X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121808000

Well Details

Well ID: 0796121808000
Loading map...
Location: 00/08-18-079-12W6/0
Location Alias: 00/08-18-79-12 W6M
Location Alias 2: 00/08-18-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 18
County/Municipality: Saddle Hills County
Well Name: BIR 14-6 HZ PCOUPE 8-18-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0493328
License Date: 2019-01-09
License Status: Amended
Spud Date: 2019-04-08
Final Drill Date: 2019-04-17
Well Total Depth: 4950.00 m
Surface Hole Latitude: 55.824027
Surface Hole Longitude: -119.867982

For data sources see[1][2]

Well History

Date Event
2019-01-09 Obtained License
2019-04-09 Surface Casing Operation Performed
2019-04-10 Direction Drilling Operation Performed - Deviate
2019-04-14 Direction Drilling Operation Performed - Horizontal
2019-04-17 Finished Drilling
2019-04-17 Well Log Performed
2019-04-17 Well Mode changed to Drilled and Cased
2019-04-19 Production Casing Operation Performed
2019-04-20 Rig Released
2019-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-08 Perforation Treatment Performed - Jet Perforation
2019-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-09 Perforation Treatment Performed - Jet Perforation
2019-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-10 Perforation Treatment Performed - Jet Perforation
2019-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-11 Perforation Treatment Performed - Jet Perforation
2019-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-12 Perforation Treatment Performed - Jet Perforation
2019-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Perforation Treatment Performed - Jet Perforation
2019-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-15 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-28 Well Fluid changed to Gas
2019-05-28 Well Mode changed to Testing
2019-07-10 Well Began Production
2019-07-10 Well Fluid changed to Gas
2019-07-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-04-08 Beaver Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-04-10 779.60 Deviate (5 - 79 degrees)
2019-04-14 2433.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-07 Multi-Stage Fracture 4903.10 4917.40 0
2019-05-08 Perforation 4756.00 4756.30 3
2019-05-15 Perforation 2765.00 2765.30 3
2019-05-15 Perforation 2790.00 2790.30 3
2019-05-15 Perforation 2815.00 2815.30 3
2019-05-15 Perforation 2840.00 2840.30 3
2019-05-15 Multi-Stage Fracture 2765.00 2840.30 0
2019-05-15 Perforation 2664.00 2664.30 3
2019-05-15 Perforation 2689.00 2689.30 3
2019-05-15 Perforation 2714.00 2714.30 3
2019-05-15 Perforation 2739.00 2739.30 3
2019-05-15 Multi-Stage Fracture 2664.00 2739.30 0
2019-05-08 Multi-Stage Fracture 4681.00 4756.30 0
2019-05-15 Perforation 2563.00 2563.30 3
2019-05-15 Perforation 2588.00 2588.30 3
2019-05-15 Perforation 2613.00 2613.30 3
2019-05-15 Perforation 2638.00 2638.30 3
2019-05-16 Multi-Stage Fracture 2563.00 2638.30 0
2019-05-09 Perforation 4581.00 4581.30 3
2019-05-09 Perforation 4606.00 4606.30 3
2019-05-09 Perforation 4530.00 4530.30 3
2019-05-09 Perforation 4555.00 4555.30 3
2019-05-09 Multi-Stage Fracture 4581.00 4656.30 0
2019-05-09 Perforation 4480.00 4480.30 3
2019-05-09 Perforation 4505.00 4505.30 3
2019-05-09 Multi-Stage Fracture 4480.00 4555.30 0
2019-05-08 Perforation 4790.00 4790.30 3
2019-05-09 Perforation 4379.00 4379.30 3
2019-05-09 Perforation 4404.00 4404.30 3
2019-05-09 Perforation 4429.00 4429.30 3
2019-05-09 Perforation 4454.00 4454.30 3
2019-05-09 Multi-Stage Fracture 4379.00 4454.30 0
2019-05-09 Perforation 4278.00 4278.30 3
2019-05-09 Perforation 4303.00 4303.30 3
2019-05-09 Perforation 4328.00 4328.30 3
2019-05-09 Perforation 4353.00 4353.30 3
2019-05-09 Multi-Stage Fracture 4278.00 4353.30 0
2019-05-08 Perforation 4815.00 4815.30 3
2019-05-09 Perforation 4177.00 4177.30 3
2019-05-09 Perforation 4202.00 4202.30 3
2019-05-09 Perforation 4227.00 4227.30 3
2019-05-09 Perforation 4252.00 4252.30 3
2019-05-09 Multi-Stage Fracture 4177.00 4252.30 0
2019-05-10 Perforation 4076.00 4076.30 3
2019-05-10 Perforation 4101.00 4101.30 3
