X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806032206022

Well Details

Well ID: 0806032206022
Loading map...
Location: 02/06-22-080-03W6/2
Location Alias: 02/06-22-80-03 W6M
Location Alias 2: 02/06-22-080-03 W6/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 03
Section: 22
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL 0-0-0-0
Operator Name: Canadian Natural Resources Limited
License Number: 0115913
License Date: 1985-07-05
License Status: Amended
Spud Date: 1985-07-09
Final Drill Date: 1985-07-28
Well Total Depth: 2340.00 m
Surface Hole Latitude: 55.946821
Surface Hole Longitude: -118.383451

For data sources see[1][2]

Well History

Date Event
1985-07-05 Obtained License
1985-07-11 Surface Casing Operation Performed
1985-07-28 Finished Drilling
1985-07-29 Well Log Performed
1985-07-30 Drill Stem Test Performed
1985-07-31 Drill Stem Test Performed
1985-08-01 Drill Stem Test Performed
1985-08-02 Drill Stem Test Performed
1985-08-04 Drill Stem Test Performed
1985-08-05 Drill Stem Test Performed
1985-08-06 Drill Stem Test Performed
1985-08-07 Drill Stem Test Performed
1985-08-07 Plug Back Performed
1985-08-07 Well Log Performed
1985-08-08 Drill Stem Test Performed
1985-08-09 Production Casing Operation Performed
1985-08-09 Rig Released
1986-02-08 Well Log Performed
1986-02-10 Perforation Treatment Performed - Jet Perforation
1986-02-12 Perforation Treatment Performed - Fractured
1986-02-17 Perforation Treatment Performed - Jet Perforation
1986-02-27 Perforation Treatment Performed - Fractured
1986-02-27 Well Log Performed
1986-03-14 Well Mode changed to Drilled and Cased
1986-07-01 Well Began Production
1986-07-01 Well Fluid changed to Gas
1986-07-01 Well Mode changed to Flowing
1993-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-08 Plug Back Performed
1993-02-08 Well Fluid changed to Gas
1993-02-08 Well Mode changed to Flowing
1993-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-09 Perforation Treatment Performed - Jet Perforation
1993-02-11 Perforation Treatment Performed - Fractured
1993-02-14 Perforation Treatment Performed - Jet Perforation
1993-02-15 Perforation Treatment Performed - Fractured
1996-05-15 Well Log Performed
1996-05-16 Perforation Treatment Performed - Jet Perforation
1996-05-16 Well Fluid changed to Gas
1996-05-16 Well Mode changed to Flowing
1996-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-18 Perforation Treatment Performed - Jet Perforation
1996-05-18 Well Log Performed
2001-11-19 Well Log Performed
2001-11-20 Well Log Performed
2001-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-22 Perforation Treatment Performed - Cement Squeeze
2001-11-22 Plug Back Performed
2001-11-25 Perforation Treatment Performed - Jet Perforation
2001-11-25 Well Log Performed
2001-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-02 Well Log Performed
2001-12-04 Well Log Performed
2001-12-06 Perforation Treatment Performed - Fractured
2001-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-09 Perforation Treatment Performed - Fractured
2001-12-12 Well Log Performed
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-10 Perforation 1614.00 1619.00 9
1993-02-11 Fracture 1494.00 1497.00 0
1993-02-14 Perforation 1463.30 1466.00 13
1993-02-15 Fracture 1463.30 1466.00 0
1996-05-16 Perforation 1055.50 1057.50 14
1996-05-17 Acid Treatment 1055.50 1057.50 0
1996-05-18 Perforation 1057.00 1059.50 14
1996-05-18 Acid Treatment 1055.50 1059.50 0
2001-11-22 Acid Treatment 1055.00 1059.50 0
2001-11-22 Cement Squeeze 1055.00 1059.50 0
2001-11-25 Perforation 1431.30 1435.00 17
1986-02-12 Fracture 1614.00 1619.00 0
2001-11-25 Perforation 1437.00 1438.50 17
2001-11-25 Perforation 1447.50 1449.00 17
2001-11-25 Perforation 1458.50 1461.50 17
2001-11-25 Perforation 1477.00 1478.00 17
2001-11-28 Acid Treatment 1477.00 1478.00 0
2001-12-06 Fracture 1458.50 1461.50 0
2001-12-07 Acid Treatment 1447.50 1449.00 0
2001-12-09 Fracture 1431.30 1438.50 0
1986-02-17 Perforation 1531.00 1533.00 9
1986-02-17 Perforation 1534.00 1540.00 9
1986-02-27 Fracture 1531.00 1540.00 0
1993-02-08 Packing Device Capped w/Cement 1602.00 1610.00 0
1993-02-08 Packing Device Capped w/Cement 1517.00 1525.00 0
1993-02-09 Perforation 1494.00 1497.00 13
1993-02-09 Acid Treatment 1494.00 1497.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2184 0.0 0.0 0.0
1987 5559 0.0 0.0 0.0
1988 7634 0.0 0.0 0.0
1989 7330 0.0 0.0 0.0
1990 5194 0.0 0.0 0.0
1991 5473 0.0 0.0 0.0
1992 7547 0.0 0.0 0.0
1993 7613 0.0 0.0 0.0
1994 8539 0.0 0.0 0.0
1995 8259 0.0 0.0 0.0
1996 8214 0.0 0.0 0.0
1997 5346 0.0 0.0 0.0
1998 8119 0.0 0.0 0.0
1999 8061 0.0 0.0 0.0
2000 8631 0.0 0.0 0.0
2001 7289 0.0 0.0 0.0
2002 7169 0.0 0.0 0.0
2003 8525 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8591 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8649 0.0 0.0 0.0
2008 8632 0.0 0.0 0.0
2009 8592 0.0 0.0 0.0
2010 8572 0.0 0.0 0.0
2011 8438 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 7299 0.0 0.0 0.0
2014 8686 0.0 0.0 0.0
2015 8674 0.0 0.0 0.0
2016 8516 0.0 0.0 0.0
2017 8684 0.0 0.0 0.0
2018 8267 0.0 0.0 0.0
2019 8482 0.0 0.0 0.0
2020 2118 0.0 0.0 0.0

For data sources see[5]

References