If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796120413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.799673,"lon":-119.826113,"icon":""}]} |
Location: 02/13-04-079-12W6/0 | |
Location Alias: 02/13-04-79-12 W6M | |
Location Alias 2: 02/13-04-079-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 12 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 6-32 HZ 102 PCOUPE 13-4-79-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0491532 | |
License Date: 2018-10-22 | |
License Status: Issued | |
Spud Date: 2018-12-06 | |
Final Drill Date: 2018-12-15 | |
Well Total Depth: 4815.00 m | |
Surface Hole Latitude: 55.799673 | |
Surface Hole Longitude: -119.826113 |
Date | Event |
---|---|
2018-10-22 | Obtained License |
2018-12-07 | Surface Casing Operation Performed |
2018-12-08 | Direction Drilling Operation Performed - Deviate |
2018-12-10 | Direction Drilling Operation Performed - Horizontal |
2018-12-10 | Well Log Performed |
2018-12-15 | Finished Drilling |
2018-12-15 | Well Log Performed |
2018-12-15 | Well Mode changed to Drilled and Cased |
2018-12-16 | Production Casing Operation Performed |
2018-12-16 | Well Log Performed |
2018-12-17 | Rig Released |
2019-02-25 | Well Log Performed |
2019-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-23 | Well Fluid changed to Gas |
2019-03-23 | Well Mode changed to Testing |
2019-05-02 | Well Began Production |
2019-05-02 | Well Fluid changed to Gas |
2019-05-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-12-06 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-12-08 | 1659.00 | Deviate (5 - 79 degrees) |
2018-12-10 | 2357.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-05 | Multi-Stage Fracture | 4788.10 | 4789.40 | 0 |
2019-03-08 | Multi-Stage Fracture | 4287.70 | 4288.60 | 0 |
2019-03-08 | Multi-Stage Fracture | 4240.50 | 4241.40 | 0 |
2019-03-08 | Multi-Stage Fracture | 4181.40 | 4182.30 | 0 |
2019-03-08 | Multi-Stage Fracture | 4122.20 | 4123.10 | 0 |
2019-03-08 | Multi-Stage Fracture | 4074.50 | 4075.40 | 0 |
2019-03-08 | Multi-Stage Fracture | 4015.30 | 4016.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 3967.50 | 3968.40 | 0 |
2019-03-09 | Multi-Stage Fracture | 3908.40 | 3909.30 | 0 |
2019-03-09 | Multi-Stage Fracture | 3849.30 | 3850.20 | 0 |
2019-03-09 | Multi-Stage Fracture | 3801.60 | 3802.50 | 0 |
2019-03-05 | Multi-Stage Fracture | 4727.10 | 4728.00 | 0 |
2019-03-09 | Multi-Stage Fracture | 3742.70 | 3743.60 | 0 |
2019-03-09 | Multi-Stage Fracture | 3695.00 | 3695.90 | 0 |
2019-03-09 | Multi-Stage Fracture | 3635.80 | 3636.70 | 0 |
2019-03-09 | Multi-Stage Fracture | 3588.10 | 3589.00 | 0 |
2019-03-09 | Multi-Stage Fracture | 3529.10 | 3530.00 | 0 |
2019-03-09 | Multi-Stage Fracture | 3470.00 | 3470.90 | 0 |
2019-03-10 | Multi-Stage Fracture | 3422.30 | 3423.20 | 0 |
2019-03-10 | Multi-Stage Fracture | 3363.30 | 3364.20 | 0 |
2019-03-10 | Multi-Stage Fracture | 3315.70 | 3316.60 | 0 |
2019-03-10 | Multi-Stage Fracture | 3256.90 | 3257.80 | 0 |
2019-03-05 | Multi-Stage Fracture | 4667.90 | 4668.80 | 0 |
2019-03-10 | Multi-Stage Fracture | 3197.70 | 3198.60 | 0 |
2019-03-10 | Multi-Stage Fracture | 3149.90 | 3150.80 | 0 |
2019-03-10 | Multi-Stage Fracture | 3090.70 | 3091.60 | 0 |
2019-03-10 | Multi-Stage Fracture | 3043.10 | 3044.00 | 0 |
2019-03-10 | Multi-Stage Fracture | 2983.90 | 2984.80 | 0 |
2019-03-10 | Multi-Stage Fracture | 2924.80 | 2925.70 | 0 |
2019-03-11 | Multi-Stage Fracture | 2877.40 | 2878.30 | 0 |
2019-03-11 | Multi-Stage Fracture | 2818.30 | 2819.20 | 0 |
2019-03-11 | Multi-Stage Fracture | 2770.80 | 2771.70 | 0 |
2019-03-11 | Multi-Stage Fracture | 2711.60 | 2712.50 | 0 |
2019-03-05 | Multi-Stage Fracture | 4620.20 | 4621.10 | 0 |
2019-03-11 | Multi-Stage Fracture | 2664.40 | 2665.30 | 0 |
2019-03-11 | Multi-Stage Fracture | 2605.50 | 2606.40 | 0 |
2019-03-11 | Multi-Stage Fracture | 2546.70 | 2547.60 | 0 |
2019-03-11 | Multi-Stage Fracture | 2499.10 | 2500.00 | 0 |
2019-03-11 | Multi-Stage Fracture | 2451.90 | 2452.80 | 0 |
2019-03-11 | Multi-Stage Fracture | 2415.70 | 2416.60 | 0 |
2019-03-05 | Multi-Stage Fracture | 4561.10 | 4562.00 | 0 |
2019-03-05 | Multi-Stage Fracture | 4501.80 | 4502.70 | 0 |
2019-03-05 | Multi-Stage Fracture | 4454.10 | 4455.00 | 0 |
2019-03-08 | Multi-Stage Fracture | 4394.80 | 4395.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 4347.20 | 4348.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-03-05 | 2019-03-11 | 2,220 | 13,581 | N/A |
2 | 2019-03-09 | 2019-03-09 | 2,220 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.3969 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.4719 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.0911 | N/A | ||
SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0108 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0108 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0108 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0108 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0108 | N/A | ||||
DynaRate 6202D. Friction Reducer | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0274 | N/A | |
2 | DWP-690. Slickwater Breaker | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0363 | N/A |
Water | 7732-18-5 | 100 | 0.0363 | N/A |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6677 | 0.0 | 0.0 | 0.0 |
2020 | 1611 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-12-17 | No Incident Encountered | 0.00 | 0.00 |
2019-03-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]