X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796120216020

Well Details

Well ID: 0796120216020
Loading map...
Location: 02/16-02-079-12W6/0
Location Alias: 02/16-02-79-12 W6M
Location Alias 2: 02/16-02-079-12 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 12
Section: 02
County/Municipality: Saddle Hills County
Well Name: BIR 102 PCOUPES 16-2-79-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0447717
License Date: 2012-08-13
License Status: Issued
Spud Date: 2012-11-29
Final Drill Date: 2012-12-14
Well Total Depth: 4621.00 m
Surface Hole Latitude: 55.806851
Surface Hole Longitude: -119.725581

For data sources see[1][2]

Well History

Date Event
2012-08-13 Obtained License
2012-11-30 Surface Casing Operation Performed
2012-12-03 Direction Drilling Operation Performed - Horizontal
2012-12-06 Intermediate Casing Operation Performed
2012-12-14 Finished Drilling
2012-12-14 Well Mode changed to Drilled and Cased
2012-12-15 Liner Casing Operation Performed
2012-12-18 Perforation Treatment Performed - Open-Hole Completion
2012-12-18 Rig Released
2013-01-07 Well Log Performed
2013-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-20 Well Began Production
2013-02-20 Well Fluid changed to Crude Oil
2013-02-20 Well Mode changed to Flowing
2018-08-23 Well Fluid changed to Crude Oil
2018-08-23 Well Mode changed to Gas Lift
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-29 Trinidad Drilling Ltd. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-03 1790.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-18 Open Hole/Barefoot Completion 4611.00 4621.00 0
2013-01-22 Multi-Stage Fracture 3917.30 3918.50 0
2013-01-22 Multi-Stage Fracture 3845.40 3846.60 0
2013-01-22 Multi-Stage Fracture 3760.10 3761.30 0
2013-01-22 Multi-Stage Fracture 3687.90 3689.20 0
2013-01-22 Multi-Stage Fracture 3601.10 3602.30 0
2013-01-22 Multi-Stage Fracture 3518.30 3519.50 0
2013-01-22 Multi-Stage Fracture 3445.60 3446.80 0
2013-01-22 Multi-Stage Fracture 3361.70 3362.90 0
2013-01-23 Multi-Stage Fracture 3289.00 3290.30 0
2013-01-23 Multi-Stage Fracture 3203.10 3204.30 0
2013-01-21 Multi-Stage Fracture 4557.10 4559.20 0
2013-01-23 Multi-Stage Fracture 3117.40 3118.60 0
2013-01-23 Multi-Stage Fracture 3045.10 3046.30 0
2013-01-23 Multi-Stage Fracture 2964.10 2965.30 0
2013-01-23 Multi-Stage Fracture 2878.40 2879.60 0
2013-01-23 Multi-Stage Fracture 2805.10 2806.40 0
2013-01-23 Multi-Stage Fracture 2719.90 2721.10 0
2013-01-23 Multi-Stage Fracture 2647.40 2648.60 0
2013-01-23 Multi-Stage Fracture 2563.30 2564.50 0
2013-01-23 Multi-Stage Fracture 2481.70 2482.90 0
2013-01-23 Multi-Stage Fracture 2409.60 2410.80 0
2013-01-21 Multi-Stage Fracture 4484.30 4485.50 0
2013-01-24 Multi-Stage Fracture 2324.20 2325.40 0
2013-01-24 Multi-Stage Fracture 2239.60 2240.80 0
2013-01-21 Multi-Stage Fracture 4399.20 4400.40 0
2013-01-21 Multi-Stage Fracture 4314.80 4316.00 0
2013-01-22 Multi-Stage Fracture 4243.30 4244.50 0
2013-01-22 Multi-Stage Fracture 4157.20 4158.40 0
2013-01-22 Multi-Stage Fracture 4085.40 4086.60 0
2013-01-22 Multi-Stage Fracture 4000.80 4002.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-21 2013-01-24 2,092 14,564 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.632 N/A
Proppant Trican Crystalline silica. quartz 14808-60-7 100 8.6711 N/A
FR-8 Trican Friction Reducer Ammonium Chloride 12125-02-9 100 0.0269 N/A
Not hazardous Not Available 100 0.0553 N/A
Petroleum Distillate 64742-47-8 100 0.0587 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2012-12-15 2013-01-23 Surface Water - Runoff 13294

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4312 0.0 0.0 0.0
2014 8111 0.0 0.0 0.0
2015 8637 0.0 0.0 0.0
2016 8675 0.0 0.0 0.0
2017 6458 0.0 0.0 0.0
2018 7637 0.0 0.0 0.0
2019 8296 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-18 No Incident Encountered 0.00 0.00
2013-02-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References