X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121303000

Well Details

Well ID: 0796121303000
Loading map...
Location: 00/03-13-079-12W6/0
Location Alias: 00/03-13-79-12 W6M
Location Alias 2: 00/03-13-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 5-7 HZ GORD 3-13-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0480790
License Date: 2016-10-14
License Status: Issued
Spud Date: 2016-11-23
Final Drill Date: 2016-12-02
Well Total Depth: 4044.00 m
Surface Hole Latitude: 55.830450
Surface Hole Longitude: -119.718237

For data sources see[1][2]

Well History

Date Event
2016-10-14 Obtained License
2016-11-24 Surface Casing Operation Performed
2016-11-25 Direction Drilling Operation Performed - Deviate
2016-11-28 Direction Drilling Operation Performed - Horizontal
2016-11-29 Well Log Performed
2016-12-02 Finished Drilling
2016-12-02 Well Log Performed
2016-12-02 Well Mode changed to Drilled and Cased
2016-12-03 Production Casing Operation Performed
2016-12-05 Rig Released
2017-01-10 Well Fluid changed to Gas
2017-01-10 Well Mode changed to Testing
2017-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-24 Perforation Treatment Performed - Open-Hole Completion
2017-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-28 Well Began Production
2017-01-28 Well Fluid changed to Gas
2017-01-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-11-23 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-25 862.00 Deviate (5 - 79 degrees)
2016-11-28 2179.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-24 Open Hole/Barefoot Completion 4039.00 4044.00 0
2017-01-24 Multi-Stage Fracture 3566.40 3567.30 0
2017-01-24 Multi-Stage Fracture 3518.10 3519.00 0
2017-01-24 Multi-Stage Fracture 3469.70 3470.60 0
2017-01-24 Multi-Stage Fracture 3421.40 3422.30 0
2017-01-25 Multi-Stage Fracture 3373.10 3374.00 0
2017-01-25 Multi-Stage Fracture 3324.80 3325.70 0
2017-01-25 Multi-Stage Fracture 3276.50 3277.40 0
2017-01-25 Multi-Stage Fracture 3228.20 3229.10 0
2017-01-25 Multi-Stage Fracture 3179.90 3180.80 0
2017-01-25 Multi-Stage Fracture 3131.60 3132.50 0
2017-01-24 Multi-Stage Fracture 4016.10 4017.40 0
2017-01-25 Multi-Stage Fracture 3083.30 3084.20 0
2017-01-25 Multi-Stage Fracture 3035.00 3035.90 0
2017-01-25 Multi-Stage Fracture 2986.70 2987.60 0
2017-01-25 Multi-Stage Fracture 2938.30 2939.20 0
2017-01-25 Multi-Stage Fracture 2890.00 2890.90 0
2017-01-25 Multi-Stage Fracture 2841.70 2842.60 0
2017-01-25 Multi-Stage Fracture 2793.40 2794.30 0
2017-01-25 Multi-Stage Fracture 2745.00 2745.90 0
2017-01-25 Multi-Stage Fracture 2696.70 2697.60 0
2017-01-25 Multi-Stage Fracture 2648.40 2649.30 0
2017-01-24 Multi-Stage Fracture 3962.20 3963.10 0
2017-01-25 Multi-Stage Fracture 2600.10 2601.00 0
2017-01-25 Multi-Stage Fracture 2551.80 2552.70 0
2017-01-25 Multi-Stage Fracture 2503.50 2504.40 0
2017-01-25 Multi-Stage Fracture 2455.20 2456.10 0
2017-01-25 Multi-Stage Fracture 2406.90 2407.80 0
2017-01-25 Multi-Stage Fracture 2358.60 2359.50 0
2017-01-25 Multi-Stage Fracture 2310.30 2311.20 0
2017-01-25 Multi-Stage Fracture 2261.90 2262.80 0
2017-01-25 Multi-Stage Fracture 2225.20 2226.10 0
2017-01-24 Multi-Stage Fracture 3902.40 3903.20 0
2017-01-24 Multi-Stage Fracture 3842.50 3843.40 0
2017-01-24 Multi-Stage Fracture 3782.70 3783.60 0
2017-01-24 Multi-Stage Fracture 3722.80 3723.70 0
2017-01-24 Multi-Stage Fracture 3663.00 3663.90 0
2017-01-24 Multi-Stage Fracture 3614.70 3615.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-24 2017-01-25 2,036 8,626 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.1336 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.1549 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.6038 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0117 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0117 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0958 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0958 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0958 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-22 2017-01-26 Surface Water - Runoff 8023
2017-01-23 2017-01-26 Groundwater - Saline 191

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6672 0.0 0.0 0.0
2018 8610 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-05 No Incident Encountered 0.00 0.00
2017-01-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References