X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121807020

Well Details

Well ID: 0796121807020
Loading map...
Location: 02/07-18-079-12W6/0
Location Alias: 02/07-18-79-12 W6M
Location Alias 2: 02/07-18-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 18
County/Municipality: Saddle Hills County
Well Name: BIR 14-6 HZ 102 PCOUPE 7-18-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0493302
License Date: 2019-01-09
License Status: Issued
Spud Date: 2019-02-06
Final Drill Date: 2019-02-16
Well Total Depth: 4662.00 m
Surface Hole Latitude: 55.824027
Surface Hole Longitude: -119.868620

For data sources see[1][2]

Well History

Date Event
2019-01-09 Obtained License
2019-02-07 Surface Casing Operation Performed
2019-02-09 Direction Drilling Operation Performed - Deviate
2019-02-11 Direction Drilling Operation Performed - Horizontal
2019-02-16 Finished Drilling
2019-02-16 Well Log Performed
2019-02-16 Well Mode changed to Drilled and Cased
2019-02-17 Production Casing Operation Performed
2019-02-17 Well Log Performed
2019-02-18 Rig Released
2019-05-08 Perforation Treatment Performed - Jet Perforation
2019-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-09 Perforation Treatment Performed - Jet Perforation
2019-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-10 Perforation Treatment Performed - Jet Perforation
2019-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-11 Perforation Treatment Performed - Jet Perforation
2019-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-12 Perforation Treatment Performed - Jet Perforation
2019-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Perforation Treatment Performed - Jet Perforation
2019-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-15 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-16 Perforation Treatment Performed - Jet Perforation
2019-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-06 Well Fluid changed to Gas
2019-06-06 Well Mode changed to Testing
2019-07-10 Well Began Production
2019-07-10 Well Fluid changed to Gas
2019-07-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-06 Beaver Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-09 1352.80 Deviate (5 - 79 degrees)
2019-02-11 2246.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-08 Multi-Stage Fracture 4606.70 4620.80 0
2019-05-08 Perforation 4473.00 4473.30 3
2019-05-15 Perforation 2655.00 2655.30 3
2019-05-15 Multi-Stage Fracture 2580.00 2655.30 0
2019-05-16 Perforation 2479.00 2479.30 3
2019-05-16 Perforation 2504.00 2504.30 3
2019-05-16 Perforation 2529.00 2529.30 3
2019-05-16 Perforation 2554.00 2554.30 3
2019-05-16 Multi-Stage Fracture 2479.00 2554.30 0
2019-05-16 Perforation 2378.00 2378.30 3
2019-05-16 Perforation 2403.00 2403.30 3
2019-05-16 Perforation 2428.00 2428.30 3
2019-05-09 Multi-Stage Fracture 4398.00 4473.30 0
2019-05-16 Perforation 2453.00 2453.30 3
2019-05-16 Multi-Stage Fracture 2378.00 2453.30 0
2019-05-16 Perforation 2277.00 2277.30 3
2019-05-16 Perforation 2302.00 2302.30 3
2019-05-16 Perforation 2327.00 2327.30 3
2019-05-16 Perforation 2352.00 2352.30 3
2019-05-16 Multi-Stage Fracture 2277.00 2352.30 0
2019-05-09 Perforation 4297.00 4297.30 3
2019-05-09 Perforation 4322.00 4322.30 3
2019-05-09 Perforation 4347.00 4347.30 3
2019-05-09 Perforation 4372.00 4372.30 3
2019-05-10 Multi-Stage Fracture 4297.00 4372.30 0
2019-05-10 Perforation 4196.00 4196.30 3
2019-05-10 Perforation 4221.00 4221.30 3
2019-05-10 Perforation 4246.00 4246.30 3
2019-05-08 Perforation 4507.00 4507.30 3
2019-05-10 Perforation 4271.00 4271.30 3
2019-05-10 Multi-Stage Fracture 4196.00 4271.30 0
2019-05-10 Perforation 4095.00 4095.30 3
2019-05-10 Perforation 4120.00 4120.30 3
2019-05-10 Perforation 4145.00 4145.30 3
2019-05-10 Perforation 4170.00 4170.30 3
2019-05-10 Multi-Stage Fracture 4095.00 4170.30 0
2019-05-10 Perforation 3994.00 3994.30 3
2019-05-10 Perforation 4019.00 4019.30 3
2019-05-10 Perforation 4044.00 4044.30 3
2019-05-08 Perforation 4532.00 4532.30 3
2019-05-10 Perforation 4069.00 4069.30 3
2019-05-11 Multi-Stage Fracture 3994.00 4069.30 0
2019-05-11 Perforation 3893.00 3893.30 3
