X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805230105000

Well Details

Well ID: 0805230105000
Loading map...
Location: 00/05-01-080-23W5/0
Location Alias: 00/05-01-80-23 W5M
Location Alias 2: 00/05-01-080-23 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 01
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL ET AL TANGENT 5-1-80-23
Operator Name: Canadian Natural Resources Limited
License Number: 0141586
License Date: 1989-10-31
License Status: Suspension
Spud Date: 1989-10-31
Final Drill Date: 1989-11-12
Well Total Depth: 1850.00 m
Surface Hole Latitude: 55.904744
Surface Hole Longitude: -117.471370

For data sources see[1][2]

Well History

Date Event
1989-10-31 Obtained License
1989-10-31 Well Log Performed
1989-11-01 Lost Circulation Occurred
1989-11-03 Surface Casing Operation Performed
1989-11-06 Lost Circulation Occurred
1989-11-12 Finished Drilling
1989-11-13 Well Log Performed
1989-11-14 Lost Circulation Occurred
1989-11-15 Drill Stem Test Performed
1989-11-16 Drill Stem Test Performed
1989-11-18 Production Casing Operation Performed
1989-11-19 Rig Released
1989-11-19 Well Mode changed to Drilled and Cased
1989-11-26 Well Log Performed
1989-11-27 Perforation Treatment Performed - Jet Perforation
1989-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-01 Well Began Production
1989-12-01 Well Fluid changed to Crude Oil
1989-12-01 Well Mode changed to Flowing
1990-09-20 Well Log Performed
1991-01-15 Well Fluid changed to Crude Oil
1991-01-15 Well Mode changed to Suspended
1992-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-16 Plug Back Performed
1992-08-16 Well Fluid changed to Crude Oil
1992-08-16 Well Log Performed
1992-08-16 Well Mode changed to Abandoned Zone
1996-08-18 Well Log Performed
1996-08-19 Perforation Treatment Performed - Jet Perforation
1996-08-19 Well Log Performed
1996-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-22 Plug Back Performed
1996-08-22 Well Log Performed
1996-08-23 Perforation Treatment Performed - Jet Perforation
1996-08-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-27 Perforation 1724.00 1728.00 13
1989-11-28 Acid Treatment 1724.00 1728.00 0
1992-08-16 Packing Device Capped w/Cement 1707.00 1715.00 0
1996-08-19 Perforation 1465.00 1469.00 18
1996-08-20 Acid Treatment 1465.00 1469.00 0
1996-08-22 Packing Device Capped w/Cement 1452.00 1460.00 0
1996-08-23 Perforation 735.00 740.00 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 638 0.0 0.0 0.0
1990 6393 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-11-01 Lost Circulation 95.00 364.00
1989-11-06 Lost Circulation 1040.00 1610.00
1989-11-14 Lost Circulation 1850.00 1850.00

For data sources see[6]

References