100 | 0.0908 | N/A | ||||
Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0908 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0908 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-11-19 | 2014-11-20 | Surface Water - Runoff | 1413 |
2014-11-21 | 2014-11-22 | Surface Water - Runoff | 1817 |
2014-11-21 | 2014-11-21 | Surface Water - Runoff | 288 |
2014-11-26 | 2014-11-27 | Surface Water - Runoff | 517 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 3361 | 0.0 | 0.0 | 0.0 |
2016 | 5211 | 0.0 | 0.0 | 0.0 |
2017 | 1492 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-11-12 | No Incident Encountered | 0.00 | 0.00 |
2014-12-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]