If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796132112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.855649,"lon":-119.956291,"icon":""}]} |
Location: 00/12-21-079-13W6/0 | |
Location Alias: 00/12-21-79-13 W6M | |
Location Alias 2: 00/12-21-079-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 13 | |
Section: 21 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF 4-22 PCOUPE 12-21-79-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0384577 | |
License Date: 2007-11-09 | |
License Status: Amended | |
Spud Date: 2008-01-04 | |
Final Drill Date: 2008-01-28 | |
Well Total Depth: 3746.00 m | |
Surface Hole Latitude: 55.855649 | |
Surface Hole Longitude: -119.956291 |
Date | Event |
---|---|
2007-11-09 | Obtained License |
2008-01-06 | Surface Casing Operation Performed |
2008-01-10 | Direction Drilling Operation Performed - Horizontal |
2008-01-28 | Finished Drilling |
2008-01-28 | Well Log Performed |
2008-01-28 | Well Mode changed to Drilled and Cased |
2008-01-29 | Well Log Performed |
2008-01-31 | Production Casing Operation Performed |
2008-02-01 | Rig Released |
2008-02-11 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-02-11 | Perforation Treatment Performed - Fractured |
2008-02-12 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-02-12 | Perforation Treatment Performed - Fractured |
2008-02-13 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-02-13 | Perforation Treatment Performed - Fractured |
2008-02-14 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-02-14 | Perforation Treatment Performed - Fractured |
2008-02-26 | Well Began Production |
2008-02-26 | Well Fluid changed to Gas |
2008-02-26 | Well Mode changed to Flowing |
2014-04-01 | Well Fluid changed to Gas |
2014-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-01-10 | 1542.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-02-11 | Hydra Jet Perforation | 3386.00 | 3387.00 | 6 |
2008-02-13 | Fracture | 2854.00 | 2855.00 | 0 |
2008-02-13 | Hydra Jet Perforation | 2725.00 | 2726.00 | 6 |
2008-02-13 | Fracture | 2725.00 | 2726.00 | 0 |
2008-02-14 | Hydra Jet Perforation | 2547.00 | 2548.00 | 6 |
2008-02-14 | Fracture | 2547.00 | 2548.00 | 0 |
2008-02-14 | Hydra Jet Perforation | 2469.00 | 2470.00 | 6 |
2008-02-14 | Fracture | 2469.00 | 2470.00 | 0 |
2008-02-14 | Hydra Jet Perforation | 2334.00 | 2335.00 | 6 |
2008-02-14 | Fracture | 2334.00 | 2335.00 | 0 |
2008-02-14 | Hydra Jet Perforation | 2207.00 | 2208.00 | 6 |
2008-02-11 | Fracture | 3386.00 | 3387.00 | 0 |
2008-02-14 | Fracture | 2207.00 | 2208.00 | 0 |
2008-02-11 | Hydra Jet Perforation | 3254.00 | 3255.00 | 6 |
2008-02-11 | Fracture | 3254.00 | 3255.00 | 0 |
2008-02-12 | Hydra Jet Perforation | 3122.00 | 3123.00 | 6 |
2008-02-12 | Fracture | 3122.00 | 3123.00 | 0 |
2008-02-13 | Hydra Jet Perforation | 2984.00 | 2985.00 | 6 |
2008-02-13 | Fracture | 2984.00 | 2985.00 | 0 |
2008-02-13 | Hydra Jet Perforation | 2854.00 | 2855.00 | 6 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 6945 | 0.0 | 0.0 | 0.0 |
2009 | 8299 | 0.0 | 0.0 | 0.0 |
2010 | 8362 | 0.0 | 0.0 | 0.0 |
2011 | 7066 | 0.0 | 0.0 | 0.0 |
2012 | 7850 | 0.0 | 0.0 | 0.0 |
2013 | 6939 | 0.0 | 0.0 | 0.0 |
2014 | 8180 | 0.0 | 0.0 | 0.0 |
2015 | 6165 | 0.0 | 0.0 | 0.0 |
2016 | 5876 | 0.0 | 0.0 | 0.0 |
2017 | 6373 | 0.0 | 0.0 | 0.0 |
2018 | 7236 | 0.0 | 0.0 | 0.0 |
2019 | 8167 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]