X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796102703000

Well Details

Well ID: 0796102703000
Loading map...
Location: 00/03-27-079-10W6/0
Location Alias: 00/03-27-79-10 W6M
Location Alias 2: 00/03-27-079-10 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 10
Section: 27
County/Municipality: Saddle Hills County
Well Name: CNGL GORD 3-27-79-10
Operator Name: Harvest Operations Corp.
License Number: 0187304
License Date: 1996-04-19
License Status: Abandoned
Spud Date: 1996-05-30
Final Drill Date: 1996-06-18
Well Total Depth: 2360.00 m
Surface Hole Latitude: 55.871786
Surface Hole Longitude: -119.476862

For data sources see[1][2]

Well History

Date Event
1996-04-19 Obtained License
1996-05-31 Surface Casing Operation Performed
1996-06-08 Direction Drilling Operation Performed - Deviate
1996-06-15 Well Log Performed
1996-06-18 Finished Drilling
1996-06-18 Well Mode changed to Drilled and Cased
1996-06-19 Drill Stem Test Performed
1996-06-19 Well Log Performed
1996-06-20 Drill Stem Test Performed
1996-06-22 Production Casing Operation Performed
1996-06-22 Rig Released
1996-10-04 Perforation Treatment Performed - Jet Perforation
1996-10-04 Well Log Performed
1996-10-25 Perforation Treatment Performed - Jet Perforation
1996-10-25 Well Log Performed
1996-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-29 Perforation Treatment Performed - Cement Squeeze
1996-11-02 Perforation Treatment Performed - Jet Perforation
1996-11-03 Perforation Treatment Performed - Fractured
1997-12-21 Well Began Production
1997-12-21 Well Fluid changed to Gas
1997-12-21 Well Mode changed to Flowing
2003-10-16 Well Structure changed to Commingled
2011-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-04 Plug Back Performed
2011-06-04 Well Log Performed
2011-06-04 Well Mode changed to Abandoned Zone
2011-06-04 Well Structure changed to Commingled
2011-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-05 Plug Back Performed
2011-06-05 Well Log Performed
2011-06-06 Well Log Performed
2011-06-07 Well Log Performed
2011-06-10 Perforation Treatment Performed - Jet Perforation
2011-06-10 Well Log Performed
2011-06-11 Perforation Treatment Performed - Remedial Casing
2011-06-14 Perforation Treatment Performed - Jet Perforation
2011-06-14 Perforation Treatment Performed - Remedial Casing
2011-06-14 Well Log Performed
2011-06-23 Perforation Treatment Performed - Jet Perforation
2011-06-23 Perforation Treatment Performed - Remedial Casing
2011-06-23 Well Log Performed
2011-06-30 Perforation Treatment Performed - Jet Perforation
2011-06-30 Well Log Performed
2011-07-01 Perforation Treatment Performed - Cement Plug
2011-07-01 Perforation Treatment Performed - Remedial Casing
2011-10-02 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-08 1695.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-04 Perforation 2140.50 2142.50 13
2011-06-11 Remedial Casing Cementing 954.00 956.00 0
2011-06-14 Perforation 866.00 868.00 13
2011-06-14 Remedial Casing Cementing 866.00 868.00 0
2011-06-23 Perforation 528.00 532.00 13
2011-06-23 Remedial Casing Cementing 528.00 532.00 0
2011-06-30 Perforation 497.00 500.00 13
2011-06-30 Perforation 476.00 479.00 13
2011-07-01 Remedial Casing Cementing 497.00 500.00 0
2011-07-01 Remedial Casing Cementing 476.00 479.00 0
2011-07-01 Cement Plug 855.00 1002.00 0
1996-10-25 Perforation 1597.00 1599.00 13
2011-07-01 Cement Plug 439.00 529.00 0
1996-10-27 Acid Treatment 1597.00 1599.00 0
1996-10-29 Cement Squeeze 1597.00 1599.00 0
1996-11-02 Perforation 1334.00 1337.50 13
1996-11-03 Fracture 1334.00 1337.50 0
2011-06-04 Packing Device Capped w/Cement 2122.00 2130.00 0
2011-06-05 Packing Device Capped w/Cement 1316.00 1324.00 0
2011-06-10 Perforation 954.00 956.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 61 0.0 0.0 0.0
1998 2123 0.0 0.0 0.0

For data sources see[6]

References