X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121808020

Well Details

Well ID: 0796121808020
Loading map...
Location: 02/08-18-079-12W6/0
Location Alias: 02/08-18-79-12 W6M
Location Alias 2: 02/08-18-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 18
County/Municipality: Saddle Hills County
Well Name: BIR 14-6 HZ 102 PCOUPE 8-18-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0493329
License Date: 2019-01-09
License Status: Amended
Spud Date: 2019-02-19
Final Drill Date: 2019-03-04
Well Total Depth: 4897.00 m
Surface Hole Latitude: 55.824027
Surface Hole Longitude: -119.868461

For data sources see[1][2]

Well History

Date Event
2019-01-09 Obtained License
2019-02-16 Well Log Performed
2019-02-20 Surface Casing Operation Performed
2019-02-21 Direction Drilling Operation Performed - Deviate
2019-02-25 Direction Drilling Operation Performed - Horizontal
2019-03-04 Finished Drilling
2019-03-04 Well Mode changed to Drilled and Cased
2019-03-05 Well Log Performed
2019-03-06 Well Log Performed
2019-03-08 Production Casing Operation Performed
2019-03-08 Rig Released
2019-05-02 Well Log Performed
2019-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-10 Perforation Treatment Performed - Jet Perforation
2019-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-11 Perforation Treatment Performed - Jet Perforation
2019-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-12 Perforation Treatment Performed - Jet Perforation
2019-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Perforation Treatment Performed - Jet Perforation
2019-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-15 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-16 Perforation Treatment Performed - Jet Perforation
2019-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-26 Well Fluid changed to Gas
2019-05-26 Well Mode changed to Testing
2019-07-10 Well Began Production
2019-07-10 Well Fluid changed to Gas
2019-07-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-19 Beaver Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-21 1052.00 Deviate (5 - 79 degrees)
2019-02-25 2272.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-08 Multi-Stage Fracture 4895.20 4895.30 0
2019-05-10 Perforation 4629.00 4629.30 2
2019-05-15 Perforation 2829.00 2829.30 3
2019-05-15 Perforation 2854.00 2854.30 3
2019-05-15 Multi-Stage Fracture 2804.00 2854.30 0
2019-05-15 Perforation 2704.00 2704.30 3
2019-05-15 Perforation 2729.00 2729.30 3
2019-05-15 Perforation 2754.00 2754.30 3
2019-05-15 Perforation 2779.00 2779.30 3
2019-05-16 Multi-Stage Fracture 2704.00 2779.30 0
2019-05-16 Perforation 2604.00 2604.30 3
2019-05-16 Perforation 2629.00 2629.30 3
2019-05-10 Perforation 4654.00 4654.30 2
2019-05-16 Perforation 2654.00 2654.30 3
2019-05-16 Perforation 2679.00 2679.30 3
2019-05-16 Multi-Stage Fracture 2604.00 2679.30 0
2019-05-16 Perforation 2507.00 2507.30 3
2019-05-16 Perforation 2531.00 2531.30 3
2019-05-16 Perforation 2555.00 2555.30 3
2019-05-16 Perforation 2579.00 2579.30 3
2019-05-16 Multi-Stage Fracture 2507.00 2579.30 0
2019-05-10 Perforation 4679.00 4679.30 2
2019-05-11 Multi-Stage Fracture 4579.00 4679.30 0
2019-05-11 Perforation 4454.00 4454.30 2
2019-05-11 Perforation 4479.00 4479.30 2
2019-05-11 Perforation 4504.00 4504.30 2
2019-05-11 Perforation 4529.00 4529.30 2
2019-05-11 Perforation 4554.00 4554.30 2
2019-05-11 Multi-Stage Fracture 4454.00 4554.30 0
2019-05-10 Perforation 4704.00 4704.30 3
2019-05-11 Perforation 4354.00 4354.30 3
2019-05-11 Perforation 4379.00 4379.30 3
2019-05-11 Perforation 4404.00 4404.30 3
2019-05-11 Perforation 4429.00 4429.30 3
2019-05-11 Multi-Stage Fracture 4354.00 4429.30 0
2019-05-11 Perforation 4229.00 4229.30 2
2019-05-11 Perforation 4254.00 4254.30 2
2019-05-11 Perforation 4279.00 4279.30 2
2019-05-11 Perforation 4304.00 4304.30 2
2019-05-11 Perforation 4329.00 4329.30 2
2019-05-10 Perforation 4729.00 4729.30 3
2019-05-11 Multi-Stage Fracture 4229.00 4329.30 0
2019-05-11 Perforation 4129.00 4129.30 3
2019-05-11 Perforation 4154.00 4154.30 3
2019-05-11 Perforation 4179.00 4179.30 3
2019-05-11 Perforation 4204.00 4204.30 3
2019-05-12 Multi-Stage Fracture 4129.00 4204.30 0
2019-05-12 Perforation 4029.00 4029.30 3
2019-05-12 Perforation 4054.00 4054.30 3
