If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796120516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.80427,"lon":-119.843431,"icon":""}]} |
Location: 00/16-05-079-12W6/0 | |
Location Alias: 00/16-05-79-12 W6M | |
Location Alias 2: 00/16-05-079-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 12 | |
Section: 05 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 10-31 HZ PCOUPE 16-5-79-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0480816 | |
License Date: 2016-10-19 | |
License Status: Issued | |
Spud Date: 2016-11-19 | |
Final Drill Date: 2016-11-30 | |
Well Total Depth: 4481.00 m | |
Surface Hole Latitude: 55.804270 | |
Surface Hole Longitude: -119.843431 |
Date | Event |
---|---|
2016-10-19 | Obtained License |
2016-11-20 | Surface Casing Operation Performed |
2016-11-21 | Direction Drilling Operation Performed - Deviate |
2016-11-26 | Direction Drilling Operation Performed - Horizontal |
2016-11-26 | Well Log Performed |
2016-11-30 | Finished Drilling |
2016-11-30 | Well Log Performed |
2016-11-30 | Well Mode changed to Drilled and Cased |
2016-12-01 | Well Log Performed |
2016-12-02 | Production Casing Operation Performed |
2016-12-08 | Rig Released |
2017-01-01 | Well Fluid changed to Gas |
2017-01-01 | Well Mode changed to Testing |
2017-01-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-07 | Perforation Treatment Performed - Open-Hole Completion |
2017-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-13 | Well Began Production |
2017-01-13 | Well Fluid changed to Gas |
2017-01-13 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-11-19 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-11-21 | 769.70 | Deviate (5 - 79 degrees) |
2016-11-26 | 2376.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-07 | Open Hole/Barefoot Completion | 4477.10 | 4481.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 3786.50 | 3787.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 3696.60 | 3697.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 3607.30 | 3608.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 3530.20 | 3537.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 3440.30 | 3441.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 3363.10 | 3363.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 3273.50 | 3274.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 3197.10 | 3197.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 3107.30 | 3108.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 3030.20 | 3030.90 | 0 |
2017-01-07 | Multi-Stage Fracture | 4460.00 | 4461.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 2940.30 | 2941.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 2863.40 | 2864.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 2773.70 | 2774.40 | 0 |
2017-01-09 | Multi-Stage Fracture | 2696.80 | 2697.50 | 0 |
2017-01-09 | Multi-Stage Fracture | 2607.50 | 2608.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 2530.80 | 2531.50 | 0 |
2017-01-07 | Multi-Stage Fracture | 4396.80 | 4397.50 | 0 |
2017-01-07 | Multi-Stage Fracture | 4320.40 | 4321.10 | 0 |
2017-01-08 | Multi-Stage Fracture | 4231.30 | 4232.00 | 0 |
2017-01-08 | Multi-Stage Fracture | 4142.90 | 4143.60 | 0 |
2017-01-08 | Multi-Stage Fracture | 4054.40 | 4055.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 3964.70 | 3965.40 | 0 |
2017-01-09 | Multi-Stage Fracture | 3874.80 | 3875.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-07 | 2017-01-09 | 2,144 | 9,207 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 83.2246 | N/A | |||
FRAC SAND. 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 10.0016 | N/A | ||
FRAC SAND. 40/70 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.6355 | N/A | ||
2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0217 | N/A | |
Methanol | 67-56-1 | 100 | 0.0217 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0217 | N/A | ||||
Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0036 | N/A | |
FRP-1 | Baker Hughes | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.0939 | N/A | |
Non-hazardous | Not Available | 100 | 0.0939 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-12-16 | 2017-01-04 | Surface Water - Runoff | 1061 |
2017-01-06 | 2017-01-10 | Surface Water - Runoff | 5275 |
2017-01-10 | 2017-01-10 | Surface Water - Runoff | 1243 |
2017-01-10 | 2017-01-11 | Surface Water - Runoff | 394 |
2016-12-16 | 2017-01-11 | Groundwater - Saline | 466 |
2016-12-17 | 2017-01-08 | Recycled Fracturing Water (treated at independent stand-alone facility) | 689 |
2016-12-21 | 2017-01-09 | Recycled Fracturing Water (treated at well site) | 79 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7341 | 0.0 | 0.0 | 0.0 |
2018 | 7173 | 0.0 | 0.0 | 0.0 |
2019 | 8166 | 0.0 | 0.0 | 0.0 |
2020 | 938 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-08 | No Incident Encountered | 0.00 | 0.00 |
2017-01-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]