If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796110913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.819275,"lon":-119.634105,"icon":""}]} |
Location: 00/13-09-079-11W6/0 | |
Location Alias: 00/13-09-79-11 W6M | |
Location Alias 2: 00/13-09-079-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 11 | |
Section: 09 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR PCOUPES 13-9-79-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0445853 | |
License Date: 2012-05-14 | |
License Status: Issued | |
Spud Date: 2012-07-03 | |
Final Drill Date: 2012-07-21 | |
Well Total Depth: 4959.00 m | |
Surface Hole Latitude: 55.819275 | |
Surface Hole Longitude: -119.634105 |
Date | Event |
---|---|
2012-05-14 | Obtained License |
2012-07-03 | Direction Drilling Operation Performed - Deviate |
2012-07-05 | Surface Casing Operation Performed |
2012-07-12 | Intermediate Casing Operation Performed |
2012-07-13 | Direction Drilling Operation Performed - Horizontal |
2012-07-21 | Finished Drilling |
2012-07-21 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-21 | Well Mode changed to Drilled and Cased |
2012-07-23 | Production Casing Operation Performed |
2012-07-25 | Rig Released |
2013-02-14 | Well Log Performed |
2013-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-04-13 | Well Fluid changed to Gas |
2013-04-13 | Well Mode changed to Testing |
2013-04-28 | Well Began Production |
2013-04-28 | Well Fluid changed to Gas |
2013-04-28 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-03 | Trinidad Drilling Ltd. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-03 | 186.50 | Deviate (5 - 79 degrees) |
2012-07-13 | 2152.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-21 | Open Hole/Barefoot Completion | 4940.00 | 4959.00 | 0 |
2013-02-19 | Multi-Stage Fracture | 3754.00 | 3755.30 | 0 |
2013-02-19 | Multi-Stage Fracture | 3627.40 | 3628.60 | 0 |
2013-02-19 | Multi-Stage Fracture | 3500.20 | 3501.40 | 0 |
2013-02-19 | Multi-Stage Fracture | 3373.60 | 3374.80 | 0 |
2013-02-19 | Multi-Stage Fracture | 3246.70 | 3247.90 | 0 |
2013-02-19 | Multi-Stage Fracture | 3119.40 | 3120.60 | 0 |
2013-02-19 | Multi-Stage Fracture | 2980.20 | 2981.40 | 0 |
2013-02-19 | Multi-Stage Fracture | 2852.80 | 2854.00 | 0 |
2013-02-19 | Multi-Stage Fracture | 2726.90 | 2728.20 | 0 |
2013-02-19 | Multi-Stage Fracture | 2600.70 | 2601.90 | 0 |
2013-02-18 | Multi-Stage Fracture | 4898.90 | 4900.90 | 0 |
2013-02-20 | Multi-Stage Fracture | 2472.80 | 2474.00 | 0 |
2013-02-20 | Multi-Stage Fracture | 2346.30 | 2347.60 | 0 |
2013-02-20 | Multi-Stage Fracture | 2220.20 | 2221.50 | 0 |
2013-02-18 | Multi-Stage Fracture | 4770.10 | 4771.40 | 0 |
2013-02-18 | Multi-Stage Fracture | 4642.50 | 4643.70 | 0 |
2013-02-18 | Multi-Stage Fracture | 4514.90 | 4516.20 | 0 |
2013-02-18 | Multi-Stage Fracture | 4387.80 | 4388.90 | 0 |
2013-02-19 | Multi-Stage Fracture | 4260.40 | 4261.60 | 0 |
2013-02-19 | Multi-Stage Fracture | 4133.90 | 4135.10 | 0 |
2013-02-19 | Multi-Stage Fracture | 4006.60 | 4007.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-18 | 2013-02-20 | 2,038 | 8,208 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 79.0814 | N/A | |||
Proppant | Preferred Sands | Crystalline silica. quartz | 14808-60-7 | 100 | 20.8652 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0533 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0533 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-02-18 | 2013-02-20 | Surface Water - Runoff | 7825 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5274 | 0.0 | 0.0 | 0.0 |
2014 | 8567 | 0.0 | 0.0 | 0.0 |
2015 | 8039 | 0.0 | 0.0 | 0.0 |
2016 | 8421 | 0.0 | 0.0 | 0.0 |
2017 | 7166 | 0.0 | 0.0 | 0.0 |
2018 | 7665 | 0.0 | 0.0 | 0.0 |
2019 | 7488 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-25 | No Incident Encountered | 0.00 | 0.00 |
2013-02-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]