X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121806020

Well Details

Well ID: 0796121806020
Loading map...
Location: 02/06-18-079-12W6/0
Location Alias: 02/06-18-79-12 W6M
Location Alias 2: 02/06-18-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 18
County/Municipality: Saddle Hills County
Well Name: BIR 14-6 HZ 102 PCOUPE 6-18-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0492525
License Date: 2018-11-30
License Status: Amended
Spud Date: 2019-01-17
Final Drill Date: 2019-02-02
Well Total Depth: 4660.00 m
Surface Hole Latitude: 55.824028
Surface Hole Longitude: -119.868780

For data sources see[1][2]

Well History

Date Event
2018-11-30 Obtained License
2019-01-18 Surface Casing Operation Performed
2019-01-22 Direction Drilling Operation Performed - Deviate
2019-01-28 Direction Drilling Operation Performed - Horizontal
2019-02-02 Finished Drilling
2019-02-02 Well Log Performed
2019-02-02 Well Mode changed to Drilled and Cased
2019-02-03 Production Casing Operation Performed
2019-02-04 Rig Released
2019-05-08 Perforation Treatment Performed - Jet Perforation
2019-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-09 Perforation Treatment Performed - Jet Perforation
2019-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-10 Perforation Treatment Performed - Jet Perforation
2019-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-11 Perforation Treatment Performed - Jet Perforation
2019-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-12 Perforation Treatment Performed - Jet Perforation
2019-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Perforation Treatment Performed - Jet Perforation
2019-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-15 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-10 Well Fluid changed to Gas
2019-06-10 Well Mode changed to Testing
2019-07-10 Well Began Production
2019-07-10 Well Fluid changed to Gas
2019-07-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-17 Beaver Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-22 1390.20 Deviate (5 - 79 degrees)
2019-01-28 2209.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-08 Multi-Stage Fracture 4610.50 4625.30 0
2019-05-09 Perforation 4477.00 4477.30 3
2019-05-14 Perforation 2660.00 2660.30 3
2019-05-14 Multi-Stage Fracture 2585.00 2660.30 0
2019-05-14 Perforation 2484.00 2484.30 3
2019-05-14 Perforation 2509.00 2509.30 3
2019-05-14 Perforation 2534.00 2534.30 3
2019-05-14 Perforation 2559.00 2559.30 3
2019-05-15 Multi-Stage Fracture 2484.00 2559.30 0
2019-05-15 Perforation 2383.00 2383.30 3
2019-05-15 Perforation 2408.00 2408.30 3
2019-05-15 Perforation 2433.00 2433.30 3
2019-05-09 Multi-Stage Fracture 4402.00 4477.30 0
2019-05-15 Perforation 2458.00 2458.30 3
2019-05-15 Multi-Stage Fracture 2383.00 2458.30 0
2019-05-15 Perforation 2282.00 2282.30 3
2019-05-15 Perforation 2307.00 2307.30 3
2019-05-15 Perforation 2332.00 2332.30 3
2019-05-15 Perforation 2357.00 2357.30 3
2019-05-16 Multi-Stage Fracture 2282.00 2357.30 0
2019-05-09 Perforation 4301.00 4301.30 3
2019-05-09 Perforation 4326.00 4326.30 3
2019-05-09 Perforation 4351.00 4351.30 3
2019-05-09 Perforation 4376.00 4376.30 3
2019-05-09 Multi-Stage Fracture 4301.00 4376.30 0
2019-05-09 Perforation 4200.00 4200.30 3
2019-05-09 Perforation 4225.00 4225.30 3
2019-05-09 Perforation 4250.00 4250.30 3
2019-05-08 Perforation 4510.00 4510.30 3
2019-05-09 Perforation 4275.00 4275.30 3
2019-05-09 Multi-Stage Fracture 4200.00 4275.30 0
2019-05-09 Perforation 4099.00 4099.30 3
2019-05-09 Perforation 4124.00 4124.30 3
2019-05-09 Perforation 4149.00 4149.30 3
2019-05-09 Perforation 4174.00 4174.30 3
2019-05-09 Multi-Stage Fracture 4099.00 4174.30 0
2019-05-09 Perforation 3998.00 3998.30 3
2019-05-09 Perforation 4023.00 4023.30 3
2019-05-09 Perforation 4048.00 4048.30 3
2019-05-08 Perforation 4535.00 4535.30 3
2019-05-09 Perforation 4073.00 4073.30 3
2019-05-09 Multi-Stage Fracture 3998.00 4073.30 0
2019-05-10 Perforation 3897.00 3897.30 3
2019-05-10 Perforation 3922.00 3922.30 3
2019-05-10 Perforation 3947.00 3947.30 3
