X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121603020

Well Details

Well ID: 0796121603020
Loading map...
Location: 02/03-16-079-12W6/0
Location Alias: 02/03-16-79-12 W6M
Location Alias 2: 02/03-16-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 16
County/Municipality: Saddle Hills County
Well Name: CNRL 102 HZ PCOUPE 3-16-79-12
Operator Name: Canadian Natural Resources Limited
License Number: 0486085
License Date: 2017-10-30
License Status: Issued
Spud Date: 2018-01-04
Final Drill Date: 2018-01-21
Well Total Depth: 5326.00 m
Surface Hole Latitude: 55.871861
Surface Hole Longitude: -119.816708

For data sources see[1][2]

Well History

Date Event
2017-10-30 Obtained License
2018-01-04 Surface Casing Operation Performed
2018-01-07 Direction Drilling Operation Performed - Deviate
2018-01-12 Direction Drilling Operation Performed - Horizontal
2018-01-21 Finished Drilling
2018-01-21 Well Log Performed
2018-01-21 Well Mode changed to Drilled and Cased
2018-01-24 Perforation Treatment Performed - Open-Hole Completion
2018-01-24 Production Casing Operation Performed
2018-01-24 Rig Released
2018-04-05 Well Log Performed
2018-04-06 Well Log Performed
2018-05-31 Well Log Performed
2018-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-17 Perforation Treatment Performed - Fractured
2018-06-17 Perforation Treatment Performed - Jet Perforation
2018-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-01 Well Began Production
2018-07-01 Well Fluid changed to Crude Oil
2018-07-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-04 Horizon Drilling Inc. 52 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-07 1701.00 Deviate (5 - 79 degrees)
2018-01-12 2065.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-24 Open Hole/Barefoot Completion 5321.00 5326.00 0
2018-06-15 Multi-Stage Fracture 4711.70 4711.80 0
2018-06-15 Multi-Stage Fracture 4653.90 4654.00 0
2018-06-15 Multi-Stage Fracture 4595.70 4595.80 0
2018-06-15 Multi-Stage Fracture 4537.00 4537.10 0
2018-06-16 Multi-Stage Fracture 4479.00 4479.10 0
2018-06-16 Multi-Stage Fracture 4420.00 4420.10 0
2018-06-16 Multi-Stage Fracture 4361.20 4361.30 0
2018-06-16 Multi-Stage Fracture 4303.00 4303.10 0
2018-06-16 Multi-Stage Fracture 4243.80 4243.90 0
2018-06-16 Multi-Stage Fracture 4184.90 4185.00 0
2018-06-15 Multi-Stage Fracture 5281.50 5281.60 0
2018-06-16 Multi-Stage Fracture 4126.30 4126.40 0
2018-06-16 Multi-Stage Fracture 4067.90 4068.00 0
2018-06-16 Multi-Stage Fracture 4009.50 4009.60 0
2018-06-16 Multi-Stage Fracture 3936.40 3936.50 0
2018-06-16 Multi-Stage Fracture 3863.90 3864.00 0
2018-06-16 Multi-Stage Fracture 3791.50 3791.60 0
2018-06-16 Multi-Stage Fracture 3719.10 3719.20 0
2018-06-16 Multi-Stage Fracture 3646.60 3646.70 0
2018-06-16 Multi-Stage Fracture 3574.20 3574.30 0
2018-06-16 Multi-Stage Fracture 3501.10 3501.20 0
2018-06-15 Multi-Stage Fracture 5235.30 5235.40 0
2018-06-17 Multi-Stage Fracture 3429.80 3429.90 0
2018-06-17 Multi-Stage Fracture 3356.70 3356.80 0
2018-06-17 Multi-Stage Fracture 3284.40 3284.50 0
2018-06-17 Multi-Stage Fracture 3212.80 3212.90 0
2018-06-17 Multi-Stage Fracture 3140.80 3140.90 0
2018-06-17 Multi-Stage Fracture 3067.80 3067.90 0
2018-06-17 Multi-Stage Fracture 2994.90 2995.00 0
2018-06-17 Multi-Stage Fracture 2921.90 2922.00 0
2018-06-17 Multi-Stage Fracture 2849.80 2849.90 0
2018-06-17 Multi-Stage Fracture 2776.90 2777.00 0
2018-06-15 Multi-Stage Fracture 5062.80 5062.90 0
2018-06-17 Multi-Stage Fracture 2703.80 2703.90 0
2018-06-17 Multi-Stage Fracture 2631.40 2631.50 0
2018-06-17 Multi-Stage Fracture 2558.30 2558.40 0
2018-06-17 Perforation 2505.00 2505.50 20
2018-06-17 Perforation 2475.00 2475.50 20
2018-06-17 Perforation 2450.00 2450.50 20
2018-06-17 Perforation 2420.00 2420.50 20
2018-06-17 Perforation 2390.00 2390.50 20
2018-06-17 Perforation 2324.00 2324.50 20
2018-06-17 Fracture 2324.00 2505.50 0
2018-06-15 Multi-Stage Fracture 5003.90 5004.00 0
2018-06-15 Multi-Stage Fracture 4945.50 4945.60 0
2018-06-15 Multi-Stage Fracture 4886.40 4886.50 0
2018-06-15 Multi-Stage Fracture 4827.90 4828.00 0
2018-06-15 Multi-Stage Fracture 4769.60 4769.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-15 2018-06-17 2,020 19,208 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.4426 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 18.4804 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0768 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0768 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0768 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-15 2018-06-17 Surface Water - Runoff 20213

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 253 0.0 0.0 0.0
2019 8178 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-24 No Incident Encountered 0.00 0.00
2018-06-18 No Incident Encountered 0.00 0.00
2018-10-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References