If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796110513000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.811844,"lon":-119.674361,"icon":""}]} |
Location: 00/13-05-079-11W6/0 | |
Location Alias: 00/13-05-79-11 W6M | |
Location Alias 2: 00/13-05-079-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 11 | |
Section: 05 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR PCOUPES 13-5-79-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0433000 | |
License Date: 2011-04-13 | |
License Status: Issued | |
Spud Date: 2011-05-27 | |
Final Drill Date: 2011-06-09 | |
Well Total Depth: 3984.00 m | |
Surface Hole Latitude: 55.811844 | |
Surface Hole Longitude: -119.674361 |
Date | Event |
---|---|
2011-04-13 | Obtained License |
2011-05-28 | Surface Casing Operation Performed |
2011-05-31 | Direction Drilling Operation Performed - Horizontal |
2011-06-05 | Well Log Performed |
2011-06-08 | Well Log Performed |
2011-06-09 | Finished Drilling |
2011-06-09 | Well Mode changed to Drilled and Cased |
2011-06-10 | Production Casing Operation Performed |
2011-06-11 | Rig Released |
2011-07-19 | Perforation Treatment Performed - Jet Perforation |
2011-07-21 | Perforation Treatment Performed - Fractured |
2011-07-21 | Perforation Treatment Performed - Jet Perforation |
2011-07-21 | Well Log Performed |
2011-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-07-22 | Perforation Treatment Performed - Fractured |
2011-07-22 | Perforation Treatment Performed - Jet Perforation |
2011-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-07-23 | Perforation Treatment Performed - Fractured |
2011-07-23 | Perforation Treatment Performed - Jet Perforation |
2011-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-07-24 | Perforation Treatment Performed - Fractured |
2011-07-24 | Perforation Treatment Performed - Jet Perforation |
2011-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-07-25 | Perforation Treatment Performed - Fractured |
2011-07-25 | Perforation Treatment Performed - Jet Perforation |
2011-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-07-26 | Perforation Treatment Performed - Fractured |
2011-07-26 | Perforation Treatment Performed - Jet Perforation |
2011-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-07-27 | Perforation Treatment Performed - Fractured |
2011-07-27 | Perforation Treatment Performed - Jet Perforation |
2011-07-31 | Perforation Treatment Performed - Jet Perforation |
2011-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-01 | Perforation Treatment Performed - Fractured |
2011-08-01 | Perforation Treatment Performed - Jet Perforation |
2011-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-02 | Perforation Treatment Performed - Fractured |
2011-08-02 | Perforation Treatment Performed - Jet Perforation |
2011-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-03 | Perforation Treatment Performed - Fractured |
2011-08-03 | Perforation Treatment Performed - Jet Perforation |
2011-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-04 | Perforation Treatment Performed - Fractured |
2011-08-05 | Perforation Treatment Performed - Jet Perforation |
2011-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-06 | Perforation Treatment Performed - Fractured |
2011-08-12 | Well Fluid changed to Gas |
2011-08-12 | Well Mode changed to Testing |
2011-11-22 | Well Began Production |
2011-11-22 | Well Fluid changed to Gas |
2011-11-22 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-05-31 | 1860.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-07-19 | Perforation | 3966.70 | 3966.90 | 13 |
2011-07-24 | Perforation | 3366.50 | 3367.50 | 13 |
2011-07-24 | Acid Treatment | 3516.50 | 3517.50 | 0 |
2011-07-24 | Fracture | 3516.50 | 3517.50 | 0 |
2011-07-25 | Perforation | 3216.50 | 3217.50 | 13 |
2011-07-25 | Acid Treatment | 3366.50 | 3367.50 | 0 |
2011-07-25 | Fracture | 3366.50 | 3367.50 | 0 |
2011-07-26 | Perforation | 3066.50 | 3067.50 | 13 |
2011-07-26 | Acid Treatment | 3216.50 | 3217.50 | 0 |
2011-07-26 | Fracture | 3216.50 | 3217.50 | 0 |
2011-07-27 | Perforation | 2916.50 | 2917.50 | 13 |
2011-07-21 | Perforation | 3816.50 | 3817.50 | 13 |
2011-07-27 | Acid Treatment | 2916.50 | 2917.50 | 0 |
2011-07-27 | Acid Treatment | 3066.50 | 3067.50 | 0 |
2011-07-27 | Fracture | 3066.50 | 3067.50 | 0 |
2011-07-31 | Perforation | 2881.50 | 2882.00 | 6 |
2011-08-01 | Perforation | 2766.50 | 2767.50 | 13 |
2011-08-01 | Acid Treatment | 2881.50 | 2882.00 | 0 |
2011-08-01 | Fracture | 2881.50 | 2882.00 | 0 |
2011-08-02 | Perforation | 2616.50 | 2617.50 | 13 |
2011-08-02 | Acid Treatment | 2766.50 | 2767.50 | 0 |
2011-08-02 | Fracture | 2766.50 | 2767.50 | 0 |
2011-07-21 | Fracture | 3966.70 | 3966.90 | 0 |
2011-08-03 | Perforation | 2464.50 | 2465.50 | 13 |
2011-08-03 | Acid Treatment | 2616.50 | 2617.50 | 0 |
2011-08-03 | Fracture | 2616.50 | 2617.50 | 0 |
2011-08-04 | Acid Treatment | 2464.50 | 2465.50 | 0 |
2011-08-04 | Fracture | 2464.50 | 2465.50 | 0 |
2011-08-05 | Perforation | 2316.50 | 2317.50 | 13 |
2011-08-06 | Acid Treatment | 2316.50 | 2317.50 | 0 |
2011-08-06 | Fracture | 2316.50 | 2317.50 | 0 |
2011-07-22 | Perforation | 3666.50 | 3667.50 | 13 |
2011-07-22 | Acid Treatment | 3816.50 | 3817.50 | 0 |
2011-07-22 | Fracture | 3816.50 | 3817.50 | 0 |
2011-07-23 | Perforation | 3516.50 | 3517.50 | 13 |
2011-07-23 | Acid Treatment | 3666.50 | 3667.50 | 0 |
2011-07-23 | Fracture | 3666.50 | 3667.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 755 | 0.0 | 0.0 | 0.0 |
2012 | 7320 | 0.0 | 0.0 | 0.0 |
2013 | 7928 | 0.0 | 0.0 | 0.0 |
2014 | 6863 | 0.0 | 0.0 | 0.0 |
2015 | 8183 | 0.0 | 0.0 | 0.0 |
2016 | 7167 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 7440 | 0.0 | 0.0 | 0.0 |
2019 | 7919 | 0.0 | 0.0 | 0.0 |
2020 | 2042 | 0.0 | 0.0 | 0.0 |
For data sources see[6]