X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796121205030

Well Details

Well ID: 0796121205030
Loading map...
Location: 03/05-12-079-12W6/0
Location Alias: 03/05-12-79-12 W6M
Location Alias 2: 03/05-12-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 12
County/Municipality: Saddle Hills County
Well Name: BIR 2-6 HZ 103 PCOUPES 5-12-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0483162
License Date: 2017-03-13
License Status: Issued
Spud Date: 2017-05-15
Final Drill Date: 2017-05-25
Well Total Depth: 4992.00 m
Surface Hole Latitude: 55.814406
Surface Hole Longitude: -119.709471

For data sources see[1][2]

Well History

Date Event
2017-03-13 Obtained License
2017-05-16 Surface Casing Operation Performed
2017-05-17 Direction Drilling Operation Performed - Deviate
2017-05-20 Direction Drilling Operation Performed - Horizontal
2017-05-21 Well Log Performed
2017-05-25 Finished Drilling
2017-05-25 Well Log Performed
2017-05-25 Well Mode changed to Drilled and Cased
2017-05-26 Well Log Performed
2017-05-30 Production Casing Operation Performed
2017-05-31 Rig Released
2017-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-25 Perforation Treatment Performed - Open-Hole Completion
2017-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-08 Well Began Production
2017-08-08 Well Fluid changed to Crude Oil
2017-08-08 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-05-15 Ensign Drilling Inc. 556 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-05-17 679.50 Deviate (5 - 79 degrees)
2017-05-20 2324.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-25 Open Hole/Barefoot Completion 4988.20 4992.00 0
2017-06-27 Multi-Stage Fracture 4577.20 4579.30 0
2017-06-27 Multi-Stage Fracture 4538.40 4540.50 0
2017-06-27 Multi-Stage Fracture 4488.00 4490.10 0
2017-06-27 Multi-Stage Fracture 4437.70 4439.80 0
2017-06-27 Multi-Stage Fracture 4387.40 4389.50 0
2017-06-27 Multi-Stage Fracture 4337.10 4339.20 0
2017-06-27 Multi-Stage Fracture 4286.60 4288.70 0
2017-06-27 Multi-Stage Fracture 4236.50 4238.60 0
2017-06-28 Multi-Stage Fracture 4186.20 4186.30 0
2017-06-28 Multi-Stage Fracture 4085.30 4087.40 0
2017-06-25 Multi-Stage Fracture 4925.70 4927.80 0
2017-06-28 Multi-Stage Fracture 4035.10 4037.20 0
2017-06-29 Multi-Stage Fracture 3984.80 3986.90 0
2017-06-29 Multi-Stage Fracture 3934.20 3936.30 0
2017-06-29 Multi-Stage Fracture 3883.60 3885.70 0
2017-06-29 Multi-Stage Fracture 3833.40 3835.50 0
2017-06-29 Multi-Stage Fracture 3782.70 3784.80 0
2017-07-18 Multi-Stage Fracture 3732.60 3734.70 0
2017-07-18 Multi-Stage Fracture 3682.20 3684.30 0
2017-07-18 Multi-Stage Fracture 3631.60 3633.70 0
2017-07-18 Multi-Stage Fracture 3581.10 3583.20 0
2017-06-26 Multi-Stage Fracture 4886.90 4889.00 0
2017-07-18 Multi-Stage Fracture 3530.90 3533.00 0
2017-07-18 Multi-Stage Fracture 3480.70 3482.80 0
2017-07-18 Multi-Stage Fracture 3430.20 3432.30 0
2017-07-18 Multi-Stage Fracture 3379.60 3381.70 0
2017-07-18 Multi-Stage Fracture 3329.80 3331.90 0
2017-07-18 Multi-Stage Fracture 3279.30 3281.40 0
2017-07-18 Multi-Stage Fracture 3229.00 3231.10 0
2017-07-18 Multi-Stage Fracture 3178.70 3180.80 0
2017-07-18 Multi-Stage Fracture 3129.30 3131.40 0
2017-07-19 Multi-Stage Fracture 3079.20 3081.30 0
2017-06-26 Multi-Stage Fracture 4847.90 4850.00 0
2017-07-19 Multi-Stage Fracture 3029.00 3031.10 0
2017-07-19 Multi-Stage Fracture 2979.10 2981.20 0
2017-07-19 Multi-Stage Fracture 2928.90 2931.00 0
2017-07-19 Multi-Stage Fracture 2879.10 2881.20 0
2017-07-19 Multi-Stage Fracture 2828.50 2830.60 0
2017-07-19 Multi-Stage Fracture 2778.40 2780.50 0
2017-07-19 Multi-Stage Fracture 2728.10 2730.20 0
2017-07-19 Multi-Stage Fracture 2678.10 2680.20 0
2017-07-19 Multi-Stage Fracture 2627.60 2629.70 0
2017-07-19 Multi-Stage Fracture 2577.20 2579.30 0
2017-06-26 Multi-Stage Fracture 4809.40 4811.50 0
2017-07-19 Multi-Stage Fracture 2527.00 2529.10 0
2017-07-19 Multi-Stage Fracture 2476.50 2478.60 0
2017-07-19 Multi-Stage Fracture 2426.40 2428.50 0
2017-07-19 Multi-Stage Fracture 2376.20 2378.30 0
2017-06-26 Multi-Stage Fracture 4731.80 4733.90 0
2017-06-26 Multi-Stage Fracture 4693.00 4695.10 0
2017-06-26 Multi-Stage Fracture 4654.50 4656.60 0
2017-06-27 Multi-Stage Fracture 4616.00 4618.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-25 2017-07-19 2,157 12,956 N/A
2 2017-06-26 2017-07-18 2,157 0 N/A
3 2017-07-18 2017-07-19 2,157 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.3133 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.0073 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.1445 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.4059 N/A
Water 7732-18-5 100 0.4059 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0118 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0118 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0012 N/A
Cinnamaldehyde 104-55-2 100 0.0012 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0012 N/A
Ethylene Glycol 107-21-1 100 0.0012 N/A
Formic acid 64-18-6 100 0.0012 N/A
Isopropyl alcohol 67-63-0 100 0.0012 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0012 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0012 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1041 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0077 N/A
Water 7732-18-5 100 0.0077 N/A
3 CalVert LT Calfrac Diverting Agent Non-Hazardous Ingredients Trade Secret 100 0.02 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-19 2017-07-20 Groundwater - Saline 434
2017-06-26 2017-07-01 Oilfield Produced Water 59
2017-04-30 2017-06-30 Recycled Fracturing Water (treated at well site) 616
2017-07-19 2017-07-19 Recycled Fracturing Water (treated at well site) 54
2017-04-29 2017-05-03 Recycled Fracturing Water (treated at well site) 519
2017-06-19 2017-07-19 Surface Water - Runoff 11737

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3011 0.0 0.0 0.0
2018 8179 0.0 0.0 0.0
2019 8645 0.0 0.0 0.0
2020 2148 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-31 No Incident Encountered 0.00 0.00
2017-07-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References