X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796102106000

Well Details

Well ID: 0796102106000
Loading map...
Location: 00/06-21-079-10W6/0
Location Alias: 00/06-21-79-10 W6M
Location Alias 2: 00/06-21-079-10 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 10
Section: 21
County/Municipality: Saddle Hills County
Well Name: FINA ROYALITE GORD IN 6-21-79-10
Operator Name: Olympia Energy Ventures Ltd.
License Number: 0012182
License Date: 1956-08-30
License Status: RecCertified
Spud Date: 1956-08-31
Final Drill Date: 1956-09-21
Well Total Depth: 1485.90 m
Surface Hole Latitude: 55.859824
Surface Hole Longitude: -119.504371

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-08-30 Obtained License
1956-09-06 Drill Stem Test Performed
1956-09-07 Drill Stem Test Performed
1956-09-18 Drill Stem Test Performed
1956-09-19 Drill Stem Test Performed
1956-09-21 Finished Drilling
1956-09-27 Production Casing Operation Performed
1956-09-30 Perforation Treatment Performed - Bullet Perforation
1956-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-10-03 Perforation Treatment Performed - Acid Wash - No Pressure
1956-10-03 Perforation Treatment Performed - Jet Perforation
1956-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-10-04 Perforation Treatment Performed - Jet Perforation
1956-10-05 Perforation Treatment Performed - Bullet Perforation
1956-10-05 Well Mode changed to Drilled and Cased
1957-12-08 Well Began Production
1957-12-08 Well Fluid changed to Gas
1957-12-08 Well Mode changed to Flowing
1962-02-28 Well Fluid changed to Gas
1962-02-28 Well Mode changed to Suspended
1964-06-01 Well Began Injection
1964-06-01 Well Fluid changed to Water
1964-06-01 Well Type changed to Disposal
1964-12-01 Well Fluid changed to Water
1964-12-01 Well Mode changed to Suspended
1964-12-01 Well Type changed to Disposal
1965-09-11 Perforation Treatment Performed - Cement Plug
1965-09-17 Well Abandoned
1965-09-17 Well Fluid changed to Water
1965-09-17 Well Mode changed to Abandoned
1965-09-17 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-30 Bullet Perforation 1433.20 1434.40 26
1965-09-11 Cement Plug 823.00 865.60 0
1956-10-01 Acid Treatment 1433.20 1434.40 0
1956-10-02 Packing Device Capped w/Cement 1427.70 1430.70 0
1956-10-03 Perforation 1423.40 1424.90 26
1956-10-03 Acid Wash 1423.40 1424.90 0
1956-10-04 Perforation 1423.40 1424.90 13
1956-10-04 Acid Treatment 1423.40 1424.90 0
1956-10-04 Packing Device Capped w/Cement 1400.60 1400.60 0
1956-10-05 Bullet Perforation 848.90 850.40 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References