X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806052815000

Well Details

Well ID: 0806052815000
Loading map...
Location: 00/15-28-080-05W6/0
Location Alias: 00/15-28-80-05 W6M
Location Alias 2: 00/15-28-080-05 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 05
Section: 28
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL ET AL RINGS 15-28-80-5
Operator Name: Canadian Natural Resources Limited
License Number: 0152612
License Date: 1992-06-02
License Status: RecCertified
Spud Date: 1992-06-16
Final Drill Date: 1992-07-01
Well Total Depth: 2225.00 m
Surface Hole Latitude: 55.968539
Surface Hole Longitude: -118.715907

For data sources see[1][2]

Well History

Date Event
1992-04-07 Well Log Performed
1992-06-02 Obtained License
1992-06-18 Surface Casing Operation Performed
1992-07-01 Finished Drilling
1992-07-01 Well Log Performed
1992-07-01 Well Mode changed to Drilled and Cased
1992-07-03 Drill Stem Test Performed
1992-07-06 Production Casing Operation Performed
1992-07-06 Rig Released
1992-07-09 Well Log Performed
1992-07-11 Perforation Treatment Performed - Jet Perforation
1992-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-12 Well Began Production
1992-07-12 Well Fluid changed to Crude Oil
1992-07-12 Well Mode changed to Flowing
1992-08-23 Well Fluid changed to Crude Oil
1992-08-23 Well Mode changed to Pumping
1993-03-16 Well Log Performed
1993-03-17 Perforation Treatment Performed - Jet Perforation
1993-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-26 Well Log Performed
1993-07-27 Well Log Performed
1993-07-28 Perforation Treatment Performed - Jet Perforation
1993-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-31 Plug Back Performed
1993-07-31 Well Fluid changed to Crude Oil
1993-07-31 Well Mode changed to Suspended
1994-10-24 Well Abandoned
1994-10-24 Well Fluid changed to Crude Oil
1994-10-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-11 Perforation 2169.30 2173.30 14
1992-07-11 Perforation 2175.30 2177.80 14
1992-07-12 Acid Treatment 2169.30 2177.80 0
1993-03-17 Perforation 2162.70 2164.00 13
1993-03-19 Acid Treatment 2162.70 2164.00 0
1993-03-20 Acid Treatment 2162.70 2164.00 0
1993-07-28 Perforation 2147.50 2153.00 13
1993-07-29 Acid Treatment 2147.50 2153.00 0
1993-07-31 Packing Device Capped w/Cement 2132.00 2140.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3376 0.0 0.0 0.0
1993 3634 0.0 0.0 0.0

For data sources see[5]

References