If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796120414020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.799403,"lon":-119.826125,"icon":""}]} |
Location: 02/14-04-079-12W6/0 | |
Location Alias: 02/14-04-79-12 W6M | |
Location Alias 2: 02/14-04-079-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 12 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 6-32 HZ 102 PCOUPE 14-4-79-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0492076 | |
License Date: 2018-11-15 | |
License Status: Issued | |
Spud Date: 2019-02-01 | |
Final Drill Date: 2019-02-14 | |
Well Total Depth: 4785.00 m | |
Surface Hole Latitude: 55.799403 | |
Surface Hole Longitude: -119.826125 |
Date | Event |
---|---|
2018-11-15 | Obtained License |
2019-02-01 | Surface Casing Operation Performed |
2019-02-03 | Direction Drilling Operation Performed - Deviate |
2019-02-08 | Direction Drilling Operation Performed - Horizontal |
2019-02-09 | Well Log Performed |
2019-02-14 | Finished Drilling |
2019-02-14 | Well Log Performed |
2019-02-14 | Well Mode changed to Drilled and Cased |
2019-02-15 | Production Casing Operation Performed |
2019-02-15 | Well Log Performed |
2019-02-16 | Rig Released |
2019-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-07 | Perforation Treatment Performed - Open-Hole Completion |
2019-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-04 | Well Fluid changed to Gas |
2019-04-04 | Well Mode changed to Testing |
2019-05-02 | Well Began Production |
2019-05-02 | Well Fluid changed to Gas |
2019-05-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-02-01 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-02-03 | 696.90 | Deviate (5 - 79 degrees) |
2019-02-08 | 2444.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-07 | Open Hole/Barefoot Completion | 4783.00 | 4785.00 | 0 |
2019-03-29 | Multi-Stage Fracture | 3980.30 | 3981.20 | 0 |
2019-03-29 | Multi-Stage Fracture | 3925.40 | 3926.30 | 0 |
2019-03-29 | Multi-Stage Fracture | 3870.40 | 3871.30 | 0 |
2019-03-29 | Multi-Stage Fracture | 3828.80 | 3829.70 | 0 |
2019-03-29 | Multi-Stage Fracture | 3773.20 | 3774.10 | 0 |
2019-03-29 | Multi-Stage Fracture | 3717.30 | 3718.20 | 0 |
2019-03-29 | Multi-Stage Fracture | 3675.20 | 3676.10 | 0 |
2019-03-29 | Multi-Stage Fracture | 3622.30 | 3623.20 | 0 |
2019-03-29 | Multi-Stage Fracture | 3566.40 | 3567.30 | 0 |
2019-03-29 | Multi-Stage Fracture | 3511.50 | 3512.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 2333.40 | 2335.00 | 0 |
2019-03-29 | Multi-Stage Fracture | 3469.10 | 3470.00 | 0 |
2019-03-29 | Multi-Stage Fracture | 3413.90 | 3414.80 | 0 |
2019-03-29 | Multi-Stage Fracture | 3358.00 | 3358.90 | 0 |
2019-03-29 | Multi-Stage Fracture | 3306.50 | 3307.40 | 0 |
2019-03-29 | Multi-Stage Fracture | 3264.20 | 3265.10 | 0 |
2019-03-29 | Multi-Stage Fracture | 3209.90 | 3210.80 | 0 |
2019-03-29 | Multi-Stage Fracture | 3154.00 | 3154.90 | 0 |
2019-03-29 | Multi-Stage Fracture | 3111.70 | 3112.60 | 0 |
2019-03-29 | Multi-Stage Fracture | 3056.00 | 3056.90 | 0 |
2019-03-29 | Multi-Stage Fracture | 3000.60 | 3001.50 | 0 |
2019-03-28 | Multi-Stage Fracture | 4342.80 | 4343.70 | 0 |
2019-03-29 | Multi-Stage Fracture | 2946.40 | 2947.30 | 0 |
2019-03-29 | Multi-Stage Fracture | 2904.00 | 2904.90 | 0 |
2019-03-29 | Multi-Stage Fracture | 2848.90 | 2849.80 | 0 |
2019-03-29 | Multi-Stage Fracture | 2793.70 | 2794.60 | 0 |
2019-03-29 | Multi-Stage Fracture | 2751.30 | 2752.20 | 0 |
2019-03-29 | Multi-Stage Fracture | 2695.90 | 2696.80 | 0 |
2019-03-29 | Multi-Stage Fracture | 2642.20 | 2643.10 | 0 |
2019-03-29 | Multi-Stage Fracture | 2599.80 | 2600.70 | 0 |
2019-03-29 | Multi-Stage Fracture | 2558.10 | 2559.00 | 0 |
2019-03-29 | Multi-Stage Fracture | 2515.70 | 2516.60 | 0 |
2019-03-28 | Multi-Stage Fracture | 4287.30 | 4288.20 | 0 |
2019-03-29 | Multi-Stage Fracture | 4231.70 | 4232.60 | 0 |
2019-03-29 | Multi-Stage Fracture | 4189.40 | 4190.30 | 0 |
2019-03-29 | Multi-Stage Fracture | 4134.30 | 4135.20 | 0 |
2019-03-29 | Multi-Stage Fracture | 4078.40 | 4079.30 | 0 |
2019-03-29 | Multi-Stage Fracture | 4036.00 | 4036.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6444 | 0.0 | 0.0 | 0.0 |
2020 | 1847 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-16 | No Incident Encountered | 0.00 | 0.00 |
2019-04-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]