2019-05-10 Perforation 4126.00 4126.30 3
2019-05-10 Perforation 4151.00 4151.30 3
2019-05-10 Multi-Stage Fracture 4076.00 4151.30 0
2019-05-08 Perforation 4840.00 4840.30 3
2019-05-10 Perforation 3975.00 3975.30 3
2019-05-10 Perforation 4000.00 4000.30 3
2019-05-10 Perforation 4025.00 4025.30 3
2019-05-10 Perforation 4050.00 4050.30 3
2019-05-10 Multi-Stage Fracture 3975.00 4050.30 0
2019-05-10 Perforation 3875.00 3875.30 3
2019-05-10 Perforation 3900.00 3900.30 3
2019-05-10 Perforation 3925.00 3925.30 3
2019-05-10 Perforation 3950.00 3950.30 3
2019-05-10 Multi-Stage Fracture 3875.00 3950.30 0
2019-05-08 Perforation 4865.00 4865.30 3
2019-05-10 Perforation 3774.00 3774.30 3
2019-05-10 Perforation 3799.00 3799.30 3
2019-05-10 Perforation 3824.00 3824.30 3
2019-05-10 Perforation 3849.00 3849.30 3
2019-05-10 Multi-Stage Fracture 3774.00 3849.30 0
2019-05-10 Perforation 3673.00 3673.30 3
2019-05-10 Perforation 3698.00 3698.30 3
2019-05-10 Perforation 3723.00 3723.30 3
2019-05-10 Perforation 3748.00 3748.30 3
2019-05-11 Multi-Stage Fracture 3673.00 3748.30 0
2019-05-08 Multi-Stage Fracture 4790.00 4865.30 0
2019-05-11 Perforation 3572.00 3572.30 3
2019-05-11 Perforation 3597.00 3597.30 3
2019-05-11 Perforation 3622.00 3622.30 3
2019-05-11 Perforation 3647.00 3647.30 3
2019-05-11 Multi-Stage Fracture 3572.00 3647.30 0
2019-05-12 Perforation 3471.00 3471.30 3
2019-05-12 Perforation 3496.00 3496.30 3
2019-05-12 Perforation 3521.00 3521.30 3
2019-05-12 Perforation 3546.00 3546.30 3
2019-05-12 Multi-Stage Fracture 3471.00 3546.30 0
2019-05-08 Perforation 4681.00 4681.30 3
2019-05-12 Perforation 3370.00 3370.30 3
2019-05-12 Perforation 3395.00 3395.30 3
2019-05-12 Perforation 3420.00 3420.30 3
2019-05-12 Perforation 3445.00 3445.30 3
2019-05-12 Multi-Stage Fracture 3370.00 3445.30 0
2019-05-12 Perforation 3269.00 3269.30 3
2019-05-12 Perforation 3294.00 3294.30 3
2019-05-12 Perforation 3319.00 3319.30 3
2019-05-12 Perforation 3344.00 3344.30 3
2019-05-12 Multi-Stage Fracture 3269.00 3344.30 0
2019-05-08 Perforation 4706.00 4706.30 3
2019-05-12 Perforation 3169.00 3169.30 3
2019-05-12 Perforation 3194.00 3194.30 3
2019-05-12 Perforation 3219.00 3219.30 3
2019-05-12 Perforation 3244.00 3244.30 3
2019-05-13 Multi-Stage Fracture 3169.00 3244.30 0
2019-05-13 Perforation 3068.00 3068.30 3
2019-05-13 Perforation 3093.00 3093.30 3
2019-05-13 Perforation 3118.00 3118.30 3
2019-05-13 Perforation 3143.00 3143.30 3
2019-05-13 Multi-Stage Fracture 3068.00 3143.30 0
2019-05-08 Perforation 4731.00 4731.30 3
2019-05-13 Perforation 2967.00 2967.30 3
2019-05-13 Perforation 2992.00 2992.30 3
2019-05-13 Perforation 3017.00 3017.30 3
2019-05-13 Perforation 3042.00 3042.30 3
2019-05-14 Multi-Stage Fracture 2967.00 3042.30 0
2019-05-14 Perforation 2866.00 2866.30 3
2019-05-14 Perforation 2891.00 2891.30 3
2019-05-14 Perforation 2916.00 2916.30 3
2019-05-14 Perforation 2941.00 2941.30 3
2019-05-15 Multi-Stage Fracture 2866.00 2941.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-07 2019-05-16 2,100 12,982 N/A
2 2019-05-16 2019-05-16 2,100 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.8356 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 10.7484 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.6064 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.7162 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0101 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0101 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0101 N/A
Polyethylene glycol 25322-68-3 100 0.0101 N/A
Sodium bromide 7647-15-6 100 0.0101 N/A
DWP-641. Friction Reducer Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0802 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0802 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0802 N/A
2 Customer Supplied Surfactant TenEx Technologies Surfactant Proprietary Trade Secret 100 0.0652 N/A
Water 7732-18-5 100 0.0652 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4639 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-20 No Incident Encountered 0.00 0.00
2019-05-24 No Incident Encountered 0.00 0.00

For data sources see[9]

References