X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121306000

Well Details

Well ID: 0796121306000
Loading map...
Location: 00/06-13-079-12W6/0
Location Alias: 00/06-13-79-12 W6M
Location Alias 2: 00/06-13-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 5-7 HZ GORD 6-13-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0480786
License Date: 2016-10-14
License Status: Issued
Spud Date: 2016-12-07
Final Drill Date: 2016-12-16
Well Total Depth: 4100.00 m
Surface Hole Latitude: 55.830535
Surface Hole Longitude: -119.718286

For data sources see[1][2]

Well History

Date Event
2016-10-14 Obtained License
2016-12-08 Surface Casing Operation Performed
2016-12-10 Direction Drilling Operation Performed - Deviate
2016-12-12 Direction Drilling Operation Performed - Horizontal
2016-12-13 Well Log Performed
2016-12-16 Finished Drilling
2016-12-16 Well Log Performed
2016-12-16 Well Mode changed to Drilled and Cased
2016-12-17 Production Casing Operation Performed
2016-12-18 Rig Released
2017-01-12 Well Log Performed
2017-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-23 Perforation Treatment Performed - Open-Hole Completion
2017-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-27 Well Began Production
2017-01-27 Well Fluid changed to Crude Oil
2017-01-27 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-07 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-10 1008.90 Deviate (5 - 79 degrees)
2016-12-12 2187.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-23 Open Hole/Barefoot Completion 4095.00 4100.00 0
2017-01-23 Multi-Stage Fracture 3599.10 3599.90 0
2017-01-23 Multi-Stage Fracture 3539.20 3540.00 0
2017-01-23 Multi-Stage Fracture 3479.30 3480.10 0
2017-01-23 Multi-Stage Fracture 3431.00 3431.80 0
2017-01-23 Multi-Stage Fracture 3382.70 3383.50 0
2017-01-23 Multi-Stage Fracture 3334.40 3335.20 0
2017-01-23 Multi-Stage Fracture 3286.00 3286.80 0
2017-01-23 Multi-Stage Fracture 3237.70 3238.50 0
2017-01-23 Multi-Stage Fracture 3189.40 3190.20 0
2017-01-23 Multi-Stage Fracture 3141.10 3141.90 0
2017-01-23 Multi-Stage Fracture 4072.00 4073.30 0
2017-01-23 Multi-Stage Fracture 3092.70 3093.50 0
2017-01-23 Multi-Stage Fracture 3044.40 3045.20 0
2017-01-23 Multi-Stage Fracture 2996.20 2997.10 0
2017-01-23 Multi-Stage Fracture 2948.20 2949.10 0
2017-01-23 Multi-Stage Fracture 2900.20 2901.10 0
2017-01-23 Multi-Stage Fracture 2852.40 2853.30 0
2017-01-24 Multi-Stage Fracture 2804.30 2805.20 0
2017-01-24 Multi-Stage Fracture 2756.00 2756.90 0
2017-01-24 Multi-Stage Fracture 2707.80 2708.70 0
2017-01-24 Multi-Stage Fracture 2659.50 2660.40 0
2017-01-23 Multi-Stage Fracture 4018.20 4019.00 0
2017-01-24 Multi-Stage Fracture 2611.20 2612.10 0
2017-01-24 Multi-Stage Fracture 2563.30 2564.20 0
2017-01-24 Multi-Stage Fracture 2515.40 2516.30 0
2017-01-24 Multi-Stage Fracture 2467.50 2468.40 0
2017-01-24 Multi-Stage Fracture 2419.70 2420.60 0
2017-01-24 Multi-Stage Fracture 2371.70 2372.60 0
2017-01-24 Multi-Stage Fracture 2323.80 2324.70 0
2017-01-24 Multi-Stage Fracture 2276.40 2277.30 0
2017-01-24 Multi-Stage Fracture 2239.80 2240.70 0
2017-01-23 Multi-Stage Fracture 3958.30 3959.10 0
2017-01-23 Multi-Stage Fracture 3898.50 3899.30 0
2017-01-23 Multi-Stage Fracture 3838.60 3839.40 0
2017-01-23 Multi-Stage Fracture 3778.70 3779.50 0
2017-01-23 Multi-Stage Fracture 3718.80 3719.60 0
2017-01-23 Multi-Stage Fracture 3658.90 3659.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-23 2017-01-24 2,030 9,384 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.2617 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.6473 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.9916 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.01 N/A
Non-Hazardous Ingredients Trade Secret 100 0.01 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0891 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0891 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0891 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-22 2017-01-26 Surface Water - Runoff 9189
2017-01-23 2017-01-26 Groundwater - Saline 218

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6327 0.0 0.0 0.0
2018 8584 0.0 0.0 0.0
2019 8598 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-18 No Incident Encountered 0.00 0.00
2017-01-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References