X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796123306000

Well Details

Well ID: 0796123306000
Loading map...
Location: 00/06-33-079-12W6/0
Location Alias: 00/06-33-79-12 W6M
Location Alias 2: 00/06-33-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 33
County/Municipality: Saddle Hills County
Well Name: ARC PCOUPE 6-33-79-12
Operator Name: ARC Resources Ltd.
License Number: 0007606
License Date: 1954-01-11
License Status: Abandoned
Spud Date: 1954-01-24
Final Drill Date: 1954-02-10
Well Total Depth: 797.10 m
Surface Hole Latitude: 55.888613
Surface Hole Longitude: -119.817534

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-01-11 Obtained License
1954-02-04 Drill Stem Test Performed
1954-02-05 Drill Stem Test Performed
1954-02-06 Drill Stem Test Performed
1954-02-10 Finished Drilling
1954-02-11 Production Casing Operation Performed
1954-02-14 Perforation Treatment Performed - Bullet Perforation
1954-02-14 Perforation Treatment Performed - Jet Perforation
1954-02-17 Perforation Treatment Performed - Cement Squeeze
1954-02-20 Perforation Treatment Performed - Jet Perforation
1954-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-02-22 Well Mode changed to Drilled and Cased
1957-10-10 Well Began Production
1957-10-10 Well Fluid changed to Gas
1957-10-10 Well Mode changed to Flowing
1959-04-09 Well Fluid changed to Gas
1959-04-09 Well Mode changed to Suspended
1975-04-01 Well Began Injection
1975-04-01 Well Fluid changed to Water
1975-04-01 Well Type changed to Disposal
1989-12-01 Well Fluid changed to Water
1989-12-01 Well Mode changed to Suspended
1989-12-01 Well Type changed to Disposal
1997-01-12 Well Log Performed
1997-02-27 Well Log Performed
1997-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-28 Plug Back Performed
1997-02-28 Well Fluid changed to Water
1997-02-28 Well Mode changed to Abandoned Zone
1997-02-28 Well Type changed to Disposal
1997-03-01 Perforation Treatment Performed - Jet Perforation
1997-03-01 Perforation Treatment Performed - Remedial Casing
1997-03-01 Well Log Performed
2001-12-08 Perforation Treatment Performed - Jet Perforation
2001-12-08 Well Log Performed
2001-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-10 Perforation Treatment Performed - Cement Plug
2001-12-10 Perforation Treatment Performed - Remedial Casing
2001-12-12 Perforation Treatment Performed - Jet Perforation
2001-12-12 Well Log Performed
2001-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-15 Perforation Treatment Performed - Remedial Casing
2001-12-16 Well Log Performed
2002-01-11 Perforation Treatment Performed - Jet Perforation
2002-01-11 Well Log Performed
2002-01-13 Perforation Treatment Performed - Remedial Casing
2002-01-15 Well Abandoned
2002-01-15 Well Fluid changed to Water
2002-01-15 Well Mode changed to Abandoned
2002-01-15 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-14 Perforation 725.40 731.50 13
2001-12-09 Acid Treatment 520.00 521.00 0
2001-12-10 Remedial Casing Cementing 520.00 521.00 0
2001-12-10 Cement Plug 486.20 521.00 0
2001-12-12 Perforation 399.00 400.00 17
2001-12-14 Acid Treatment 399.00 400.00 0
2001-12-15 Remedial Casing Cementing 399.00 400.00 0
2002-01-11 Perforation 360.00 361.00 17
2002-01-13 Remedial Casing Cementing 360.00 361.00 0
1954-02-14 Bullet Perforation 725.40 731.50 13
1954-02-17 Cement Squeeze 725.40 731.50 0
1954-02-20 Perforation 726.90 730.00 13
1954-02-21 Acid Treatment 726.90 730.00 0
1997-02-28 Packing Device Capped w/Cement 540.00 720.00 0
1997-03-01 Perforation 250.00 250.60 17
1997-03-01 Remedial Casing Cementing 250.00 250.60 0
2001-12-08 Perforation 520.00 521.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References