If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0806041308002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/08-13-080-04W6/2 | |
| Location Alias: 00/08-13-80-04 W6M | |
| Location Alias 2: 00/08-13-080-04 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 080 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 13 | |
| County/Municipality: Municipal District of Fairview No. 136 | |
| Well Name: CNRL DUNVEG 8-13-80-4 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0141525 | |
| License Date: 1989-10-27 | |
| License Status: Issued | |
| Spud Date: 1989-10-30 | |
| Final Drill Date: 1989-11-16 | |
| Well Total Depth: 2200.00 m | |
| Surface Hole Latitude: 55.932766 | |
| Surface Hole Longitude: -118.473755 |
| Date | Event |
|---|---|
| 1989-10-27 | Obtained License |
| 1989-10-30 | Lost Circulation Occurred |
| 1989-11-01 | Surface Casing Operation Performed |
| 1989-11-03 | Lost Circulation Occurred |
| 1989-11-05 | Kick Occurred |
| 1989-11-16 | Finished Drilling |
| 1989-11-16 | Well Mode changed to Drilled and Cased |
| 1989-11-17 | Lost Circulation Occurred |
| 1989-11-17 | Well Log Performed |
| 1989-11-18 | Drill Stem Test Performed |
| 1989-11-19 | Drill Stem Test Performed |
| 1989-11-20 | Drill Stem Test Performed |
| 1989-11-21 | Drill Stem Test Performed |
| 1989-11-22 | Drill Stem Test Performed |
| 1989-11-23 | Drill Stem Test Performed |
| 1989-11-24 | Drill Stem Test Performed |
| 1989-11-25 | Plug Back Performed |
| 1989-11-26 | Production Casing Operation Performed |
| 1989-11-26 | Rig Released |
| 1989-12-06 | Well Log Performed |
| 1990-01-23 | Well Log Performed |
| 1990-12-02 | Perforation Treatment Performed - Jet Perforation |
| 1990-12-02 | Well Log Performed |
| 1990-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-08-06 | Plug Back Performed |
| 1993-08-07 | Perforation Treatment Performed - Jet Perforation |
| 1993-08-07 | Well Log Performed |
| 1993-08-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-08-10 | Well Began Production |
| 1993-08-10 | Well Fluid changed to Gas |
| 1993-08-10 | Well Mode changed to Flowing |
| 2002-10-31 | Well Fluid changed to Gas |
| 2002-10-31 | Well Mode changed to Suspended |
| 2008-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-06-07 | Plug Back Performed |
| 2008-06-07 | Well Fluid changed to Gas |
| 2008-06-07 | Well Log Performed |
| 2008-06-07 | Well Mode changed to Abandoned Zone |
| 2008-06-10 | Perforation Treatment Performed - Jet Perforation |
| 2008-06-10 | Well Log Performed |
| 2008-06-14 | Perforation Treatment Performed - Fractured |
| 2008-06-21 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-12-02 | Perforation | 1608.00 | 1610.00 | 13 |
| 1990-12-03 | Acid Treatment | 1608.00 | 1610.00 | 0 |
| 1993-08-06 | Packing Device Capped w/Cement | 1599.00 | 1602.00 | 0 |
| 1993-08-07 | Perforation | 1582.00 | 1586.50 | 13 |
| 1993-08-08 | Acid Treatment | 1582.00 | 1586.50 | 0 |
| 2008-06-07 | Packing Device Capped w/Cement | 1566.00 | 1574.00 | 0 |
| 2008-06-10 | Perforation | 1432.00 | 1470.00 | 2 |
| 2008-06-14 | Fracture | 1432.00 | 1470.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 3063 | 0.0 | 0.0 | 0.0 |
| 1994 | 7271 | 0.0 | 0.0 | 0.0 |
| 1995 | 5765 | 0.0 | 0.0 | 0.0 |
| 1996 | 2745 | 0.0 | 0.0 | 0.0 |
| 1997 | 648 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1989-10-30 | Lost Circulation | 140.00 | 185.00 |
| 1989-11-03 | Lost Circulation | 458.00 | 1335.00 |
| 1989-11-05 | Kick | 1289.00 | 1289.00 |
| 1989-11-17 | Lost Circulation | 2200.00 | 2200.00 |
For data sources see[6]