X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121304020

Well Details

Well ID: 0796121304020
Loading map...
Location: 02/04-13-079-12W6/0
Location Alias: 02/04-13-79-12 W6M
Location Alias 2: 02/04-13-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 5-7 HZ 102 GORD 4-13-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0480807
License Date: 2016-10-17
License Status: Issued
Spud Date: 2016-11-03
Final Drill Date: 2016-11-18
Well Total Depth: 4070.00 m
Surface Hole Latitude: 55.830364
Surface Hole Longitude: -119.718185

For data sources see[1][2]

Well History

Date Event
2016-10-17 Obtained License
2016-11-05 Surface Casing Operation Performed
2016-11-07 Direction Drilling Operation Performed - Deviate
2016-11-15 Direction Drilling Operation Performed - Horizontal
2016-11-15 Well Log Performed
2016-11-18 Finished Drilling
2016-11-18 Well Log Performed
2016-11-18 Well Mode changed to Drilled and Cased
2016-11-19 Well Log Performed
2016-11-20 Production Casing Operation Performed
2016-11-21 Rig Released
2017-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-25 Perforation Treatment Performed - Open-Hole Completion
2017-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Testing
2017-02-04 Well Began Production
2017-02-04 Well Fluid changed to Gas
2017-02-04 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-11-03 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-07 831.80 Deviate (5 - 79 degrees)
2016-11-15 2170.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-25 Open Hole/Barefoot Completion 4069.00 4070.00 0
2017-01-26 Multi-Stage Fracture 3597.60 3598.40 0
2017-01-26 Multi-Stage Fracture 3549.40 3550.20 0
2017-01-26 Multi-Stage Fracture 3489.70 3490.50 0
2017-01-26 Multi-Stage Fracture 3441.50 3442.30 0
2017-01-26 Multi-Stage Fracture 3381.80 3382.60 0
2017-01-26 Multi-Stage Fracture 3333.60 3334.40 0
2017-01-26 Multi-Stage Fracture 3273.90 3274.70 0
2017-01-26 Multi-Stage Fracture 3225.70 3226.50 0
2017-01-26 Multi-Stage Fracture 3166.00 3166.80 0
2017-01-26 Multi-Stage Fracture 3117.80 3118.60 0
2017-01-25 Multi-Stage Fracture 4046.00 4047.30 0
2017-01-26 Multi-Stage Fracture 3058.00 3058.80 0
2017-01-26 Multi-Stage Fracture 3009.90 3010.70 0
2017-01-26 Multi-Stage Fracture 2950.10 2950.90 0
2017-01-26 Multi-Stage Fracture 2901.90 2902.70 0
2017-01-26 Multi-Stage Fracture 2853.70 2854.50 0
2017-01-26 Multi-Stage Fracture 2805.50 2806.30 0
2017-01-26 Multi-Stage Fracture 2757.30 2758.10 0
2017-01-26 Multi-Stage Fracture 2709.10 2709.90 0
2017-01-26 Multi-Stage Fracture 2660.90 2661.70 0
2017-01-26 Multi-Stage Fracture 2612.70 2613.50 0
2017-01-25 Multi-Stage Fracture 3980.70 3981.50 0
2017-01-26 Multi-Stage Fracture 2564.40 2565.20 0
2017-01-26 Multi-Stage Fracture 2516.20 2517.00 0
2017-01-26 Multi-Stage Fracture 2468.00 2468.80 0
2017-01-26 Multi-Stage Fracture 2419.80 2420.60 0
2017-01-26 Multi-Stage Fracture 2371.60 2372.40 0
2017-01-26 Multi-Stage Fracture 2323.50 2324.30 0
2017-01-26 Multi-Stage Fracture 2275.30 2276.10 0
2017-01-26 Multi-Stage Fracture 2227.10 2227.90 0
2017-01-26 Multi-Stage Fracture 2190.40 2191.20 0
2017-01-25 Multi-Stage Fracture 3920.90 3921.70 0
2017-01-25 Multi-Stage Fracture 3872.80 3873.60 0
2017-01-25 Multi-Stage Fracture 3813.30 3814.10 0
2017-01-25 Multi-Stage Fracture 3765.20 3766.00 0
2017-01-25 Multi-Stage Fracture 3705.40 3706.20 0
2017-01-26 Multi-Stage Fracture 3657.30 3658.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-25 2017-01-26 2,041 8,551 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.0171 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.5234 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.3675 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.01 N/A
Non-Hazardous Ingredients Trade Secret 100 0.01 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0818 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0818 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0818 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-22 2017-01-26 Surface Water - Runoff 8373
2017-01-23 2017-01-26 Groundwater - Saline 199

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6550 0.0 0.0 0.0
2018 8593 0.0 0.0 0.0
2019 8649 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-21 No Incident Encountered 0.00 0.00
2017-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References