X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796110801000

Well Details

Well ID: 0796110801000
Loading map...
Location: 00/01-08-079-11W6/0
Location Alias: 00/01-08-79-11 W6M
Location Alias 2: 00/01-08-079-11 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 11
Section: 08
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 1-8-79-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0418288
License Date: 2010-02-04
License Status: Issued
Spud Date: 2010-03-23
Final Drill Date: 2010-04-06
Well Total Depth: 4365.00 m
Surface Hole Latitude: 55.812484
Surface Hole Longitude: -119.647262

For data sources see[1][2]

Well History

Date Event
2010-02-04 Obtained License
2010-03-24 Surface Casing Operation Performed
2010-03-27 Direction Drilling Operation Performed - Horizontal
2010-04-01 Well Log Performed
2010-04-06 Finished Drilling
2010-04-06 Well Log Performed
2010-04-06 Well Mode changed to Drilled and Cased
2010-04-07 Production Casing Operation Performed
2010-04-07 Rig Released
2010-10-20 Perforation Treatment Performed - Jet Perforation
2010-11-28 Perforation Treatment Performed - Jet Perforation
2010-11-30 Perforation Treatment Performed - Fractured
2010-11-30 Perforation Treatment Performed - Jet Perforation
2010-12-01 Perforation Treatment Performed - Fractured
2010-12-01 Perforation Treatment Performed - Jet Perforation
2010-12-02 Perforation Treatment Performed - Fractured
2010-12-02 Perforation Treatment Performed - Jet Perforation
2010-12-03 Perforation Treatment Performed - Fractured
2010-12-03 Perforation Treatment Performed - Jet Perforation
2010-12-04 Perforation Treatment Performed - Fractured
2010-12-04 Perforation Treatment Performed - Jet Perforation
2010-12-05 Perforation Treatment Performed - Fractured
2010-12-05 Perforation Treatment Performed - Jet Perforation
2010-12-06 Perforation Treatment Performed - Fractured
2010-12-06 Perforation Treatment Performed - Jet Perforation
2010-12-07 Perforation Treatment Performed - Fractured
2010-12-07 Perforation Treatment Performed - Jet Perforation
2010-12-08 Perforation Treatment Performed - Fractured
2010-12-08 Well Fluid changed to Gas
2010-12-08 Well Mode changed to Testing
2010-12-09 Perforation Treatment Performed - Fractured
2010-12-09 Perforation Treatment Performed - Jet Perforation
2010-12-10 Perforation Treatment Performed - Fractured
2010-12-10 Perforation Treatment Performed - Jet Perforation
2010-12-11 Perforation Treatment Performed - Fractured
2010-12-11 Perforation Treatment Performed - Jet Perforation
2011-03-11 Well Began Production
2011-03-11 Well Fluid changed to Gas
2011-03-11 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-27 1828.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-20 Perforation 4313.50 4315.00 20
2010-12-03 Perforation 3713.50 3715.00 20
2010-12-04 Fracture 3713.50 3715.00 0
2010-12-04 Perforation 3563.50 3565.00 20
2010-12-05 Fracture 3563.50 3565.00 0
2010-12-05 Perforation 3413.50 3415.00 20
2010-12-06 Fracture 3413.50 3415.00 0
2010-12-06 Perforation 3263.50 3265.00 20
2010-12-06 Fracture 3263.50 3265.00 0
2010-12-07 Perforation 3113.50 3115.00 20
2010-12-07 Fracture 3113.50 3115.00 0
2010-11-28 Perforation 4298.50 4300.00 20
2010-12-07 Perforation 2963.50 2965.00 20
2010-12-08 Fracture 2963.50 2965.00 0
2010-12-09 Perforation 2813.50 2815.00 20
2010-12-09 Fracture 2813.50 2815.00 0
2010-12-10 Perforation 2663.50 2665.00 20
2010-12-10 Fracture 2663.50 2665.00 0
2010-12-10 Perforation 2463.50 2465.00 20
2010-12-11 Fracture 2463.50 2465.00 0
2010-12-11 Perforation 2313.50 2315.00 20
2010-12-11 Fracture 2313.50 2315.00 0
2010-11-30 Fracture 4298.50 4300.00 0
2010-11-30 Perforation 4163.50 4165.00 20
2010-12-01 Fracture 4163.50 4165.00 0
2010-12-01 Perforation 4013.50 4015.00 20
2010-12-02 Fracture 4013.50 4015.00 0
2010-12-02 Perforation 3863.50 3865.00 20
2010-12-03 Fracture 3863.50 3865.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 96 0.0 0.0 0.0
2011 6669 0.0 0.0 0.0
2012 7369 0.0 0.0 0.0
2013 8315 0.0 0.0 0.0
2014 8519 0.0 0.0 0.0
2015 7175 0.0 0.0 0.0
2016 8331 0.0 0.0 0.0
2017 7444 0.0 0.0 0.0
2018 7870 0.0 0.0 0.0
2019 7349 0.0 0.0 0.0
2020 1948 0.0 0.0 0.0

For data sources see[6]

References