X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796130408000

Well Details

Well ID: 0796130408000
Loading map...
Location: 00/08-04-079-13W6/0
Location Alias: 00/08-04-79-13 W6M
Location Alias 2: 00/08-04-079-13 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 13
Section: 04
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF 16-5 PCOUPE 8-4-79-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0399099
License Date: 2008-07-30
License Status: Amended
Spud Date: 2008-08-06
Final Drill Date: 2008-09-12
Well Total Depth: 3856.00 m
Surface Hole Latitude: 55.823832
Surface Hole Longitude: -119.987245

For data sources see[1][2]

Well History

Date Event
2008-07-30 Obtained License
2008-08-07 Surface Casing Operation Performed
2008-08-13 Direction Drilling Operation Performed - Horizontal
2008-08-21 Well Log Performed
2008-08-22 Intermediate Casing Operation Performed
2008-08-22 Well Log Performed
2008-09-04 Well Log Performed
2008-09-12 Finished Drilling
2008-09-12 Well Log Performed
2008-09-12 Well Mode changed to Drilled and Cased
2008-09-15 Liner Casing Operation Performed
2008-09-16 Rig Released
2008-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2008-09-25 Perforation Treatment Performed - Open-Hole Completion
2008-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2008-10-01 Well Log Performed
2008-12-29 Well Began Production
2008-12-29 Well Fluid changed to Gas
2008-12-29 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-08-13 1777.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-25 Open Hole/Barefoot Completion 3833.80 3856.00 0
2008-09-26 Multi-Stage Fracture 2611.40 2612.20 0
2008-09-26 Multi-Stage Fracture 2454.90 2455.70 0
2008-09-26 Multi-Stage Fracture 2309.90 2310.70 0
2008-09-25 Multi-Stage Fracture 3820.00 3820.80 0
2008-09-25 Multi-Stage Fracture 3649.00 3649.80 0
2008-09-25 Multi-Stage Fracture 3497.80 3498.60 0
2008-09-25 Multi-Stage Fracture 3345.10 3345.90 0
2008-09-25 Multi-Stage Fracture 3182.00 3182.80 0
2008-09-26 Multi-Stage Fracture 3057.40 3058.20 0
2008-09-26 Multi-Stage Fracture 2905.90 2906.70 0
2008-09-26 Multi-Stage Fracture 2755.80 2756.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 40 0.0 0.0 0.0
2009 8154 0.0 0.0 0.0
2010 6244 0.0 0.0 0.0
2011 6012 0.0 0.0 0.0
2012 7549 0.0 0.0 0.0
2013 8149 0.0 0.0 0.0
2014 8204 0.0 0.0 0.0
2015 5296 0.0 0.0 0.0
2016 7263 0.0 0.0 0.0
2017 7672 0.0 0.0 0.0
2018 4057 0.0 0.0 0.0
2019 8417 0.0 0.0 0.0
2020 2109 0.0 0.0 0.0

For data sources see[6]

References