X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796120514000

Well Details

Well ID: 0796120514000
Loading map...
Location: 00/14-05-079-12W6/0
Location Alias: 00/14-05-79-12 W6M
Location Alias 2: 00/14-05-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 05
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPE 14-5-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0475344
License Date: 2015-04-28
License Status: Amended
Spud Date: 2015-07-16
Final Drill Date: 2015-07-27
Well Total Depth: 4289.00 m
Surface Hole Latitude: 55.804271
Surface Hole Longitude: -119.844308

For data sources see[1][2]

Well History

Date Event
2015-04-28 Obtained License
2015-07-18 Surface Casing Operation Performed
2015-07-20 Direction Drilling Operation Performed - Deviate
2015-07-22 Direction Drilling Operation Performed - Horizontal
2015-07-22 Well Log Performed
2015-07-27 Finished Drilling
2015-07-27 Well Log Performed
2015-07-27 Well Mode changed to Drilled and Cased
2015-07-29 Liner Casing Operation Performed
2015-07-29 Production Casing Operation Performed
2015-07-30 Rig Released
2015-08-01 Well Fluid changed to Gas
2015-08-01 Well Mode changed to Testing
2015-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-07 Perforation Treatment Performed - Open-Hole Completion
2015-08-07 Well Log Performed
2015-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-15 Well Began Production
2015-08-15 Well Fluid changed to Gas
2015-08-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-16 Ensign Drilling Inc. 111 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-20 1892.60 Deviate (5 - 79 degrees)
2015-07-22 2261.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-07 Open Hole/Barefoot Completion 4282.00 4289.00 0
2015-08-11 Multi-Stage Fracture 3633.60 3634.40 0
2015-08-11 Multi-Stage Fracture 3553.20 3554.00 0
2015-08-11 Multi-Stage Fracture 3460.30 3461.10 0
2015-08-11 Multi-Stage Fracture 3379.70 3380.50 0
2015-08-11 Multi-Stage Fracture 3299.30 3300.10 0
2015-08-12 Multi-Stage Fracture 3206.50 3207.30 0
2015-08-12 Multi-Stage Fracture 3126.10 3126.90 0
2015-08-12 Multi-Stage Fracture 3045.50 3046.30 0
2015-08-12 Multi-Stage Fracture 2952.40 2953.20 0
2015-08-12 Multi-Stage Fracture 2872.30 2873.10 0
2015-08-07 Multi-Stage Fracture 4264.80 4265.60 0
2015-08-12 Multi-Stage Fracture 2779.20 2780.00 0
2015-08-12 Multi-Stage Fracture 2698.60 2699.40 0
2015-08-12 Multi-Stage Fracture 2618.10 2618.90 0
2015-08-12 Multi-Stage Fracture 2525.00 2525.80 0
2015-08-12 Multi-Stage Fracture 2444.50 2445.30 0
2015-08-12 Multi-Stage Fracture 2364.00 2364.80 0
2015-08-12 Multi-Stage Fracture 2270.90 2271.70 0
2015-08-11 Multi-Stage Fracture 4221.30 4222.10 0
2015-08-11 Multi-Stage Fracture 4140.80 4141.60 0
2015-08-11 Multi-Stage Fracture 4060.20 4061.00 0
2015-08-11 Multi-Stage Fracture 3967.10 3967.90 0
2015-08-11 Multi-Stage Fracture 3887.00 3887.80 0
2015-08-11 Multi-Stage Fracture 3806.50 3807.30 0
2015-08-11 Multi-Stage Fracture 3713.80 3714.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-07 2015-08-11 2,145 0 N/A
2 2015-08-07 2015-08-12 2,145 8,672 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.7551 N/A
2 potassium chloride 7447-40-7 100 78.5998 N/A
water Not Available 100 78.5998 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.208 N/A
silica crystalline 14808-60-7 100 3.208 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 17.8674 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0206 N/A
dibromoacetonitrile 3252-43-5 100 0.0206 N/A
non-hazardous ingredients Not Available 100 0.0206 N/A
polyethylene glycol 25322-68-3 100 0.0206 N/A
sodium bromide 7647-15-6 100 0.0206 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0836 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0836 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0836 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-05 2015-08-12 Recycled Fracturing Water (treated at well site) 786
2015-08-05 2015-08-12 Recycled Fracturing Water (treated at well site) 788
2015-08-05 2015-08-12 Recycled Fracturing Water (treated at well site) 741
2015-08-05 2015-08-12 Recycled Fracturing Water (treated at well site) 753
2015-08-05 2015-08-12 Recycled Fracturing Water (treated at well site) 816
2015-08-08 2015-08-12 Groundwater - Saline 420
2015-08-10 2015-08-12 Surface Water - Runoff 485
2015-08-11 2015-08-12 Surface Water - Runoff 1897
2015-08-08 2015-08-12 Surface Water - Runoff 1726
2015-08-07 2015-08-08 Surface Water - Runoff 260

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2972 0.0 0.0 0.0
2016 8675 0.0 0.0 0.0
2017 7776 0.0 0.0 0.0
2018 7001 0.0 0.0 0.0
2019 8682 0.0 0.0 0.0
2020 1961 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-30 No Incident Encountered 0.00 0.00
2015-08-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References