2019-05-12 Perforation 4079.00 4079.30 3
2019-05-12 Perforation 4104.00 4104.30 3
2019-05-10 Perforation 4754.00 4754.30 3
2019-05-12 Multi-Stage Fracture 4029.00 4104.30 0
2019-05-12 Perforation 3954.00 3954.30 4
2019-05-12 Perforation 3979.00 3979.30 4
2019-05-12 Perforation 4004.00 4004.30 4
2019-05-12 Multi-Stage Fracture 3954.00 4004.30 0
2019-05-12 Perforation 3854.00 3854.30 3
2019-05-12 Perforation 3879.00 3879.30 3
2019-05-12 Perforation 3904.00 3904.30 3
2019-05-12 Perforation 3929.00 3929.30 3
2019-05-13 Multi-Stage Fracture 3854.00 3929.30 0
2019-05-10 Perforation 4779.00 4779.30 3
2019-05-13 Perforation 3754.00 3754.30 3
2019-05-13 Perforation 3779.00 3779.30 3
2019-05-13 Perforation 3804.00 3804.30 3
2019-05-13 Perforation 3829.00 3829.30 3
2019-05-13 Multi-Stage Fracture 3754.00 3829.30 0
2019-05-13 Perforation 3654.00 3654.30 3
2019-05-13 Perforation 3679.00 3679.30 3
2019-05-13 Perforation 3704.00 3704.30 3
2019-05-13 Perforation 3729.00 3729.30 3
2019-05-13 Multi-Stage Fracture 3654.00 3729.30 0
2019-05-10 Perforation 4804.00 4804.30 3
2019-05-13 Perforation 3579.00 3579.30 4
2019-05-13 Perforation 3604.00 3604.30 4
2019-05-13 Perforation 3629.00 3629.30 4
2019-05-13 Multi-Stage Fracture 3579.00 3629.30 0
2019-05-14 Perforation 3479.00 3479.30 3
2019-05-14 Perforation 3504.00 3504.30 3
2019-05-14 Perforation 3529.00 3529.30 3
2019-05-14 Perforation 3554.00 3554.30 3
2019-05-14 Multi-Stage Fracture 3479.00 3554.30 0
2019-05-14 Perforation 3379.00 3379.30 3
2019-05-10 Multi-Stage Fracture 4704.00 4804.30 0
2019-05-14 Perforation 3404.00 3404.30 3
2019-05-14 Perforation 3429.00 3429.30 3
2019-05-14 Perforation 3454.00 3454.30 3
2019-05-14 Multi-Stage Fracture 3379.00 3454.30 0
2019-05-14 Perforation 3279.00 3279.30 3
2019-05-14 Perforation 3304.00 3304.30 3
2019-05-14 Perforation 3329.00 3329.30 3
2019-05-14 Perforation 3354.00 3354.30 3
2019-05-14 Multi-Stage Fracture 3279.00 3354.30 0
2019-05-14 Perforation 3179.00 3179.30 3
2019-05-10 Perforation 4579.00 4579.30 2
2019-05-14 Perforation 3204.00 3204.30 3
2019-05-14 Perforation 3229.00 3229.30 3
2019-05-14 Perforation 3254.00 3254.30 3
2019-05-14 Multi-Stage Fracture 3179.00 3254.30 0
2019-05-14 Perforation 3079.00 3079.30 3
2019-05-14 Perforation 3104.00 3104.30 3
2019-05-14 Perforation 3129.00 3129.30 3
2019-05-14 Perforation 3154.00 3154.30 3
2019-05-15 Multi-Stage Fracture 3079.00 3154.30 0
2019-05-15 Perforation 2979.00 2979.30 3
2019-05-10 Perforation 4604.00 4604.30 2
2019-05-15 Perforation 3004.00 3004.30 3
2019-05-15 Perforation 3029.00 3029.30 3
2019-05-15 Perforation 3054.00 3054.30 3
2019-05-15 Multi-Stage Fracture 2979.00 3054.30 0
2019-05-15 Perforation 2879.00 2879.30 3
2019-05-15 Perforation 2904.00 2904.30 3
2019-05-15 Perforation 2929.00 2929.30 3
2019-05-15 Perforation 2954.00 2954.30 3
2019-05-15 Multi-Stage Fracture 2879.00 2954.30 0
2019-05-15 Perforation 2804.00 2804.30 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-08 2019-05-16 2,057 15,718 N/A
2 2019-05-08 2019-05-15 2,057 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.0497 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.518 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.271 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.9164 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0101 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0101 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0101 N/A
Polyethylene glycol 25322-68-3 100 0.0101 N/A
Sodium bromide 7647-15-6 100 0.0101 N/A
DWP-690. Slickwater Breaker Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0169 N/A
Water 7732-18-5 100 0.0169 N/A
CalVisc?. High Viscosity Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1545 N/A
Customer Supplied Surfactant TenEx Technologies Surfactant Proprietary Trade Secret 100 0.0724 N/A
Water 7732-18-5 100 0.0724 N/A
2 DWP-641. Friction Reducer Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0714 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0714 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0714 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4921 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-08 No Incident Encountered 0.00 0.00
2019-05-20 No Incident Encountered 0.00 0.00

For data sources see[9]

References