X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796120513030

Well Details

Well ID: 0796120513030
Loading map...
Location: 03/13-05-079-12W6/0
Location Alias: 03/13-05-79-12 W6M
Location Alias 2: 03/13-05-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 05
County/Municipality: Saddle Hills County
Well Name: BIR 10-31 HZ 103 PCOUPE 13-5-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0487240
License Date: 2017-12-15
License Status: Issued
Spud Date: 2018-01-01
Final Drill Date: 2018-03-05
Well Total Depth: 4448.00 m
Surface Hole Latitude: 55.804870
Surface Hole Longitude: -119.844384

For data sources see[1][2]

Well History

Date Event
2017-12-15 Obtained License
2018-01-02 Surface Casing Operation Performed
2018-02-22 Direction Drilling Operation Performed - Deviate
2018-03-01 Direction Drilling Operation Performed - Horizontal
2018-03-05 Finished Drilling
2018-03-05 Production Casing Operation Performed
2018-03-05 Well Log Performed
2018-03-05 Well Mode changed to Drilled and Cased
2018-03-07 Rig Released
2018-03-07 Well Log Performed
2018-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-26 Perforation Treatment Performed - Open-Hole Completion
2018-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-01 Well Fluid changed to Gas
2018-04-01 Well Mode changed to Testing
2018-04-02 Well Began Production
2018-04-02 Well Fluid changed to Gas
2018-04-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-01 Trinidad Drilling Ltd. 438 N/A Set Surface
2018-02-22 Trinidad Drilling Ltd. 438 N/A Drill To LD
2018-01-24 Trinidad Drilling Ltd. 438 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-22 727.10 Deviate (5 - 79 degrees)
2018-03-01 2309.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-26 Open Hole/Barefoot Completion 4444.00 4448.00 0
2018-03-27 Multi-Stage Fracture 4021.20 4022.10 0
2018-03-27 Multi-Stage Fracture 3973.30 3974.20 0
2018-03-27 Multi-Stage Fracture 3914.20 3915.10 0
2018-03-27 Multi-Stage Fracture 3866.00 3866.90 0
2018-03-27 Multi-Stage Fracture 3806.90 3807.80 0
2018-03-27 Multi-Stage Fracture 3759.20 3760.10 0
2018-03-27 Multi-Stage Fracture 3711.10 3712.00 0
2018-03-27 Multi-Stage Fracture 3651.80 3652.70 0
2018-03-27 Multi-Stage Fracture 3604.10 3605.00 0
2018-03-27 Multi-Stage Fracture 3545.30 3546.20 0
2018-03-26 Multi-Stage Fracture 4432.00 4433.30 0
2018-03-27 Multi-Stage Fracture 3497.80 3498.70 0
2018-03-27 Multi-Stage Fracture 3438.50 3439.40 0
2018-03-27 Multi-Stage Fracture 3390.30 3391.20 0
2018-03-27 Multi-Stage Fracture 3331.10 3332.00 0
2018-03-27 Multi-Stage Fracture 3283.20 3284.10 0
2018-03-27 Multi-Stage Fracture 3223.90 3224.80 0
2018-03-27 Multi-Stage Fracture 3176.50 3177.40 0
2018-03-27 Multi-Stage Fracture 3117.00 3117.90 0
2018-03-27 Multi-Stage Fracture 3069.20 3070.10 0
2018-03-27 Multi-Stage Fracture 3010.20 3011.10 0
2018-03-26 Multi-Stage Fracture 4401.50 4402.40 0
2018-03-27 Multi-Stage Fracture 2962.10 2963.00 0
2018-03-27 Multi-Stage Fracture 2914.20 2915.10 0
2018-03-27 Multi-Stage Fracture 2854.80 2855.70 0
2018-03-27 Multi-Stage Fracture 2807.30 2808.20 0
2018-03-28 Multi-Stage Fracture 2747.70 2748.60 0
2018-03-28 Multi-Stage Fracture 2699.90 2700.80 0
2018-03-28 Multi-Stage Fracture 2640.50 2641.40 0
2018-03-28 Multi-Stage Fracture 2592.60 2593.50 0
2018-03-28 Multi-Stage Fracture 2533.50 2534.40 0
2018-03-28 Multi-Stage Fracture 2486.20 2487.10 0
2018-03-26 Multi-Stage Fracture 4342.40 4343.30 0
2018-03-28 Multi-Stage Fracture 2438.10 2439.00 0
2018-03-28 Multi-Stage Fracture 2390.30 2391.20 0
2018-03-28 Multi-Stage Fracture 2354.10 2355.00 0
2018-03-26 Multi-Stage Fracture 4294.70 4295.60 0
2018-03-27 Multi-Stage Fracture 4235.20 4236.10 0
2018-03-27 Multi-Stage Fracture 4187.60 4188.50 0
2018-03-27 Multi-Stage Fracture 4128.30 4129.20 0
2018-03-27 Multi-Stage Fracture 4080.60 4081.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-26 2018-03-28 2,156 10,848 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.9971 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.1387 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.7737 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0108 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0108 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0108 N/A
Polyethylene glycol 25322-68-3 100 0.0108 N/A
Sodium bromide 7647-15-6 100 0.0108 N/A
DynaRate 6104 Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0794 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0794 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0794 N/A
Oleamide Trade Secret 100 0.0794 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-20 2018-03-30 Recycled Fracturing Water (treated at well site) 1213
2018-03-26 2018-03-27 Surface Water - Runoff 194
2018-03-21 2018-03-22 Surface Water - Runoff 1423
2018-03-22 2018-03-23 Surface Water - Runoff 1170
2018-03-24 2018-03-25 Surface Water - Runoff 1174
2018-03-23 2018-03-24 Surface Water - Runoff 1693
2018-03-25 2018-03-28 Surface Water - Runoff 1444
2018-03-26 2018-03-27 Surface Water - Runoff 964
2018-03-28 2018-03-29 Surface Water - Runoff 1361
2018-03-28 2018-03-29 Surface Water - Runoff 190

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5066 0.0 0.0 0.0
2019 8642 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-07 No Incident Encountered 0.00 0.00
2018-04-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References