If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796120415020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.799493,"lon":-119.82612,"icon":""}]} |
Location: 02/15-04-079-12W6/0 | |
Location Alias: 02/15-04-79-12 W6M | |
Location Alias 2: 02/15-04-079-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 12 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 6-32 HZ 102 PCOUPE 15-4-79-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0491534 | |
License Date: 2018-10-22 | |
License Status: Issued | |
Spud Date: 2019-01-17 | |
Final Drill Date: 2019-01-28 | |
Well Total Depth: 4884.00 m | |
Surface Hole Latitude: 55.799493 | |
Surface Hole Longitude: -119.826120 |
Date | Event |
---|---|
2018-10-22 | Obtained License |
2019-01-18 | Surface Casing Operation Performed |
2019-01-19 | Direction Drilling Operation Performed - Deviate |
2019-01-24 | Direction Drilling Operation Performed - Horizontal |
2019-01-25 | Well Log Performed |
2019-01-28 | Finished Drilling |
2019-01-28 | Well Mode changed to Drilled and Cased |
2019-01-29 | Production Casing Operation Performed |
2019-01-29 | Well Log Performed |
2019-01-31 | Rig Released |
2019-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-06 | Perforation Treatment Performed - Open-Hole Completion |
2019-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-04 | Well Fluid changed to Gas |
2019-04-04 | Well Mode changed to Testing |
2019-05-02 | Well Began Production |
2019-05-02 | Well Fluid changed to Gas |
2019-05-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-01-17 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-01-19 | 608.20 | Deviate (5 - 79 degrees) |
2019-01-24 | 2570.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-06 | Open Hole/Barefoot Completion | 4881.00 | 4884.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 4436.20 | 4437.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 4378.30 | 4379.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 4331.50 | 4332.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 4273.80 | 4274.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 4227.20 | 4228.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 4169.00 | 4169.90 | 0 |
2019-03-07 | Multi-Stage Fracture | 4122.10 | 4123.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 4074.70 | 4075.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 4016.40 | 4017.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 3969.10 | 3970.00 | 0 |
2019-03-06 | Multi-Stage Fracture | 4846.00 | 4847.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 3910.80 | 3911.70 | 0 |
2019-03-09 | Multi-Stage Fracture | 3863.30 | 3864.20 | 0 |
2019-03-09 | Multi-Stage Fracture | 3816.50 | 3817.40 | 0 |
2019-03-09 | Multi-Stage Fracture | 3758.50 | 3759.40 | 0 |
2019-03-09 | Multi-Stage Fracture | 3712.00 | 3712.90 | 0 |
2019-03-09 | Multi-Stage Fracture | 3665.40 | 3666.30 | 0 |
2019-03-09 | Multi-Stage Fracture | 3606.90 | 3607.80 | 0 |
2019-03-09 | Multi-Stage Fracture | 3560.40 | 3561.30 | 0 |
2019-03-09 | Multi-Stage Fracture | 3502.00 | 3502.90 | 0 |
2019-03-09 | Multi-Stage Fracture | 3455.00 | 3455.90 | 0 |
2019-03-06 | Multi-Stage Fracture | 4797.30 | 4798.20 | 0 |
2019-03-09 | Multi-Stage Fracture | 3397.20 | 3398.10 | 0 |
2019-03-10 | Multi-Stage Fracture | 3350.10 | 3351.00 | 0 |
2019-03-10 | Multi-Stage Fracture | 3303.10 | 3304.00 | 0 |
2019-03-10 | Multi-Stage Fracture | 3244.80 | 3245.70 | 0 |
2019-03-10 | Multi-Stage Fracture | 3197.70 | 3198.60 | 0 |
2019-03-10 | Multi-Stage Fracture | 3139.70 | 3140.60 | 0 |
2019-03-10 | Multi-Stage Fracture | 3092.90 | 3093.80 | 0 |
2019-03-10 | Multi-Stage Fracture | 3034.60 | 3035.50 | 0 |
2019-03-10 | Multi-Stage Fracture | 2987.80 | 2988.70 | 0 |
2019-03-10 | Multi-Stage Fracture | 2941.00 | 2941.90 | 0 |
2019-03-06 | Multi-Stage Fracture | 4739.40 | 4740.30 | 0 |
2019-03-11 | Multi-Stage Fracture | 2883.30 | 2884.20 | 0 |
2019-03-11 | Multi-Stage Fracture | 2836.40 | 2837.30 | 0 |
2019-03-11 | Multi-Stage Fracture | 2778.60 | 2779.50 | 0 |
2019-03-11 | Multi-Stage Fracture | 2732.20 | 2733.10 | 0 |
2019-03-11 | Multi-Stage Fracture | 2674.30 | 2675.20 | 0 |
2019-03-11 | Multi-Stage Fracture | 2627.50 | 2628.40 | 0 |
2019-03-11 | Multi-Stage Fracture | 2580.90 | 2581.80 | 0 |
2019-03-06 | Multi-Stage Fracture | 4692.90 | 4693.80 | 0 |
2019-03-06 | Multi-Stage Fracture | 4634.80 | 4635.70 | 0 |
2019-03-06 | Multi-Stage Fracture | 4588.10 | 4589.00 | 0 |
2019-03-06 | Multi-Stage Fracture | 4541.00 | 4541.90 | 0 |
2019-03-06 | Multi-Stage Fracture | 4483.10 | 4484.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-03-06 | 2019-03-11 | 2,216 | 12,606 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.572 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.1839 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.1121 | N/A | ||
SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0107 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0107 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0107 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0107 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
DynaRate 6202D. Friction Reducer | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0228 | N/A | |
Third Party Surfactant | Calfrac | Surfactant | Citrus terpenes | 94266-47-4 | 100 | 0.0982 | N/A | |
Dipropylene Glycol Methyl Ether | 34590-94-8 | 100 | 0.0982 | N/A | ||||
Nonionic Polymer | Trade Secret | 100 | 0.0982 | N/A | ||||
Nonionic Surfactant | Trade Secret | 100 | 0.0982 | N/A | ||||
Organic Polyol | Trade Secret | 100 | 0.0982 | N/A | ||||
Pineterpene | Trade Secret | 100 | 0.0982 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0982 | N/A |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6250 | 0.0 | 0.0 | 0.0 |
2020 | 2182 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-31 | No Incident Encountered | 0.00 | 0.00 |
2019-04-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]