If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796130302020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.819198,"lon":-119.963223,"icon":""}]} |
Location: 02/02-03-079-13W6/0 | |
Location Alias: 02/02-03-79-13 W6M | |
Location Alias 2: 02/02-03-079-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 13 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 9-4 HZ 102 PCOUPE 2-3-79-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487079 | |
License Date: 2017-12-12 | |
License Status: Issued | |
Spud Date: 2018-01-31 | |
Final Drill Date: 2018-02-10 | |
Well Total Depth: 4160.00 m | |
Surface Hole Latitude: 55.819198 | |
Surface Hole Longitude: -119.963223 |
Date | Event |
---|---|
2017-12-12 | Obtained License |
2018-02-02 | Surface Casing Operation Performed |
2018-02-03 | Direction Drilling Operation Performed - Deviate |
2018-02-07 | Direction Drilling Operation Performed - Horizontal |
2018-02-08 | Well Log Performed |
2018-02-10 | Finished Drilling |
2018-02-10 | Well Log Performed |
2018-02-10 | Well Mode changed to Drilled and Cased |
2018-02-11 | Well Log Performed |
2018-02-12 | Well Log Performed |
2018-02-13 | Production Casing Operation Performed |
2018-02-15 | Rig Released |
2018-04-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-15 | Perforation Treatment Performed - Open-Hole Completion |
2018-04-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-01 | Well Fluid changed to Gas |
2018-05-01 | Well Mode changed to Testing |
2018-05-03 | Well Began Production |
2018-05-03 | Well Fluid changed to Gas |
2018-05-03 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-31 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-03 | 674.70 | Deviate (5 - 79 degrees) |
2018-02-07 | 2233.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-04-15 | Open Hole/Barefoot Completion | 4154.50 | 4160.00 | 0 |
2018-04-15 | Multi-Stage Fracture | 3743.50 | 3744.40 | 0 |
2018-04-15 | Multi-Stage Fracture | 3696.00 | 3696.90 | 0 |
2018-04-16 | Multi-Stage Fracture | 3648.60 | 3649.50 | 0 |
2018-04-16 | Multi-Stage Fracture | 3589.70 | 3590.60 | 0 |
2018-04-16 | Multi-Stage Fracture | 3542.20 | 3543.10 | 0 |
2018-04-16 | Multi-Stage Fracture | 3494.30 | 3495.20 | 0 |
2018-04-16 | Multi-Stage Fracture | 3435.10 | 3436.00 | 0 |
2018-04-16 | Multi-Stage Fracture | 3387.50 | 3388.40 | 0 |
2018-04-16 | Multi-Stage Fracture | 3340.20 | 3341.10 | 0 |
2018-04-16 | Multi-Stage Fracture | 3281.20 | 3282.10 | 0 |
2018-04-15 | Multi-Stage Fracture | 4142.50 | 4144.40 | 0 |
2018-04-16 | Multi-Stage Fracture | 3233.40 | 3234.30 | 0 |
2018-04-17 | Multi-Stage Fracture | 3185.40 | 3186.30 | 0 |
2018-04-17 | Multi-Stage Fracture | 3137.30 | 3138.20 | 0 |
2018-04-17 | Multi-Stage Fracture | 3078.50 | 3079.40 | 0 |
2018-04-17 | Multi-Stage Fracture | 3030.50 | 3031.40 | 0 |
2018-04-17 | Multi-Stage Fracture | 2982.80 | 2983.70 | 0 |
2018-04-17 | Multi-Stage Fracture | 2924.10 | 2925.00 | 0 |
2018-04-17 | Multi-Stage Fracture | 2876.30 | 2877.20 | 0 |
2018-04-17 | Multi-Stage Fracture | 2828.70 | 2829.60 | 0 |
2018-04-17 | Multi-Stage Fracture | 2770.40 | 2771.30 | 0 |
2018-04-15 | Multi-Stage Fracture | 4100.00 | 4101.00 | 0 |
2018-04-17 | Multi-Stage Fracture | 2722.80 | 2723.70 | 0 |
2018-04-17 | Multi-Stage Fracture | 2675.40 | 2676.30 | 0 |
2018-04-17 | Multi-Stage Fracture | 2615.80 | 2616.70 | 0 |
2018-04-17 | Multi-Stage Fracture | 2568.10 | 2569.00 | 0 |
2018-04-17 | Multi-Stage Fracture | 2520.20 | 2521.10 | 0 |
2018-04-17 | Multi-Stage Fracture | 2472.60 | 2473.50 | 0 |
2018-04-17 | Multi-Stage Fracture | 2413.50 | 2414.40 | 0 |
2018-04-18 | Multi-Stage Fracture | 2365.70 | 2366.60 | 0 |
2018-04-18 | Multi-Stage Fracture | 2318.20 | 2319.10 | 0 |
2018-04-18 | Multi-Stage Fracture | 2281.90 | 2282.80 | 0 |
2018-04-15 | Multi-Stage Fracture | 4052.70 | 4053.60 | 0 |
2018-04-15 | Multi-Stage Fracture | 4005.10 | 4006.00 | 0 |
2018-04-15 | Multi-Stage Fracture | 3946.30 | 3947.20 | 0 |
2018-04-15 | Multi-Stage Fracture | 3898.60 | 3899.50 | 0 |
2018-04-15 | Multi-Stage Fracture | 3850.70 | 3851.60 | 0 |
2018-04-15 | Multi-Stage Fracture | 3791.20 | 3792.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-04-15 | 2018-04-18 | 2,096 | 21,741 | N/A |
2 | 2018-04-17 | 2018-04-18 | 2,096 | 0 | N/A |
3 | 2018-04-15 | 2018-04-17 | 2,096 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.7184 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.1869 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.8965 | N/A | ||
DWP-944 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0108 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0108 | N/A | ||||
2 | DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0274 | N/A |
Water | 7732-18-5 | 100 | 0.0274 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2451 | N/A | |
3 | DynaRate 6104 | Calfrac | Friction Reducer | Ammonium Chloride | 12125-02-9 | 100 | 0.1317 | N/A |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.1317 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1317 | N/A | ||||
Oleamide | Trade Secret | 100 | 0.1317 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-04-10 | 2018-04-21 | Recycled Fracturing Water (treated at well site) | 231 |
2018-04-10 | 2018-04-21 | Recycled Fracturing Water (treated at well site) | 121 |
2018-04-08 | 2018-04-24 | Surface Water - Runoff | 2742 |
2018-04-10 | 2018-04-24 | Surface Water - Runoff | 6856 |
2018-04-10 | 2018-04-24 | Surface Water - Runoff | 2742 |
2018-04-08 | 2018-04-24 | Surface Water - Runoff | 9242 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4544 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2142 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-15 | No Incident Encountered | 0.00 | 0.00 |
2018-05-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]