X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796120414030

Well Details

Well ID: 0796120414030
Loading map...
Location: 03/14-04-079-12W6/0
Location Alias: 03/14-04-79-12 W6M
Location Alias 2: 03/14-04-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 04
County/Municipality: Saddle Hills County
Well Name: BIR HZ 103 PCOUPE 14-4-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0496222
License Date: 2019-10-30
License Status: Issued
Spud Date: 2020-01-13
Final Drill Date: 2020-01-26
Well Total Depth: 4958.00 m
Surface Hole Latitude: 55.799201
Surface Hole Longitude: -119.824857

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-13 Ensign Drilling Inc. 557 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-16 726.80 Deviate (5 - 79 degrees)
2020-01-21 2333.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-07 Multi-Stage Fracture 4909.00 4922.30 0
2020-02-08 Perforation 4702.00 4702.30 3
2020-02-12 Perforation 2897.00 2897.30 3
2020-02-12 Multi-Stage Fracture 2897.00 2972.30 0
2020-02-13 Perforation 2872.00 2872.30 3
2020-02-13 Perforation 2847.00 2847.30 3
2020-02-13 Perforation 2822.00 2822.30 3
2020-02-13 Perforation 2797.00 2797.30 3
2020-02-13 Multi-Stage Fracture 2797.00 2872.30 0
2020-02-13 Perforation 2771.00 2771.30 3
2020-02-13 Perforation 2746.00 2746.30 3
2020-02-13 Perforation 2721.00 2721.30 3
2020-02-09 Multi-Stage Fracture 4702.00 4777.30 0
2020-02-13 Perforation 2696.00 2696.30 3
2020-02-13 Multi-Stage Fracture 2696.00 2771.30 0
2020-02-13 Perforation 2420.00 2420.30 3
2020-02-09 Perforation 4677.00 4677.30 3
2020-02-09 Perforation 4652.00 4652.30 3
2020-02-09 Perforation 4627.00 4627.30 3
2020-02-09 Perforation 4602.00 4602.30 3
2020-02-09 Multi-Stage Fracture 4602.00 4677.30 0
2020-02-09 Perforation 4576.00 4576.30 3
2020-02-09 Perforation 4551.00 4551.30 3
2020-02-09 Perforation 4526.00 4526.30 3
2020-02-08 Perforation 4885.00 4885.30 3
2020-02-09 Perforation 4501.00 4501.30 3
2020-02-09 Multi-Stage Fracture 4501.00 4576.30 0
2020-02-10 Perforation 4476.00 4476.30 3
2020-02-10 Perforation 4451.00 4451.30 3
2020-02-10 Perforation 4426.00 4426.30 3
2020-02-10 Perforation 4401.00 4401.30 3
2020-02-10 Multi-Stage Fracture 4401.00 4476.30 0
2020-02-10 Perforation 4376.00 4376.30 3
2020-02-10 Perforation 4351.00 4351.30 3
2020-02-10 Perforation 4326.00 4326.30 3
2020-02-08 Perforation 4860.00 4860.30 3
2020-02-10 Perforation 4301.00 4301.30 3
2020-02-10 Multi-Stage Fracture 4301.00 4376.30 0
2020-02-10 Perforation 4276.00 4276.30 3
2020-02-10 Perforation 4251.00 4251.30 3
2020-02-10 Perforation 4226.00 4226.30 3
2020-02-10 Perforation 4201.00 4201.30 3
2020-02-10 Multi-Stage Fracture 4201.00 4276.30 0
2020-02-10 Perforation 4175.00 4175.30 3
2020-02-10 Perforation 4150.00 4150.30 3
2020-02-10 Perforation 4125.00 4125.30 3
2020-02-08 Perforation 4835.00 4835.30 3
2020-02-10 Perforation 4100.00 4100.30 3
2020-02-10 Multi-Stage Fracture 4100.00 4175.30 0