2019-05-11 Perforation 3918.00 3918.30 3
2019-05-11 Perforation 3943.00 3943.30 3
2019-05-11 Perforation 3968.00 3968.30 3
2019-05-11 Multi-Stage Fracture 3893.00 3968.30 0
2019-05-11 Perforation 3792.00 3792.30 3
2019-05-11 Perforation 3817.00 3817.30 3
2019-05-11 Perforation 3842.00 3842.30 3
2019-05-08 Perforation 4557.00 4557.30 3
2019-05-11 Perforation 3867.00 3867.30 3
2019-05-11 Multi-Stage Fracture 3792.00 3867.30 0
2019-05-12 Perforation 3691.00 3691.30 3
2019-05-12 Perforation 3716.00 3716.30 3
2019-05-12 Perforation 3741.00 3741.30 3
2019-05-12 Perforation 3766.00 3766.30 3
2019-05-12 Multi-Stage Fracture 3691.00 3766.30 0
2019-05-12 Perforation 3590.00 3593.30 3
2019-05-12 Perforation 3615.00 3615.30 3
2019-05-12 Perforation 3640.00 3640.30 3
2019-05-08 Perforation 4582.00 4582.30 3
2019-05-12 Perforation 3665.00 3665.30 3
2019-05-12 Multi-Stage Fracture 3590.00 3665.30 0
2019-05-12 Perforation 3489.00 3489.30 3
2019-05-12 Perforation 3514.00 3514.30 3
2019-05-12 Perforation 3539.00 3539.30 3
2019-05-12 Perforation 3564.00 3564.30 3
2019-05-12 Multi-Stage Fracture 3489.00 3564.30 0
2019-05-13 Perforation 3388.00 3388.30 3
2019-05-13 Perforation 3413.00 3413.30 3
2019-05-13 Perforation 3438.00 3438.30 3
2019-05-08 Multi-Stage Fracture 4507.00 4582.30 0
2019-05-13 Perforation 3463.00 3463.30 3
2019-05-13 Multi-Stage Fracture 3388.00 3463.30 0
2019-05-13 Perforation 3287.00 3287.30 3
2019-05-13 Perforation 3312.00 3312.30 3
2019-05-13 Perforation 3337.00 3337.30 3
2019-05-13 Perforation 3362.00 3362.30 3
2019-05-13 Multi-Stage Fracture 3287.00 3362.30 0
2019-05-13 Perforation 3186.00 3186.30 3
2019-05-13 Perforation 3211.00 3211.30 3
2019-05-13 Perforation 3236.00 3236.30 3
2019-05-08 Perforation 4398.00 4398.30 3
2019-05-13 Perforation 3261.00 3261.30 3
2019-05-14 Multi-Stage Fracture 3186.00 3261.30 0
2019-05-14 Perforation 3085.00 3085.30 3
2019-05-14 Perforation 3110.00 3110.30 3
2019-05-14 Perforation 3135.00 3135.30 3
2019-05-14 Perforation 3160.00 3160.30 3
2019-05-14 Multi-Stage Fracture 3085.00 3160.30 0
2019-05-14 Perforation 2984.00 2984.30 3
2019-05-14 Perforation 3009.00 3009.30 3
2019-05-14 Perforation 3034.00 3034.30 3
2019-05-08 Perforation 4423.00 4423.30 3
2019-05-14 Perforation 3059.00 3059.30 3
2019-05-14 Multi-Stage Fracture 2984.00 3059.30 0
2019-05-14 Perforation 2883.00 2883.30 3
2019-05-14 Perforation 2908.00 2908.30 3
2019-05-14 Perforation 2933.00 2933.30 3
2019-05-14 Perforation 2958.00 2958.30 3
2019-05-14 Multi-Stage Fracture 2883.00 2958.30 0
2019-05-15 Perforation 2782.00 2782.30 3
2019-05-15 Perforation 2807.00 2807.30 3
2019-05-15 Perforation 2832.00 2832.30 3
2019-05-08 Perforation 4448.00 4448.30 3
2019-05-15 Perforation 2857.00 2857.30 3
2019-05-15 Multi-Stage Fracture 2782.00 2857.30 0
2019-05-15 Perforation 2681.00 2681.30 3
2019-05-15 Perforation 2706.00 2706.30 3
2019-05-15 Perforation 2731.00 2731.30 3
2019-05-15 Perforation 2756.00 2756.30 3
2019-05-15 Multi-Stage Fracture 2681.00 2756.30 0
2019-05-15 Perforation 2580.00 2580.30 3
2019-05-15 Perforation 2605.00 2605.30 3
2019-05-15 Perforation 2630.00 2630.30 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-08 2019-05-16 2,093 12,659 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.5574 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 10.9338 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.6859 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.7345 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0099 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0099 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0099 N/A
Polyethylene glycol 25322-68-3 100 0.0099 N/A
Sodium bromide 7647-15-6 100 0.0099 N/A
DWP-641. Friction Reducer Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0782 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0782 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0782 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4527 0.0 0.0 0.0
2020 2103 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-18 No Incident Encountered 0.00 0.00
2019-05-22 No Incident Encountered 0.00 0.00

For data sources see[9]

References