2019-05-10 Perforation 3972.00 3972.30 3
2019-05-10 Multi-Stage Fracture 3897.00 3972.30 0
2019-05-10 Perforation 3796.00 3796.30 3
2019-05-10 Perforation 3821.00 3821.30 3
2019-05-10 Perforation 3846.00 3846.30 3
2019-05-08 Perforation 4560.00 4560.30 3
2019-05-10 Perforation 3871.00 3871.30 3
2019-05-10 Multi-Stage Fracture 3796.00 3871.30 0
2019-05-10 Perforation 3695.00 3695.30 3
2019-05-10 Perforation 3720.00 3720.30 3
2019-05-10 Perforation 3745.00 3745.30 3
2019-05-10 Perforation 3770.00 3770.30 3
2019-05-10 Multi-Stage Fracture 3695.00 3770.30 0
2019-05-11 Perforation 3594.00 3594.30 3
2019-05-11 Perforation 3619.00 3619.30 3
2019-05-11 Perforation 3644.00 3644.30 3
2019-05-08 Perforation 4585.00 4585.30 3
2019-05-11 Perforation 3669.00 3669.30 3
2019-05-11 Multi-Stage Fracture 3594.00 3669.30 0
2019-05-11 Perforation 3494.00 3494.30 3
2019-05-11 Perforation 3519.00 3519.30 3
2019-05-11 Perforation 3544.00 3544.30 3
2019-05-11 Perforation 3569.00 3569.30 3
2019-05-11 Multi-Stage Fracture 3494.00 3569.30 0
2019-05-11 Perforation 3393.00 3393.30 3
2019-05-11 Perforation 3418.00 3418.30 3
2019-05-11 Perforation 3443.00 3443.30 3
2019-05-08 Multi-Stage Fracture 4510.00 4585.30 0
2019-05-11 Perforation 3468.00 3468.30 3
2019-05-12 Multi-Stage Fracture 3393.00 3468.30 0
2019-05-12 Perforation 3292.00 3292.30 3
2019-05-12 Perforation 3317.00 3317.30 3
2019-05-12 Perforation 3342.00 3342.30 3
2019-05-12 Perforation 3367.00 3367.30 3
2019-05-12 Multi-Stage Fracture 3292.00 3367.30 0
2019-05-12 Perforation 3191.00 3191.30 3
2019-05-12 Perforation 3216.00 3216.30 3
2019-05-12 Perforation 3241.00 3241.30 3
2019-05-09 Perforation 4402.00 4402.30 3
2019-05-12 Perforation 3266.00 3266.30 3
2019-05-12 Multi-Stage Fracture 3191.00 3266.30 0
2019-05-12 Perforation 3090.00 3090.30 3
2019-05-12 Perforation 3115.00 3115.30 3
2019-05-12 Perforation 3140.00 3140.30 3
2019-05-12 Perforation 3165.00 3165.30 3
2019-05-12 Multi-Stage Fracture 3090.00 3165.30 0
2019-05-12 Perforation 2989.00 2989.30 3
2019-05-12 Perforation 3014.00 3014.30 3
2019-05-12 Perforation 3039.00 3039.30 3
2019-05-09 Perforation 4427.00 4427.30 3
2019-05-12 Perforation 3064.00 3064.30 3
2019-05-13 Multi-Stage Fracture 2989.00 3064.30 0
2019-05-13 Perforation 2888.00 2888.30 3
2019-05-13 Perforation 2913.00 2913.30 3
2019-05-13 Perforation 2938.00 2938.30 3
2019-05-13 Perforation 2963.00 2963.30 3
2019-05-13 Multi-Stage Fracture 2888.00 2963.30 0
2019-05-13 Perforation 2787.00 2787.30 3
2019-05-13 Perforation 2812.00 2812.30 3
2019-05-13 Perforation 2837.00 2837.30 3
2019-05-09 Perforation 4452.00 4452.30 3
2019-05-13 Perforation 2862.00 2862.30 3
2019-05-13 Multi-Stage Fracture 2787.00 2862.30 0
2019-05-13 Perforation 2686.00 2686.30 3
2019-05-13 Perforation 2711.00 2711.30 3
2019-05-13 Perforation 2736.00 2736.30 3
2019-05-13 Perforation 2761.00 2761.30 3
2019-05-14 Multi-Stage Fracture 2686.00 2761.30 0
2019-05-14 Perforation 2585.00 2585.30 3
2019-05-14 Perforation 2610.00 2610.30 3
2019-05-14 Perforation 2635.00 2635.30 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-08 2019-05-16 2,095 12,463 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.3596 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.0464 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.7342 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.7695 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0101 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0101 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0101 N/A
Polyethylene glycol 25322-68-3 100 0.0101 N/A
Sodium bromide 7647-15-6 100 0.0101 N/A
DWP-641. Friction Reducer Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0798 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0798 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0798 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4473 0.0 0.0 0.0
2020 2085 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-04 No Incident Encountered 0.00 0.00
2019-05-23 No Incident Encountered 0.00 0.00

For data sources see[9]

References