X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796111605000

Well Details

Well ID: 0796111605000
Loading map...
Location: 00/05-16-079-11W6/0
Location Alias: 00/05-16-79-11 W6M
Location Alias 2: 00/05-16-079-11 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 11
Section: 16
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 5-16-79-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0451023
License Date: 2012-11-29
License Status: Amended
Spud Date: 2013-01-03
Final Drill Date: 2013-01-29
Well Total Depth: 5516.00 m
Surface Hole Latitude: 55.819354
Surface Hole Longitude: -119.634178

For data sources see[1][2]

Well History

Date Event
2012-11-29 Obtained License
2013-01-03 Direction Drilling Operation Performed - Deviate
2013-01-04 Direction Drilling Operation Performed - Deviate
2013-01-04 Surface Casing Operation Performed
2013-01-08 Direction Drilling Operation Performed - Deviate
2013-01-12 Intermediate Casing Operation Performed
2013-01-16 Direction Drilling Operation Performed - Horizontal
2013-01-29 Finished Drilling
2013-01-29 Well Mode changed to Drilled and Cased
2013-02-02 Liner Casing Operation Performed
2013-02-02 Perforation Treatment Performed - Open-Hole Completion
2013-02-02 Rig Released
2013-02-12 Well Log Performed
2013-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-11 Well Fluid changed to Gas
2013-04-11 Well Mode changed to Testing
2013-06-10 Well Began Production
2013-06-10 Well Fluid changed to Gas
2013-06-10 Well Mode changed to Flowing
2017-11-20 Well Fluid changed to Gas
2017-11-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-03 Trinidad Drilling Ltd. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-03 192.00 Deviate (5 - 79 degrees)
2013-01-04 388.00 Deviate (5 - 79 degrees)
2013-01-08 1803.00 Deviate (5 - 79 degrees)
2013-01-16 2144.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-02 Open Hole/Barefoot Completion 5509.00 5516.00 0
2013-02-21 Multi-Stage Fracture 4278.80 4279.90 0
2013-02-21 Multi-Stage Fracture 4137.00 4138.30 0
2013-02-21 Multi-Stage Fracture 3995.50 3996.70 0
2013-02-21 Multi-Stage Fracture 3853.80 3855.10 0
2013-02-21 Multi-Stage Fracture 3712.20 3713.40 0
2013-02-21 Multi-Stage Fracture 3570.50 3571.70 0
2013-02-21 Multi-Stage Fracture 3415.00 3416.20 0
2013-02-21 Multi-Stage Fracture 3273.30 3274.50 0
2013-02-21 Multi-Stage Fracture 3131.50 3132.70 0
2013-02-21 Multi-Stage Fracture 2989.70 2990.90 0
2013-02-20 Multi-Stage Fracture 5427.30 5429.40 0
2013-02-22 Multi-Stage Fracture 2848.10 2849.30 0
2013-02-22 Multi-Stage Fracture 2706.10 2707.30 0
2013-02-22 Multi-Stage Fracture 2564.20 2565.50 0
2013-02-22 Multi-Stage Fracture 2408.80 2410.00 0
2013-02-22 Multi-Stage Fracture 2267.10 2268.30 0
2013-02-20 Multi-Stage Fracture 5283.90 5285.20 0
2013-02-20 Multi-Stage Fracture 5142.40 5143.60 0
2013-02-20 Multi-Stage Fracture 5000.70 5001.90 0
2013-02-20 Multi-Stage Fracture 4859.00 4860.30 0
2013-02-21 Multi-Stage Fracture 4717.30 4718.50 0
2013-02-21 Multi-Stage Fracture 4561.90 4563.20 0
2013-02-21 Multi-Stage Fracture 4420.20 4421.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-20 2013-02-22 2,048 10,268 N/A
2 2013-02-21 2013-02-21 2,048 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 81.3519 N/A
Proppant Preferred Sands Crystalline silica. quartz 14808-60-7 100 9.1423 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.057 N/A
Non-Hazardous Not Available 100 0.057 N/A
2 Proppant Sanjel Crystalline silica. quartz 14808-60-7 100 16.1853 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-16 2013-02-22 Surface Water - Runoff 10458
2013-02-01 2013-02-01 Municipal Water 28

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2959 0.0 0.0 0.0
2014 7103 0.0 0.0 0.0
2015 2112 0.0 0.0 0.0
2016 8183 0.0 0.0 0.0
2017 3744 0.0 0.0 0.0
2018 3888 0.0 0.0 0.0
2019 2349 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-02 No Incident Encountered 0.00 0.00
2013-02-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References