X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796120416000

Well Details

Well ID: 0796120416000
Loading map...
Location: 00/16-04-079-12W6/0
Location Alias: 00/16-04-79-12 W6M
Location Alias 2: 00/16-04-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 04
County/Municipality: Saddle Hills County
Well Name: BIR 07-33 HZ PCOUPE 16-4-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0481909
License Date: 2016-12-15
License Status: Amended
Spud Date: 2017-03-01
Final Drill Date: 2017-03-12
Well Total Depth: 4559.00 m
Surface Hole Latitude: 55.802694
Surface Hole Longitude: -119.793838

For data sources see[1][2]

Well History

Date Event
2016-12-15 Obtained License
2017-03-03 Surface Casing Operation Performed
2017-03-05 Direction Drilling Operation Performed - Deviate
2017-03-08 Direction Drilling Operation Performed - Horizontal
2017-03-12 Finished Drilling
2017-03-12 Well Log Performed
2017-03-12 Well Mode changed to Drilled and Cased
2017-03-15 Production Casing Operation Performed
2017-03-16 Rig Released
2017-04-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-21 Perforation Treatment Performed - Open-Hole Completion
2017-04-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-27 Well Began Production
2017-04-27 Well Fluid changed to Gas
2017-04-27 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-01 Ensign Drilling Inc. 556 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-05 1806.20 Deviate (5 - 79 degrees)
2017-03-08 2286.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-21 Open Hole/Barefoot Completion 4558.90 4559.00 0
2017-04-22 Multi-Stage Fracture 4154.70 4155.60 0
2017-04-22 Multi-Stage Fracture 4106.40 4107.30 0
2017-04-22 Multi-Stage Fracture 4046.50 4047.40 0
2017-04-22 Multi-Stage Fracture 3998.30 3999.20 0
2017-04-22 Multi-Stage Fracture 3950.00 3950.90 0
2017-04-22 Multi-Stage Fracture 3901.70 3902.60 0
2017-04-22 Multi-Stage Fracture 3841.90 3842.80 0
2017-04-22 Multi-Stage Fracture 3793.50 3794.40 0
2017-04-22 Multi-Stage Fracture 3745.20 3746.10 0
2017-04-22 Multi-Stage Fracture 3697.00 3697.90 0
2017-04-21 Multi-Stage Fracture 4546.70 4548.00 0
2017-04-22 Multi-Stage Fracture 3637.20 3638.10 0
2017-04-22 Multi-Stage Fracture 3588.90 3589.80 0
2017-04-22 Multi-Stage Fracture 3540.60 3541.50 0
2017-04-22 Multi-Stage Fracture 3492.30 3493.20 0
2017-04-22 Multi-Stage Fracture 3444.00 3444.90 0
2017-04-22 Multi-Stage Fracture 3384.20 3385.10 0
2017-04-22 Multi-Stage Fracture 3335.90 3336.80 0
2017-04-22 Multi-Stage Fracture 3287.60 3288.50 0
2017-04-22 Multi-Stage Fracture 3239.20 3240.10 0
2017-04-22 Multi-Stage Fracture 3179.40 3180.30 0
2017-04-21 Multi-Stage Fracture 4504.40 4505.30 0
2017-04-22 Multi-Stage Fracture 3131.00 3131.90 0
2017-04-22 Multi-Stage Fracture 3082.70 3083.60 0
2017-04-22 Multi-Stage Fracture 3034.40 3035.30 0
2017-04-22 Multi-Stage Fracture 2974.50 2975.40 0
2017-04-22 Multi-Stage Fracture 2926.20 2927.10 0
2017-04-23 Multi-Stage Fracture 2877.80 2878.70 0
2017-04-23 Multi-Stage Fracture 2829.40 2830.30 0
2017-04-23 Multi-Stage Fracture 2781.10 2782.00 0
2017-04-23 Multi-Stage Fracture 2732.70 2733.60 0
2017-04-23 Multi-Stage Fracture 2684.40 2685.30 0
2017-04-21 Multi-Stage Fracture 4456.10 4457.00 0
2017-04-23 Multi-Stage Fracture 2636.10 2637.00 0
2017-04-23 Multi-Stage Fracture 2587.80 2588.70 0
2017-04-23 Multi-Stage Fracture 2539.50 2540.40 0
2017-04-23 Multi-Stage Fracture 2491.20 2492.10 0
2017-04-23 Multi-Stage Fracture 2442.80 2443.70 0
2017-04-23 Multi-Stage Fracture 2394.40 2395.30 0
2017-04-23 Multi-Stage Fracture 2357.60 2358.50 0
2017-04-21 Multi-Stage Fracture 4407.80 4408.70 0
2017-04-21 Multi-Stage Fracture 4359.50 4360.40 0
2017-04-22 Multi-Stage Fracture 4311.10 4312.00 0
2017-04-22 Multi-Stage Fracture 4251.30 4252.20 0
2017-04-22 Multi-Stage Fracture 4203.00 4203.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-21 2017-04-23 2,142 13,095 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.0487 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.4149 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.4285 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0087 N/A
Dibromoacetonitrile 3252-43-5 100 0.0087 N/A
Polyethylene Glycol 25322-68-3 100 0.0087 N/A
Sodium Bromide 7647-15-6 100 0.0087 N/A
Water 7732-18-5 100 0.0087 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0022 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0945 N/A
Oxyalkylated alcohol 9014 100 0.0945 N/A
Petroleum distillates 64742-47-8 100 0.0945 N/A
Polyacrylate 9014 100 0.0945 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-04-08 2017-05-18 Surface Water - Runoff 11272
2017-04-11 2017-04-13 Groundwater - Saline 250
2017-04-10 2017-04-12 Recycled Fracturing Water (treated at well site) 150
2017-04-11 2017-04-24 Recycled Fracturing Water (treated at independent stand-alone facility) 644
2017-04-13 2017-05-15 Recycled Fracturing Water (treated at well site) 275
2017-04-13 2017-05-15 Recycled Fracturing Water (treated at well site) 371
2017-04-13 2017-05-15 Recycled Fracturing Water (treated at well site) 410
2017-04-13 2017-05-15 Recycled Fracturing Water (treated at well site) 325

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4534 0.0 0.0 0.0
2018 8550 0.0 0.0 0.0
2019 8402 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-16 No Incident Encountered 0.00 0.00
2017-04-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References