X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796133409000

Well Details

Well ID: 0796133409000
Loading map...
Location: 00/09-34-079-13W6/0
Location Alias: 00/09-34-79-13 W6M
Location Alias 2: 00/09-34-079-13 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 13
Section: 34
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF PCOUPE 9-34-79-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0193715
License Date: 1996-11-19
License Status: Suspension
Spud Date: 1996-12-25
Final Drill Date: 1997-01-04
Well Total Depth: 1875.00 m
Surface Hole Latitude: 55.894161
Surface Hole Longitude: -119.936972

For data sources see[1][2]

Well History

Date Event
1996-11-19 Obtained License
1996-12-26 Surface Casing Operation Performed
1997-01-04 Finished Drilling
1997-01-04 Well Log Performed
1997-01-04 Well Mode changed to Drilled and Cased
1997-01-06 Production Casing Operation Performed
1997-01-06 Rig Released
1997-01-11 Perforation Treatment Performed - Jet Perforation
1997-01-13 Perforation Treatment Performed - Fractured
1997-03-11 Perforation Treatment Performed - Jet Perforation
1997-03-16 Perforation Treatment Performed - Fractured
1997-12-03 Perforation Treatment Performed - Jet Perforation
1997-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-03 Perforation Treatment Performed - Cement Squeeze
1998-10-22 Well Began Production
1998-10-22 Well Fluid changed to Gas
1998-10-22 Well Mode changed to Flowing
2010-05-27 Well Fluid changed to Gas
2010-05-27 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-11 Perforation 1815.50 1817.50 20
1997-01-11 Perforation 1809.00 1813.00 20
1997-01-11 Perforation 1804.00 1806.00 20
1997-01-13 Fracture 1804.00 1817.50 0
1997-03-11 Perforation 1788.50 1790.50 37
1997-03-16 Fracture 1788.50 1790.50 0
1997-12-03 Perforation 691.00 695.00 18
1997-12-06 Acid Treatment 691.00 695.00 0
1998-03-03 Cement Squeeze 691.00 695.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1233 0.0 0.0 0.0
1999 5840 0.0 0.0 0.0
2000 7344 0.0 0.0 0.0
2001 4917 0.0 0.0 0.0
2002 5705 0.0 0.0 0.0
2003 5142 0.0 0.0 0.0
2004 6702 0.0 0.0 0.0
2005 7970 0.0 0.0 0.0
2006 7701 0.0 0.0 0.0
2007 8670 0.0 0.0 0.0
2008 8614 0.0 0.0 0.0
2009 8015 0.0 0.0 0.0

For data sources see[5]

References