X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0804101508000

Well Details

Well ID: 0804101508000
Loading map...
Location: 00/08-15-080-10W4/0
Location Alias: 00/08-15-80-10 W4M
Location Alias 2: 00/08-15-080-10 W4/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 4
Range: 10
Section: 15
County/Municipality: Lac La Biche County
Well Name: PARA ET AL CORNER 8-15-80-10
Operator Name: Sequoia Resources Corp.
License Number: 0174968
License Date: 1995-01-18
License Status: Suspension
Spud Date: 1995-02-20
Final Drill Date: 1995-02-23
Well Total Depth: 502.00 m
Surface Hole Latitude: 55.932117
Surface Hole Longitude: -111.471370

For data sources see[1][2]

Well History

Date Event
1995-01-18 Obtained License
1995-02-21 Surface Casing Operation Performed
1995-02-23 Finished Drilling
1995-02-23 Well Mode changed to Drilled and Cased
1995-02-24 Production Casing Operation Performed
1995-02-24 Rig Released
1995-02-24 Well Log Performed
1995-02-26 Well Log Performed
1995-03-06 Perforation Treatment Performed - Jet Perforation
1995-03-07 Perforation Treatment Performed - Jet Perforation
1995-03-07 Perforation Treatment Performed - Remedial Casing
1995-03-07 Well Log Performed
1995-03-08 Well Log Performed
1997-01-17 Well Log Performed
1997-01-18 Perforation Treatment Performed - Jet Perforation
1997-03-19 Well Began Production
1997-03-19 Well Fluid changed to Gas
1997-03-19 Well Mode changed to Flowing
2001-01-23 Perforation Treatment Performed - Chemical Squeeze
2003-09-02 Well Fluid changed to Gas
2003-09-02 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-06 Perforation 434.50 435.00 8
1995-03-07 Remedial Casing Cementing 434.50 435.00 0
1995-03-07 Perforation 415.50 416.00 8
1995-03-07 Remedial Casing Cementing 415.50 416.00 0
1995-03-07 Perforation 170.00 170.30 8
1995-03-07 Remedial Casing Cementing 170.00 170.30 0
1997-01-18 Perforation 422.00 424.20 13
2001-01-23 Chemical Squeeze 416.00 435.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6820 0.0 0.0 0.0
1998 8624 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 7894 0.0 0.0 0.0
2001 8664 0.0 0.0 0.0
2002 8720 0.0 0.0 0.0
2003 5808 0.0 0.0 0.0

For data sources see[5]

References