X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796133412000

Well Details

Well ID: 0796133412000
Loading map...
Location: 00/12-34-079-13W6/0
Location Alias: 00/12-34-79-13 W6M
Location Alias 2: 00/12-34-079-13 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 13
Section: 34
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPE 12-34-79-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0435682
License Date: 2011-08-03
License Status: Issued
Spud Date: 2011-08-30
Final Drill Date: 2011-09-11
Well Total Depth: 3465.00 m
Surface Hole Latitude: 55.882803
Surface Hole Longitude: -119.933137

For data sources see[1][2]

Well History

Date Event
2011-08-03 Obtained License
2011-08-31 Surface Casing Operation Performed
2011-09-03 Direction Drilling Operation Performed - Horizontal
2011-09-11 Finished Drilling
2011-09-11 Well Log Performed
2011-09-11 Well Mode changed to Drilled and Cased
2011-09-13 Liner Casing Operation Performed
2011-09-13 Production Casing Operation Performed
2011-09-14 Rig Released
2011-09-23 Well Log Performed
2011-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-27 Perforation Treatment Performed - Open-Hole Completion
2011-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Testing
2011-10-22 Well Began Production
2011-10-22 Well Fluid changed to Gas
2011-10-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-03 1746.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-27 Open Hole/Barefoot Completion 3461.00 3465.00 0
2011-09-29 Multi-Stage Fracture 2449.60 2450.40 0
2011-09-29 Multi-Stage Fracture 2317.40 2318.20 0
2011-09-29 Multi-Stage Fracture 2231.40 2232.20 0
2011-09-27 Multi-Stage Fracture 3450.10 3450.90 0
2011-09-27 Multi-Stage Fracture 3323.00 3323.80 0
2011-09-27 Multi-Stage Fracture 3202.40 3203.20 0
2011-09-28 Multi-Stage Fracture 3067.60 3068.40 0
2011-09-28 Multi-Stage Fracture 2950.20 2951.00 0
2011-09-28 Multi-Stage Fracture 2832.00 2832.80 0
2011-09-28 Multi-Stage Fracture 2697.50 2698.30 0
2011-09-29 Multi-Stage Fracture 2580.50 2581.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1643 0.0 0.0 0.0
2012 8522 0.0 0.0 0.0
2013 8645 0.0 0.0 0.0
2014 8303 0.0 0.0 0.0
2015 8393 0.0 0.0 0.0
2016 7988 0.0 0.0 0.0
2017 8190 0.0 0.0 0.0
2018 8292 0.0 0.0 0.0
2019 8473 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[6]

References