X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805233107000

Well Details

Well ID: 0805233107000
Loading map...
Location: 00/07-31-080-23W5/0
Location Alias: 00/07-31-80-23 W5M
Location Alias 2: 00/07-31-080-23 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 31
County/Municipality: Birch Hills County
Well Name: INTERACTION PCP TANGENT 7-31-80-23
Operator Name: Obsidian Energy Ltd.
License Number: 0148960
License Date: 1991-05-24
License Status: Suspension
Spud Date: 1991-06-08
Final Drill Date: 1991-06-17
Well Total Depth: 1830.00 m
Surface Hole Latitude: 55.977095
Surface Hole Longitude: -117.587168

For data sources see[1][2]

Well History

Date Event
1991-05-24 Obtained License
1991-06-09 Surface Casing Operation Performed
1991-06-17 Finished Drilling
1991-06-17 Well Mode changed to Drilled and Cased
1991-06-18 Well Log Performed
1991-06-19 Production Casing Operation Performed
1991-06-20 Rig Released
1991-07-04 Well Log Performed
1991-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-06 Perforation Treatment Performed - Jet Perforation
1991-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-09 Well Began Production
1991-07-09 Well Fluid changed to Crude Oil
1991-07-09 Well Mode changed to Flowing
1992-02-18 Well Log Performed
1992-02-19 Perforation Treatment Performed - Jet Perforation
1992-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-13 Well Log Performed
1992-05-15 Perforation Treatment Performed - Cement Squeeze
1992-05-19 Well Log Performed
1992-05-20 Perforation Treatment Performed - Jet Perforation
1992-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-27 Well Fluid changed to Crude Oil
1992-07-27 Well Mode changed to Pumping
1999-01-28 Well Fluid changed to Crude Oil
1999-01-28 Well Mode changed to Suspended
1999-01-29 Perforation Treatment Performed - Jet Perforation
1999-02-08 Well Fluid changed to Crude Oil
1999-02-08 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-07-06 Perforation 1739.00 1741.00 13
1999-01-29 Perforation 588.50 591.00 17
1999-01-29 Perforation 604.50 606.00 17
1991-07-06 Acid Treatment 1739.00 1741.00 0
1991-07-07 Acid Treatment 1739.00 1741.00 0
1992-02-19 Perforation 1729.50 1730.50 13
1992-02-19 Perforation 1732.00 1735.50 13
1992-02-20 Acid Treatment 1729.50 1735.50 0
1992-05-15 Cement Squeeze 1729.50 1741.00 0
1992-05-20 Perforation 1729.50 1733.50 14
1992-05-21 Acid Treatment 1729.50 1733.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 3733 0.0 0.0 0.0
1992 5982 0.0 0.0 0.0
1993 8384 0.0 0.0 0.0
1994 8726 0.0 0.0 0.0
1995 8403 0.0 0.0 0.0
1996 7421 0.0 0.0 0.0
1997 8301 0.0 0.0 0.0
1998 8599 0.0 0.0 0.0
1999 608 0.0 0.0 0.0

For data sources see[5]

References