2020-02-10 Perforation 4075.00 4075.30 3
2020-02-10 Perforation 4050.00 4050.30 3
2020-02-10 Perforation 4025.00 4025.30 3
2020-02-10 Perforation 4000.00 4000.30 3
2020-02-10 Multi-Stage Fracture 4000.00 4075.30 0
2020-02-11 Perforation 3975.00 3975.30 3
2020-02-11 Perforation 3950.00 3950.30 3
2020-02-11 Perforation 3925.00 3925.30 3
2020-02-08 Perforation 4810.00 4810.30 3
2020-02-11 Perforation 3900.00 3900.30 3
2020-02-11 Multi-Stage Fracture 3900.00 3975.30 0
2020-02-11 Perforation 3874.00 3874.30 3
2020-02-11 Perforation 3849.00 3849.30 3
2020-02-11 Perforation 3824.00 3824.30 3
2020-02-11 Perforation 3799.00 3799.30 3
2020-02-11 Multi-Stage Fracture 3799.00 3874.30 0
2020-02-11 Perforation 3774.00 3774.30 3
2020-02-11 Perforation 3749.00 3749.30 3
2020-02-11 Perforation 3724.00 3724.30 3
2020-02-08 Multi-Stage Fracture 4810.00 4885.30 0
2020-02-11 Perforation 3699.00 3699.30 3
2020-02-11 Multi-Stage Fracture 3699.00 3774.30 0
2020-02-11 Perforation 3674.00 3674.30 3
2020-02-11 Perforation 3649.00 3649.30 3
2020-02-11 Perforation 3624.00 3624.30 3
2020-02-11 Perforation 3599.00 3599.30 3
2020-02-11 Multi-Stage Fracture 3599.00 3674.30 0
2020-02-11 Perforation 3574.00 3574.30 3
2020-02-11 Perforation 3549.00 3549.30 3
2020-02-11 Perforation 3524.00 3524.30 3
2020-02-08 Perforation 4777.00 4777.30 3
2020-02-11 Perforation 3499.00 3499.30 3
2020-02-11 Multi-Stage Fracture 3499.00 3574.30 0
2020-02-11 Perforation 3473.00 3473.30 3
2020-02-11 Perforation 3448.00 3448.30 3
2020-02-11 Perforation 3423.00 3423.30 3
2020-02-11 Perforation 3398.00 3398.30 3
2020-02-11 Multi-Stage Fracture 3398.00 3473.30 0
2020-02-11 Perforation 3373.00 3373.30 3
2020-02-11 Perforation 3348.00 3348.30 3
2020-02-11 Perforation 3323.00 3323.30 3
2020-02-08 Perforation 4752.00 4752.30 3
2020-02-11 Perforation 3298.00 3298.30 3
2020-02-12 Multi-Stage Fracture 3298.00 3373.30 0
2020-02-12 Perforation 3273.00 3273.30 3
2020-02-12 Perforation 3248.00 3248.30 3
2020-02-12 Perforation 3223.00 3223.30 3
2020-02-12 Perforation 3198.00 3198.30 3
2020-02-12 Multi-Stage Fracture 3198.00 3273.30 0
2020-02-12 Perforation 3173.00 3173.30 3
2020-02-12 Perforation 3148.00 3148.30 3
2020-02-12 Perforation 3123.00 3123.30 3
2020-02-08 Perforation 4727.00 4727.30 3
2020-02-12 Perforation 3098.00 3098.30 3
2020-02-12 Multi-Stage Fracture 3098.00 3173.30 0
2020-02-12 Perforation 3072.00 3072.30 3
2020-02-12 Perforation 3047.00 3047.30 3
2020-02-12 Perforation 3022.00 3022.30 3
2020-02-12 Perforation 2997.00 2997.30 3
2020-02-12 Multi-Stage Fracture 2997.00 3072.30 0
2020-02-12 Perforation 2972.00 2972.30 3
2020-02-12 Perforation 2947.00 2947.30 3
2020-02-12 Perforation 2922.00 2922.30 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 907 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-27 No Incident Encountered 0.00 0.00
2020-02-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References