X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0804252610000

Well Details

Well ID: 0804252610000
Loading map...
Location: 00/10-26-080-25W4/0
Location Alias: 00/10-26-80-25 W4M
Location Alias 2: 00/10-26-080-25 W4/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 4
Range: 25
Section: 26
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PEOC DESMAR 10-26-80-25
Operator Name: Sequoia Resources Corp.
License Number: 0191976
License Date: 1996-10-02
License Status: Suspension
Spud Date: 1996-10-07
Final Drill Date: 1996-10-09
Well Total Depth: 462.00 m
Surface Hole Latitude: 55.962858
Surface Hole Longitude: -113.799088

For data sources see[1][2]

Well History

Date Event
1996-10-02 Obtained License
1996-10-07 Well Log Performed
1996-10-08 Surface Casing Operation Performed
1996-10-09 Finished Drilling
1996-10-09 Well Log Performed
1996-10-09 Well Mode changed to Drilled and Cased
1996-10-10 Production Casing Operation Performed
1996-10-10 Rig Released
1996-10-16 Perforation Treatment Performed - Open-Hole Completion
1996-10-16 Well Log Performed
1996-10-17 Perforation Treatment Performed - Cement Plug
1996-10-17 Perforation Treatment Performed - Open-Hole Completion
1996-10-17 Plug Back Performed
1996-10-19 Perforation Treatment Performed - Jet Perforation
1997-12-07 Well Log Performed
1997-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-08 Perforation Treatment Performed - Jet Perforation
1997-12-08 Plug Back Performed
1997-12-08 Well Log Performed
1997-12-08 Well Mode changed to Abandoned Zone
1997-12-10 Perforation Treatment Performed - Casing Patch (Over Perfs)
2004-01-09 Perforation Treatment Performed - Jet Perforation
2008-01-15 Perforation Treatment Performed - Jet Perforation
2008-01-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-16 Open Hole/Barefoot Completion 431.00 462.00 0
1997-12-10 Casing Patch 283.00 285.00 0
2004-01-09 Perforation 395.80 396.30 17
2008-01-15 Perforation 408.10 409.00 17
1996-10-17 Cement Plug 440.00 462.00 0
1996-10-17 Open Hole/Barefoot Completion 431.00 440.00 0
1996-10-19 Perforation 395.50 396.50 13
1997-12-08 Packing Device Capped w/Cement 417.00 425.00 0
1997-12-08 Perforation 370.00 372.00 14
1997-12-08 Perforation 312.00 314.00 14
1997-12-08 Perforation 343.00 346.00 14
1997-12-08 Perforation 283.00 285.00 14

For data sources see[4]



References